Subject: Highway Works Programme 2011/12

To:                              Maidstone Joint Transportation Board

 

By:                              KCC Highways, Transportation & Waste

 

Date:                           16th October 2019

 

Subject:                      Highway Forward Works Programme – 2019/20 onwards

 

Classification:           Information Only

 

 

Summary: This report updates Members on the identified schemes approved for construction

 

 

1. Introduction

 

This report provides an update and summarises schemes that have been programmed for delivery in 2019/20.

 

Kent County Council has agreed a substantial increase in the budget for planned highway works over the next three years, and as a result we are still in the process of identifying and designing schemes for inclusion in our full Year One to Two (2019/20 and 2020/21) and Year Three to Five (2021/22 to 2023/24) programmes. Because of this, we have decided to publish an interim programme, and to publish the full programmes later this year.  For some assets this interim programme covers approximately the first six months of 2019/20, whilst for others it includes most of the works planned for the whole year.

 

This programme is subject to regular review and may change for several reasons including budget allocation, contract rate changes, and to reflect KCC’s changing priorities. The programme and extent of individual sites within the programme may also be revised following engineering assessment during the design phase.

 

Road, Footway & Cycleway Renewal and Preservation Schemes – see Appendix A

           

Drainage Repairs & Improvements – see Appendix B

 

Street Lighting – see Appendix C

 

Transportation and Safety Schemes see Appendix D

  • Casualty Reduction Measures
  • Externally funded schemes
  • Local Growth Fund

 

Developer Funded Works – see Appendix E

 

Bridge Works – see Appendix F

 

Traffic Systems – see Appendix G

 

Combined Member Fund – see Appendix H

 

Conclusion

 

1.    This report is for Members’ information.

 

Contact Officers:

 

The following contact officers can be contacted on 03000 418181

 

Kirstie Williams                                   Highway Manager Mid Kent

Susan Laporte                                     Maidstone District Manager

Alan Casson                                        Strategic Asset Manager                   

Earl Bourner                                        Drainage & Structures Asset Manager

Sue Kinsella                                        Street Light Asset Manager

Toby Butler                                         Traffic & Network Solutions Asset Manager

Jamie Hare                                         Development Agreements Manager

Jamie Watson                                     Schemes Programme Manager

                                   


Appendix A – Footway and Carriageway Improvement Schemes

 

The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged, and the residents will be informed by a letter drop to their homes.

 

 

Machine Resurfacing – Contact Officer Mr Byron Lovell

Road Name

Parish

Extent of Works

Current Status

A274 Maidstone Road

Langley

From the B2163 Upper Street to Warmlake Road

Programmed 21st November 2019

A20 King Street

 Maidstone

Watt Tyler Way and Wyke Manor Road

 

Programmed 2nd December 2019

A229 Linton Road

Loose

From Lancet Lane to Rosemount Close

 

Programmed 30th November 2019

Forstal Road

Aylesford

From bridge deck over motorway to Beddow Way

 

Programmed 8th November 2019

A229 Sheals Crescent

 Maidstone

From Loose Road (through Hayle Road, College Road, Mill Street) to Bishops Way

 

Programmed 14th November 2019

A229 Palace Avenue

Maidstone

Mill Street and A249 Mote Road

 

Programmed 27th November 2019

A229 Upper Stone Street

Maidstone

A249 Mote Road to Old Tovil Road

 

Programmed 11th December 2019

A20/A26 Rocky Hill

Maidstone

Maidstone Gyratory to Terrace Road

 

To be programmed 2020

 

Footway Improvement - Contact Officer Mr Neil Tree

Road Name

Parish

Extent and Description of Works

Current Status

Mote Road

Maidstone

From the junction with Square Hill Road to Willow Way (Northern side)

(Footway Reconstruction)

 

Completed

 

Winifred Road

Bearsted

Entire length

(Footway Reconstruction).

 

Completed

 

Royston Road

Bearsted

Entire length

(Footway Reconstruction).

 

Completed

 

Rosemary Road

Bearsted

Entire length

(Footway Reconstruction).

 

Completed

 

Trenton Close

Allington

Entire length

(Footway Reconstruction).

 

Designed and to be programmed.

