Contact your Parish Council


Planning Applications for MA100692 town centre redevelopment, high street, maidstone, kent enc. 2

APPLICATION:       MA/10/0692         Date: 23 April 2010        Received: 23 April 2010

 

APPLICANT:

Mr John Foster

 

 

LOCATION:

TOWN CENTRE REDEVELOPMENT, HIGH STREET, MAIDSTONE, KENT                  

 

PARISH:

 

Maidstone

 

 

PROPOSAL:

An application for listed building consent for the relocation of the cannon and its placement on a new plinth together with installation of lighting to illuminate the Queen’s Monument, the relocated cannon and other listed buildings and ancillary works thereto in accordance with High Street Lighting Proposal, Design and Access Statement, Design and Light Level Calculations, and drawing numbers 728-004; and tree measurement list submitted on 23 April 2010.

 

AGENDA DATE:

 

CASE OFFICER:

 

1st July 2010

 

Chris Hawkins

 

The recommendation for this application is being reported to Committee for decision because:

 

●  the Council is the applicant

 

1.0       POLICIES

 

Maidstone Borough-Wide Local Plan 2000:  N/A
South East Plan 2009: BE6
Village Design Statement:  N/A

Government Policy: PPS5

 

2.0       HISTORY

 

MA/10/0254         High Street and King Street, Maidstone. Planning application for the provision of new ramps, steps and landing areas on the south side of Bishops Way to improve pedestrian connection from the High Street to the Bridge and the closure of one existing subway, relocation of the cannon and its placement on a new plinth, removal of 4no. existing Plane Trees and their replacement with 8no. Cherry and 7no. Hornbeam Trees, provision of illumination for the Queen's Monument, the relocated cannon and other listed buildings and ancillary works thereto, together with other works including the realignment and re-paving of carriageways and pedestrian areas and crossing points, the relocation of 'bus stops and shelters, taxi ranks, loading bays and disabled parking bays and the removal/relocation and/or provision of new street furniture including benches, lighting, leaning-posts, telephone boxes, removal of planters and shrubs and the relocation of the existing CCTV pole by the cannon. Withdrawn.

 

MA/10/0255         High Street and King Street, Maidstone. Application for listed building consent for the relocation of the cannon and its placement on a new plinth together with installation of lighting to illuminate the Queen’s Monument, the relocated cannon and other listed buildings and ancillary works thereto. Withdrawn.

 

2.0.1  There have been a significant number of other planning and listed building applications within the town centre, however, none of these are considered to be relevant in the determination of this planning application. 

 

3.0       CONSULTATIONS

 

3.1    English Heritage have been consulted and advise that this application should be determined in accordance with the policies within the Development Plan and following the Council’s ‘in house’ Conservation advice.

 

3.2    Kent County Council Archaeology were consulted and have raised no objections to this proposal subject to the imposition of a suitable condition requiring the provision of an archaeological assessment – a condition has been suggested within this report.

 

3.3    Maidstone Borough Council Conservation Officer was consulted and made the following comments: -

 

3.3.1  ‘This scheme is the result of a winning competition entry and wide negotiation and discussion and should result in a major enhancement of the Conservation Area. The lighting scheme will enable the buildings and spaces to be enjoyed at night in a dramatic way, and although in one or two cases this would result in quite a significant number of light fittings attached to individual buildings, the fittings themselves are small and should not impact unduly on the character of the buildings involved. The re-siting of the cannon and its new plinth will have no detrimental impact on its character and appearance and will enable it to take a more prominent position in the street scene – no objections.’

 

4.0       REPRESENTATIONS
 

4.1     No representations have been made with regards to this listed building consent. Although representations have been made about the overall scheme, these relate to the planning application. These are set out within the report for planning application MA/10/0691 elsewhere in these papers.

 

5.0       CONSIDERATIONS

 

5.1    Site Description

 

5.1.1  The application site covers the full length of the High Street from its junction with Fairmeadow, running up through the High Street to the junction of King Street and Wyke Manor Road. This covers a total of 1.2 hectares. The most westerly part of the application site forms part of the A229, at the junction of Fairmeadow and Bishops Way. This is a particularly well used highway, carrying significant volumes of traffic through the centre of Maidstone, linking the Medway Towns to the north and Hastings to the south. At present a subway runs beneath this road for pedestrian movements, as well as a pelican crossing at road level.

 

5.1.2  Eastwards, into the core town centre, the pavements follow the line of the existing buildings which splay out on the southern side, producing a wider central area, which currently houses a cannon. There are bus stops located on the southern side of the street, and a bus lane on the opposite side of the street running eastwards. The High Street at this point is lined by a mixture of buildings, some of significant age, whilst others are of a more recent construction.

 

5.1.3  A junction with Mill Street results in all through traffic being directed away from the main shopping centre. This is a traffic light controlled junction, with a pedestrian crossing linking into Bank Street. It is at this point that the shopping area effectively ‘splits’ into two distinct streets – Bank Street running to the south, and the High Street continuing on the northern side. There are small flower beds on the northern side of the High Street at the junction with Mill Street.     