 

Beverley Road

Barming

Entire length

(Footway Protection)

 

Completed

 

Egremont Road

Bearsted

Entire length

(Footway Protection)

 

Completed

 

Roseholme

Maidstone

Entire length

(Footway Protection)

 

Completed

 

Wesley Close

Barming

Entire length

(Footway Protection)

 

Completed

 

 

Broomshaw Road

 

Barming

Entire length

(Footway Protection)

 

Completed

 

Surface Treatments – Contact Officer Mr Jonathan Dean

Micro Surfacing

Road Name

Parish

Extent and Description of Works

Current Status

Glebe Lane

 

 

Maidstone

(Barming)

Tonbridge Road to Farleigh Lane

 

Completed

Gatland Lane

 

Maidstone

(Barming)

Farleigh Lane to Fant Lane

 

 

Completed

Faversham Road

 

Lenham

 

 

Whole Road

 

 

Completed

 

West Street

 

Lenham

Faversham Road to Flint Lane (West Street) Lenham

 

 

Completed

Marden Road

 

Marden

Battle Lane to "Mountain Farmhouse"

 

 

Completed

Maidstone Road

 

Marden

"Hartridge" to 150m north of j/w Milebush Lane (Kiln Farm)

 

 

Completed

Headcorn Road

 

 

Platts Heath / Lenham

Chain Gate Road to Station Approach, Lenham

 

 

Completed

Headcorn Road

 

 

Sandway

Headcorn Road to Sandway Road

 

 

Completed

Sandway Road

 

 

Sandway

Headcorn Road to "Little Biggen"

 

 

Completed

Gallants Lane

 

 

East Farleigh

Lower Road to Heath Road

 

 

Completed

Hunton Road

 

 

Marden

River Beult bridge (Clapper Green) to "Reed Court Cottages"

 

 

Completed

Old Tree Lane/Cliff Hill

 

Boughton Monchelsea

From The Quarries to Combe Bank House -

 

To Be Programmed

Sandway Road

 

 

Platts Heath

Around "Sandway Triangle"

 

 

Completed

Kenward Road

 

 

Yalding

Hunt Street to Yalding Hill

 

 

Completed

Bow Road

 

Wateringbury

Corner after bridge to Hunt Street

 

Completed

Smith’s Hill

 

 

Yalding

 

To Be Confirmed

 

 

Completed

Surface Treatments – Contact Officer Mr Jonathan Dean

Surface Dressing

Road Name

Parish

Extent and Description of Works

Current Status

A20 Ashford Road

 

Hollingbourne

Near j/w Old Mill Road to j/w Roundwell

 

 

Programmed for August 2019

A20 Ashford Road

 

 

Hollingbourne

Old Ashford Road to Northdown Close

 

 

Programmed for August 2019

Charlton Lane

 

 

East Sutton

From Chartway Street to Church Lane

 

Programmed for August 2019

 

 

 

Appendix B - Drainage

 

 

Drainage Repairs & Improvements - Contact Officer Earl Bourner 

Road Name

Parish

Description of Works

Current Status

Green Lane

Chart Sutton

Repair the culvert and edge of road/ verge/ ditch.

Work is in progress. Hopefully completed by 1/9/19.

Tufa Close

Walderslade

Relocation of soakaway

Completed

Smith’s Hill

West Farleigh

Investigation works

Cleansing works complete further investigation required at Shingle Barn Lane.

The Broadway

Maidstone

Surface water system surcharging

It has been identified that the issue is due to the Southern Water system. Southern Water will now be responsible for this site

Dray Corner Road

Headcorn

Further investigation works required

Awaiting start date

Dunn Street

Bredhurst

Repair broken pipe

Awaiting start date

Fisher Street

Maidstone

Reports of broken pipes and repairs to be carried out

Awaiting start date

Lower Road

East Farleigh

Repair broken pipes

Awaiting start date

West Street

Hunton

Repair broken pipes

Awaiting start date

The Street

Boxley

To carry out a drainage CCTV survey and cleanse to locate outfall of system and check for defects.

Originally programmed for 18/8/19, abandoned due to TM issues on the day. New programme date is Sunday 8/9/19.

Sheals Crescent

Maidstone

To carry out drainage CCTV investigation.

Awaiting start date

 

 

 

Appendix C – Street Lighting

 

Column replacement testing of KCC owned streetlights has identified the following as requiring replacement. A status of complete identifies that the column replacement has been carried out. Programme dates are identified for those still requiring replacement.  

 

 

Street Lighting Column Replacement – Contact Officer Sue Kinsella

 

Road Name

Column

Parish

Description of Works

Status

Warwick Place

KWAI502

Maidstone

Lit Sign Replacement

Completion end September 2019

Warwick Place

KWAI501

Maidstone

Lit Sign replacement

Completion end September 2019

Brishing Lane

KBFE010

Maidstone

Replacement of Street Light

Completion by December 2019

High Street

KHDO053

Staplehurst

Replacement of Street Light

Completed

Milton Street

KMCW503

Maidstone

Lit Sign replacement

Completed

Whitmore Street

KWCR501

Maidstone

Lit Sign replacement

Completion by December 2019

Station Road

KSFA029

Staplehurst

Replacement of Street Light

Completion by December 2019

Castle Dene

KCAO002

Maidstone

Replacement of Street Light

Completed

Impton Lane

KIAC001

Boxley

Replacement of Street Light

Completed

Maynards

KMBY002

Marden

Replacement of Street Light

Completed

Egerton Road

KEAQ003

Ringlestone

Replacement of Street Light

Completion by December 2019

King Street

KKAM009

Maidstone

Replacement of Street Light

Completion by December 2019

Woodlands

KXEF107

Boxley

Replacement of Street Light

Completed

Howard Drive

KHFD002

Allington

Replacement of Street Light

Completion by March 2020

 

Howard Drive

KHFD016

Allington

Replacement of Street Light

Completion by March 2020

Trevor Drive

KTCI016

Allington

Replacement of Street Light

Completion by March 2020

ERNEST DRIVE

KEBA004

ALLINGTON

Replacement of Street Light

Completion by March 2020

LEONARD CLOSE

KLBG004

ALLINGTON

Replacement of Street Light

Completion by March 2020

BRACKEN HILL

KBIC008

BOXLEY

Replacement of Street Light

Completion by March 2020

OLD CHATHAM ROAD

KOAI001

BOXLEY

Replacement of Street Light

Completion by March 2020

BELLGROVE COURT

KBIF001

BOXLEY

Replacement of Street Light

Completion by March 2020

BRACKEN HILL

KBIC008

BOXLEY

Replacement of Street Light

Completion by March 2020

WILDFELL CLOSE

KWFE016

BOXLEY

Replacement of Street Light

Completion by March 2020

VICTORIA STREET

KVAJ003

BRIDGE

Replacement of Street Light

Completion by March 2020

CORNWALLIS ROAD

KCFT005

BRIDGE

Replacement of Street Light

Completion by March 2020

TRAPHAM ROAD

KTCF006

BRIDGE

Replacement of Street Light

Completion by March 2020

PALMAR ROAD

KPAF007

BRIDGE

Replacement of Street Light

Completion by March 2020

PEMBROKE ROAD

KPAW014

COXHEATH & HUNTON

Replacement of Street Light

Completion by March 2020

DERINGWOOD DRIVE

KDAL005

DOWNSWOOD & OTHAM

Replacement of Street Light

Completion by March 2020

DERINGWOOD DRIVE

KDAL006

DOWNSWOOD & OTHAM

Replacement of Street Light

Completion by March 2020

DERINGWOOD DRIVE

KDAL007

DOWNSWOOD & OTHAM

Replacement of Street Light

Completion by March 2020

DERINGWOOD DRIVE

KDAL009

DOWNSWOOD & OTHAM

Replacement of Street Light

Completion by March 2020

DERINGWOOD DRIVE

KDAL021

DOWNSWOOD & OTHAM

Replacement of Street Light

Completion by March 2020

DERINGWOOD DRIVE

KDAL022

DOWNSWOOD & OTHAM

Replacement of Street Light

Completion by March 2020

TONBRIDGE ROAD

KTBU017

FANT

Replacement of Street Light

Completion by March 2020

TONBRIDGE ROAD

KTBU022

FANT

Replacement of Street Light

Completion by March 2020

TONBRIDGE ROAD

KTBU031

FANT

Replacement of Street Light

Completion by March 2020

TONBRIDGE ROAD

KTBU036

FANT

Replacement of Street Light

Completion by March 2020

TONBRIDGE ROAD

KTBU046

FANT

Replacement of Street Light

Completion by March 2020

TONBRIDGE ROAD

KTBU050

FANT

Replacement of Street Light

Completion by March 2020

TONBRIDGE ROAD

KTBU051

FANT

Replacement of Street Light

Completion by March 2020

TONBRIDGE ROAD

KTBU055

FANT

Replacement of Street Light

Completion by March 2020

MANSFIELD WALK

KMFW202

FANT

Replacement of Street Light

Completion by March 2020

WHITMORE STREET

KWCR005

FANT

Replacement of Street Light

Completion by March 2020

DOVER STREET

KDBB004

FANT

Replacement of Street Light

Completion by March 2020

GLEBE LANE

KGAS006

FANT

Replacement of Street Light

Completion by March 2020

TERMINUS ROAD

KTAD009

FANT

Replacement of Street Light

Completion by March 2020

OAKWOOD COURT

KOAD003

HEATH

Replacement of Street Light

Completion by March 2020

HEATH ROAD

KHCH005

HEATH

Replacement of Street Light

Completion by March 2020

QUEENS ROAD

KQAG004

HEATH

Replacement of Street Light

Completion by March 2020

QUEENS ROAD

KQAG019

HEATH

Replacement of Street Light

Completion by March 2020

CHARLBURY CLOSE

KCBH001

HEATH

Replacement of Street Light

Completion by March 2020

STANFORD DRIVE

KSEI001

HEATH

Replacement of Street Light

Completion by March 2020

MILL WALK

KMCT002

HEATH

Replacement of Street Light

Completion by March 2020

ST PETERS BRIDGE

KSCE001

HIGH STREET

Replacement of Street Light

Completion by March 2020

COLLEGE ROAD

KCFC005

HIGH STREET

Replacement of Street Light

Completion by March 2020

LOWER ROAD

KLCU003

HIGH STREET

Replacement of Street Light

Completion by March 2020

UPPER ROAD

KUBR010

HIGH STREET

Replacement of Street Light

Completion by March 2020

KING STREET

KKAM021

HIGH STREET

Replacement of Street Light

Completion by March 2020

LINTON ROAD

KLBS011

LOOSE

Replacement of Street Light

Completion by March 2020

LOOSE ROAD

KLCQ094

MAIDSTONE

Replacement of Street Light

Completion by March 2020

EGERTON ROAD

KEAQ001

NORTH

Replacement of Street Light

Completion by March 2020

BICKNOR ROAD

KBCG001

NORTH DOWNS

Replacement of Street Light

Completion by March 2020

BICKNOR ROAD

KBCG010

NORTH DOWNS

Replacement of Street Light

Completion by March 2020

BICKNOR ROAD

KBCG011

NORTH DOWNS

Replacement of Street Light

Completion by March 2020

BICKNOR ROAD

KBCG012

NORTH DOWNS

Replacement of Street Light

Completion by March 2020

BICKNOR ROAD

KBCG037

NORTH DOWNS

Replacement of Street Light

Completion by March 2020

BICKNOR ROAD

KBCG041

NORTH DOWNS

Replacement of Street Light

Completion by March 2020

BICKNOR ROAD

KBCG042

NORTH DOWNS

Replacement of Street Light

Completion by March 2020

ASHFORD ROAD

KABO063

NORTH DOWNS

Replacement of Street Light

Completion by March 2020

ASHFORD ROAD

KABO064

NORTH DOWNS

Replacement of Street Light

Completion by March 2020

WALLIS AVENUE

KWAD016

PARK WOOD

Replacement of Street Light

Completion by March 2020

BELL ROAD

KBBS005

PARK WOOD

Replacement of Street Light

Completion by March 2020

GREENFIELDS

KGCA002

SHEPWAY NORTH

Replacement of Street Light

Completion by March 2020

MARION CRESCENT

KMBK002

SHEPWAY NORTH

Replacement of Street Light

Completion by March 2020

MARION CRESCENT

KMBK004

SHEPWAY NORTH

Replacement of Street Light

Completion by March 2020

MARION CRESCENT

KMBK009

SHEPWAY NORTH

Replacement of Street Light

Completion by March 2020

CRANBORNE AVENUE

KCGL014

SHEPWAY NORTH

Replacement of Street Light

Completion by March 2020

LONGFIELD PLACE

KLCN001

SHEPWAY NORTH

Replacement of Street Light

Completion by March 2020

HOLTYE CRESCENT

KHER002

SHEPWAY NORTH

Replacement of Street Light

Completion by March 2020

HOLTYE CRESCENT

KHER006

SHEPWAY NORTH

Replacement of Street Light

Completion by March 2020

HOLTYE CRESCENT

KHER007

SHEPWAY NORTH

Replacement of Street Light

Completion by March 2020

RUTLAND WAY

KRCC002

SHEPWAY NORTH

Replacement of Street Light

Completion by March 2020

DENTON CLOSE

KDAJ003

SHEPWAY NORTH

Replacement of Street Light

Completion by March 2020

THE SPINNEY

KTDS001

SHEPWAY NORTH

Replacement of Street Light

Completion by March 2020

SUTTON ROAD

KSGF006

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

SUTTON ROAD

KSGF007

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

SUTTON ROAD

KSGF039

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

KENNINGTON CLOSE

KKAD005

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

CAMBRIDGE CRESCENT

KCAC016

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

GRAVENEY ROAD

KGBL003

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

GRAVENEY ROAD

KGBL009

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

CRANBROOK CLOSE

KCGM001

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

ESSEX ROAD

KEBB006

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

WESTMARSH CLOSE

KWBT003

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

IFIELD CLOSE

KIAB004

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

WINGHAM CLOSE

KWDI005

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

FREEMAN WAY

KFCN002

SHEPWAY SOUTH

Replacement of Street Light

Completion by March 2020

NORRINGTON ROAD

KNAR007

SOUTH

Replacement of Street Light

Completion by March 2020

CRANBROOK ROAD

KCGN068

STAPLEHURST

Replacement of Street Light

Completion by March 2020

CRANBROOK ROAD

KCGN073

STAPLEHURST

Replacement of Street Light

Completion by March 2020

STATION ROAD

KSFA018

STAPLEHURST

Replacement of Street Light

Completion by March 2020

STATION ROAD

KSFA021

STAPLEHURST

Replacement of Street Light

Completion by March 2020

STATION ROAD

KSFA024

STAPLEHURST

Replacement of Street Light

Completion by March 2020

HIGH STREET

KHDO057

STAPLEHURST

Replacement of Street Light

Completion by March 2020


Appendix D – Transportation and Safety Schemes

 

The Schemes Planning & Delivery team is implementing schemes within the Maidstone district, in order to meet Kent County Council’s (KCC) strategic targets (for example, addressing traffic congestion or improving road safety).  Casualty reduction measures have been identified to address a known history of personal injury crashes. Current status correct as of 23/9/19.

 

Casualty Reduction Measures

 

Location

Parish

Description of Works

Lead officer

Current Status

Great Danes Roundabout

Hollingbourne

Signing and road marking improvements

Jennie Watson

Works complete

Mill Street/Palace Avenue

Maidstone

Lining refreshing

Jennie Watson

Works partially completed in October 2018 – Yellow box markings completed – Contractor to return to refresh white lining

 

 

A20 Ashford Road, Lenham

Lenham

Scheme to make changes to junction

Jennie Watson

Works are substantially complete – Minor snagging items to be completed

Springfield Roundabout - A229 Royal Engineers Road

Maidstone

Signing and road marking improvements

Paul Leary

 

Following detailed analysis, tree clearance only to be carried out

St Faiths Street/ Fairmeadow

Maidstone

Signing and road marking improvements

Jennie Watson

Works passed to contractor – Programmed for 8 October (weather dependent)

A229 Lower Stone Street/ Knightrider Street

Maidstone

Introduction of red-light camera monitoring survey

Jennie Watson

ITS Team arranging red light camera monitoring survey over 7 days – Date to be confirmed

Boxley Road/Sandling Lane, roundabout

Maidstone

Signing and road marking improvements

Jennie Watson

Works complete 6 September 2019

A20 Ashford Road/M20 Slip

Hollingbourne

Signing and road marking improvements

Jennie Watson

At design stage – Scheme to be progressed this financial year

Integrated Transport Schemes – all other LTP funded non-casualty reduction schemes

Location

Parish

Description of Works

Lead officer

Current Status

East Farleigh Bridge

East Farleigh

Upgrade of signing and lining for bridge width restriction

Paul Leary

Works completed May 2019.  Minor snagging items to be carried out

Mote Park Cycleway (Phase 1)

Maidstone

Upgrade of cycle route

Paul Leary

Works completed May 2019.  Minor snagging items to be carried out.  

Mote Park Cycleway

(Phase 2)

Maidstone

Signing and road marking improvements between Chancery Lane and Maidstone House

Paul Leary

Works handed over to contractor – Anticipated completion late December 2019

 

Local Growth Fund

 

Local Growth Fund programme update for the Maidstone Borough.

 

The Department for Transport (DfT) added Ł100m to the Local Growth Fund (LGF) pot in order to fund Local Sustainable Transport Fund Style schemes.  KCC were successful in securing LGF for the following sustainable transport style bids1) Kent Thameside – Integrated door-to-door journeys and 2) West Kent – Tackling Congestion.  The objective of the capital bids is to boost economic growth by decreasing carbon emissions and reducing congestion.

 

The schemes aim to:

 

·         improve access to employment and services

·         reduce the need to travel by the private car

·         enhance pedestrian, cycle and public transport facilities

·         improve sustainable transport connections 

 

The following schemes have been submitted as part of the successful Kent Thameside LSTF this financial year.

 

Scheme

Status

MAIDSTONE EAST STATION IMPROVEMENTS

The newly appointed Asbestos and demolition specialist Rhodar are now on site and have begun demolition of the public house. This is currently running to programme, under asbestos controlled conditions, with most of the roof now removed. The whole ground floor has been cleared of all soft items, such as the bar, doors, partitions, etc, and the basement has been cleared in preparation for backfilling the area to provide protection to the tunnel during the demolition works. The expected completion of the overall programme will be clearer once the demolition of the pub is further completed but is currently expected to be in May/June 2020.

Any public enquiries are being dealt with by Network Rail. Additional KSIP funding has now been confirmed to progress further highway improvements and walking and cycling connections to the station.

Appendix E – Developer Funded Works

 

Developer Funded Works (Section 278 Agreement Works) Maidstone Borough - Contact Officer Claremarie Vine, other officers for sites Jamie Hare, Aaron Divall, Steven Noad, Sarah Parris, Andy Padgham, Steve A Stickels

 

Scheme Name

File Ref.

Officer

Parish

Description of Works

Current Status

BP Tudor Service Station, London Road

MA003072

CV

Allington

Alterations to existing access

Pedestrian crossing point and additional signage still to do.

Bell Farm, North Street

MA003098

SN

Barming

New accesses to split sites, shared surface and new crossing point

Agreement signed; highway works largely completed.

Cross Keys

MA003100

 

JH

Bearsted

New access, crossing point and parking area

Agreement signed

Barty Farm, Roundwell

MA003278

AD

Bearsted

New Bellmouth and Lining works

Agreement Signed

Bicknor Road

MA003256

AP

Bicknor

Formation of hard surfaced passing places

Awaiting technical approval

Heath Road/Church Street

MA003111

SP

Boughton Monchelsea

New access, footway works, yellow lines and crossing upgrade

High Friction surfacing re-laid. Inspection due for start of maintenance.

Hubbards Lane

MA003084

CV

Boughton Monchelsea

Two accesses to minor developments

Works completed on both accesses, pedestrian crossing point to add


Lyewood Farm, Green Lane

MA3247

MA3248

AP

Boughton Monchelsea

New housing development and access

Awaiting technical approval

Goya Development, St Michaels Close, Aylesford

MA003123

 

SP

Boxley

New access and footway work to new commercial properties

Works complete except for new gulley.

Maidstone Studios, New Cut Road

MA003110

 

SP

Boxley

Zebra crossing and pedestrian crossing points

Defective High Friction surfacing requires further attention

St Michaels Close, Aylesford

MA003103

CV

Boxley

Waitrose car park, new access

Final remedials due

Forstal Lane

MA003141

 

SP

Coxheath

Widening of road and new footpath with access to new development

Agreement Signed

Awaiting works start date

Heath Road

(North side)

MA003063

CV

Coxheath

New access and Footway work

Works completed and in maintenance

Land north of Heath Road Phase 2

MA3257

 

SP

Coxheath

Access to new development

Agreement signed

Awaiting works start date

Linden Farm, Stockett Lane

MA003107

 

 

SP

Coxheath

Access to new development and footway link to community hall

Access & footway completed further 2 accesses to restore to footway near completion of development.

Gatland House, Gatland Lane

MA003081

 

 

CV

Fant ward

Parking restrictions, signage, road markings and tactile crossings for new school

Works completed, Remedials to do

Bell Farm, Ashford Road

MA003094

 

 

CV

Harrietsham

Realignment of Church Road to form new access onto A20. New footway along A20

 

 

Works completed and in maintenance.

Mayfield Nursery, Ashford Road

MA003135

 

SP

Harrietsham

New access and alterations to existing Highway to adjoin upcoming Scheme Works

Works ongoing on site currently in conjunction with Harrietsham improvement scheme

Forge Meadows

MA3253

 

AP

Headcorn

Access to 2 new properties and vehicle crossovers to existing properties

Awaiting technical approval

Grigg Lane & Wheeler Street

MA3250

 

SP

Headcorn

Access Gibbs Farm development; zebra crossing on Wheeler St

Technical approval granted, agreement in progress

Grigg Lane, Lenham Road,

 

MA003050

 

CV

Headcorn

Access onto Grigg Lane and Lenham Road. Footway on Grigg Lane

New accesses Grigg Lane and Lenham Road in place, New footway Grigg Lane completed

Kings Road/Millbank

MA3262

 

AP

Headcorn

Signalised crossroads (linked to Ulcombe Road MA3150)

Technical approval granted, Agreement in progress

Lenham Road (North side)

MA003062

 

CV

Headcorn

New Footway to site and extends speed limit boundary

Works completed and in Maintenance

Lenham Road (South side)

MA003057

CV

Headcorn

New footway

Agreement prepared

Oak Lane and Wheeler Street

MA003048

CV

Headcorn

New footway plus junction improvements

Works completed and in maintenance

Ulcombe Road

MA003150

SP

Headcorn

Access to new development

Agreement signed

Wheeler Street, Headcorn

MA003137

 

SP

Headcorn

2 new accesses - off Wheeler Street and Kingsland Grove

Awaiting works start date

Eyhorne Street

MA3198

AP

Hollingbourne

New access to development

Awaiting technical approval

Ledian Farm

MA003086

JH

Leeds

New access to development at Ledian Farm

Now Adopted

8 Faversham Road

MA003032

CV

Lenham

New access

In maintenance; streetlight to replace

Old Ashford Road

MA003018

CV

Lenham

New footway plus access

Approaching end of maintenance, bus stop location to amend.

The Paddocks, Ashford Road (Grove House, Old Ashford Road)

MA3114

CV

Lenham

New access, traffic island, speed reduction to 50mph & f/way link to Faversham Rd

Footway built, remaining works to complete Oct 19

Westwood Park, Ham Lane

MA003305

AP

Lenham

Main and emergency accesses to new housing development

Awaiting technical approval

Royal Engineers Rd/Mill Lane

MA3312

JH

Maidstone

Access to New Development

Under Technical Review

531 Tonbridge Road

MA003045

CV

Maidstone

Service layby for new retail unit

In maintenance

Bicknor Green, Gore Court Road

MA003053

 

AD

Maidstone

Change of road priorities and widening / upgrading

Works mostly complete

Hartnup Street

MA003138

SP

Maidstone

New Access

Works complete now in maintenance.

Heath Road, Coxheath

MA003134

SP

Maidstone

New access and new footway

Agreement signed awaiting start date

Hermitage Lane, (opp. Maidstone Hospital)

MA003060

JH

Maidstone

New Traffic signal junction

Near to adoption


Hermitage Lane/ Howard Drive

MA003070

 

AD

Maidstone

New access for development (opposite the quarry entrance)

Works complete

Howard Drive

MA003303

 

AD

Maidstone

Junction works to facilitate Bus Gateway entrance to Croudace site

Agreement Signed

Maidstone School of Science, New Cut Road

MA003197

 

SP

Maidstone

New access to School and New roundabout and alterations to Highway

Agreement signed

Awaiting road space and start date

McDonalds drive-through, Hart Street

MA003013

CV

Maidstone

New access, improvements to Hart Street.

Approaching the end of maintenance - remedial works due

Oakapple Lane/ Hermitage Lane

MA003046

AD

Maidstone

New bellmouth junction and associated ancillary works for new development including new bus stop

Works Complete – in maintenance

Royal Engineers Road

MA003127

SP

Maidstone

New footpaths to development

Awaiting funds and works start date

The Poplars, Ashford Road

MA3254

AP

Maidstone

Access to new development

Approval granted; Agreement due for signing

Wallis Avenue Phase 3, Parkwood

MA003085

CV

Maidstone

Some stopping up of highway and redevelopment of old carpark and shops area opp. Longshaw Road

Works complete

Week St/Gabriel’s Hill

MA003120

SP

Maidstone

Town Centre Public Realm improvements

Completed and inspected for maintenance

Heath Road

MA3326

JH

Linton

New Access

Under Technical review

Albion Road, Marden

MA003132

SP

Marden

New Access and development

S278 works part completed.

Goudhurst Road, Church Green (Plain Road development)

MA3118

CV

Marden

Install Zebra crossing near rail station.

Completed – in Maintenance

Goudhurst Road/West End (Plain Road Development)

MA3118

CV

Marden

Refurbish Zebra crossing outside school and Bus Borders to add by Library stops.

Work completed and in maintenance

Howland Road

 

MA003088

 

SN

Marden

New development access

Agreement signed; highway works largely complete

MAP Depot, Goudhurst Road

MA003012

CV

Marden

New bellmouth junction and footway

Works in maintenance. Remedial works near completed and interactive speed sign awaiting installation

Napoleon Drive and Plain Road

MA003079

CV

Marden

New access on each road for new housing development

Works Completed

The Parsonage, Goudhurst Road

MA003066

MA003067

CV

Marden

New access and associated upgrade works

Access substantially completed, village gateway to be agreed

Bell Lane

MA003030

CV

Staplehurst

Upgrade of existing access for new development

Due for adoption.

Fishers Farm (East) Headcorn Road (Redrow)

MA3106

SP

Staplehurst

Realignment and new access at Headcorn Road/Pile Lane junction

Realignment complete and Pile Lane open

Fishers Farm (West), Headcorn Road (Bovis)

MA3037

SP

Staplehurst

New access onto Headcorn Road

Works commenced on both S278 and S38

Hen and Duckhurst Farm, Marden Road

MA003109

CV

Staplehurst

New Roundabout for development access

Works on highway almost completed. HFS delayed by utility works.

Oliver Road Staplehurst

MA003019

CV

Staplehurst

Ped crossing to Marden Road, junction markings and bus boarders

Works completed

Woodford Park

MA003099

SP

Staplehurst

New access for 9 dwellings

Works completed and on to maintenance.

Appleacres, Maidstone Road

MA003152

 

SP

Sutton Valence

Access to new development and footway works

Technical Approval given awaiting Legal Agreement

The Oaks, Maidstone Road

MA003078

 

CV

Sutton Valence

Upgrade existing Vehicle crossing access to Bellmouth with tactile crossing.

Works complete

Valdene Industrial Estate

MA003054

 

CV

Sutton Valence

Upgrade of existing bellmouth and extension to f/w

Footway works carried out; access works due

Oct 2019.

Cripple Street Maidstone

MA003093

 

CV

Tovil

New access to development, widening and footway works

Due for adoption – remedials due

Site opposite cottages 129-147 Dean Street/Farleigh Hill

MA003007

 

CV

Tovil

New access speed limit relocation, new footway and bus stop provision

Works completed and in maintenance

Tovil Green Lane

MA003095

CV

Tovil

New Footway and crossing point to side of site

Remedials completed – in maintenance

Hampstead Lane

MA3101

 

SP

Yalding

Relocate access to new development at old depot adj. station. Minor footway works

Into maintenance period

Vicarage Road

MA003121

 

SP

Yalding

New access to development and speed restraints on existing Highway

Technical Approval Granted

Bentletts Yard, Claygate Road, Laddingford

MA003357

SP

Laddingford

New footway and replaced surface to existing access

Awaiting Technical approval although some works already carried out

Old Ashford Road, Adj Groom Way

MA003356

SP

Lenham

New access and footway

Awaiting Technical Approval

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Developer Funded Works (Section 106 Works)

 

File Ref.

Road Name

Parish

Description of Works

Current Status

18/19-S106-MA-486

A20 Ashford Road

Harrietsham

Village improvement works: 2 phase approach.

Phase 1 which consisted of narrowing the carriageway, widening footways to allow shared footway/cycleway, altering the controlled crossing, provision of central islands and changes to the speed limits and associated signing and lining.

Phase 2 will include relocating street lighting columns to better suit the new road layout and to extend the lighting to include all the 30mph limit. Resurfacing of the carriageway to hide the old white lining and then new lining to the recently installed layout.

.

Phase 1 Works completed in June 2019. KCC investigating how phase 2 can be brought forward. Kent County Council are to collect the remaining S106 contribution from Bellway Homes now less the indexation.

 

Please see separate report.

18/19-S106-MA-819

Linton Crossroads

Linton/Loose

Junction/signal upgrade

Finalising designs however the estimated cost of the alterations is significantly above the S106 contributions available. KCC is to investigate how any funding gap can be dealt with. It is hoped that a public consultation can be undertaken around October/November with implementation in 2020 pending all land, environmental and funding issues being resolved.

 

 

Appendix F – Bridge Works

 

Bridge Works – Contact Officer Earl Bourner

Road Name

Parish

Description of Works

Current Status

No planned works

 

Appendix G – Traffic Systems

 

There is a programme of scheduled maintenance to refurbish life expired traffic signal equipment across the county based upon age and fault history. The delivery of these schemes is dependent upon school terms and holiday periods; residents, businesses and schools will be informed verbally and by a letter drop of the exact dates when known.

 

Traffic Systems - Contact Officer: Toby Butler

 

Location

Description of Works

Current Status

A26 Tonbridge Road near Milton Street, Maidstone

Refurbishment of traffic signal-controlled crossing

Programmed August 2019

B2162 Twyford Bridge, Yalding

Refurbishment of traffic signals

To be Programmed

A229 Fairmeadow/ Medway Street

Refurbishment of traffic signal-controlled junction

Programmed September 2019

A20 London Road near Broadway

Replacement of signal controller

Programmed September 2019

A20 Tonbridge Road near Station Approach

Replacement of signal controller

Programmed September 2019

 


Appendix H - Combined Member Grant programme update

 

Member Highway Fund programme update for the Maidstone district

 

The following schemes are those, which have been approved for funding by both the relevant Member and by Simon Jones, Director of Highways, Transportation and Waste. The list only includes schemes, which are

 

·         in design

·         at consultation stage

·         about to be programmed

·         Recently completed on site.

 

The list is up to date as of 23/9/19

      

The details given below are for highway projects only.  This report does not detail

·         Contributions Members have made to other groups such as parish councils

·         highway studies

·         traffic/ non-motorised user surveys funded by Members.  

 

More information on the schemes listed below can be found by contacting the District Manager for the Maidstone district, Susan Laporte.

 

Dan Daley and Rob Bird

 

Details of Scheme

Status

18/19-CMG-MA-722 – Queens Avenue, Maidstone

 

Construction of build out for part one way

 

 

Works Complete

 

 

 

Eric Hotson         

 

Details of Scheme

Status

19/20-CMG-MA-923 – Church Hill, Boughton Monchelsea

 

Traffic Regulation Order application for speed limit reduction

 

 

TRO sealed - Complete

 

Paulina Stockell

 

Details of Scheme

Status

19/20-CMG-MA-947 – Darman Lane, Laddingford, Yalding

 

Traffic Regulation Order application for speed limit reduction

 

TRO sealed - Complete

 


1.1               Legal Implications

1.1.1         Not applicable.

1.2               Financial and Value for Money Considerations

1.2.1         Not applicable.

1.3               Risk Assessment

1.3.1         Not applicable.

Contacts: Kirstie Williams/ Susan Laporte 03000 418181