 

5.1.4  This area lies within the core of the Maidstone Conservation Area (this ends at the junction of the High Street and King Street, and at the western end of the High Street), and is fronted by a number of historically significant buildings, many of which contain historic shop-fronts or facades. The greatest concentration of listed buildings are clustered around the Upper High Street area and within Bank Street. This area also contains the Town Hall, a Grade II* listed building, which dates back to 1764. Bank Street contains many buildings dating from between 1500 and 1700, and is of significant historical importance. At present, this road is part pedestrianised, with limited vehicular movements allowed (subject to time of day, deliveries etc.).

 

5.1.5  There are vehicular movements within the Town Centre at present – buses and taxis predominantly, as well as providing an element of disabled parking on street. There is a relatively wide pavement on the north side of the High Street at this point, which is relatively free of clutter.

 

5.1.6  To the north-east of the Town Hall is an open area, which contains the Queen Victoria statue, located centrally within the highway. This area has a cluster of bus stops on either side of the street and a central area set aside for waiting taxis. Pedestrian movements at this point of the street are limited to two narrow pavements on either side of the road (whilst not physically narrow, the siting of the bus stops makes them appear as such).

 

5.1.7  Further eastwards, and the character of the street changes significantly. There is a pedestrian crossing that links The Mall shopping centre and Week Street (this is constructed of pavers, denoting the change in its use), and beyond this, traffic controls which prevent private cars from entering the area from the east. This area is flanked predominantly by rather unremarkable buildings to the north, and the shopping centre to the south. Much of this area falls outside of the Conservation Area.

 

5.1.8  Overall, it can be seen that the site contains areas which vary significantly in their character, despite all being within the core town centre area.  

 

5.2    Proposal

 

5.2.1  This application is for listed building consent for the lighting proposed on a number of listed buildings throughout the High Street (the precise details of which are set out later within this report). This lighting would be energy efficient and would be permanently attached to the buildings. These lamps would produce a white light, with the fixings being of the same colour of as each of the buildings, to reduce their visual impact. Metal Halide lights have been proposed as these are considered to produce the most suitable form of light for these listed buildings. The lighting strategy submitted sets out to provide three distinct zones – the east destination zone, west destination zone, and a main pedestrian route linking the two (a vehicular link is also proposed). It is proposed to encourage most of the pedestrian footfall to move along Bank Street between the two main ‘zones’ which would consist of mostly architectural façade lighting – much of which forms part of this application. The lighting strategy would see the highest levels of luminance at the lower end of the High Street. The proposed light levels plan show that much of this light would be approximately 50 lux, whereas the majority of Bank Street would be illuminated to around 6.25-12.50 lux.             

 

5.2.2  The lighting would vary in size, ranging from 441mm in depth to 170mm in depth, depending on the lighting requirements, and the sensitively of the building. The lights would range from 1Watt (uplighters located within the ground) to 70Watts (luminaire for lighting selected features and up-lighting facades). The lighting would be attached to the following Grade II listed buildings: -

 

·         100 High Street – lighting attached at eaves level;

·         97 High Street – lighting attached above second floor;

·         95-94 High Street – lighting above fascias and one down-lighter between second and third floor;

·         91 High Street – up-lighters within ground to front of building and above ground floor;

·         89-90 High Street - lighting between first and second floor;

·         88 High Street – lighting on side elevation above fascia;

·         86 High Street – up-lighters above fascia;

·         85 High Street – up-lighters above first floor bay window;

·         83-84 High Street – up-lighters above fascia;

·         82 High Street – up-lighting above fascia;

·         80-81 High Street – up-lighting above fascia;

·         79 High Street – up-lighting above fascia;

·         77 High Street – lighting above fascia;

·         76 High Street – lighting above fascia and removal of existing lighting;

·         74 High Street – lighting above fascia and removal of existing lighting;

·         73 High Street – lighting above fascia;

·         70 High Street – lighting above fascia;

·         69 High Street – lighting above fascia;

·         64 High Street – lighting above fascia and between first and second floor;

·         Alleyway between 5-6 Middle Row – lighting within alleyway;

·         Alleyway between 10-11 Middle Row – lighting within alleyway;

·         1 Middle Row – lighting above fascia;

·         18 High Street – lighting above fascia;

·         1 & 38 Royal Star Arcade – lighting above fascia and to illuminate sign;

·         3 High Street – lighting above ground floor level;

·         1 High Street/1 Week Street – lighting above fascia;

·         8 King Street – lighting at 2nd floor level;

·         1 Gabriel’s Hill – lighting at 2nd floor. 

 

5.2.3  The lighting proposed to be located on Grade II* listed buildings is as follows: -

 

·         Town Hall – up-lighters within ground to all elevations and between ground and first floor. Up-lighting on roof to illuminate dome;

·         78 High Street – lighting proposed under overhang, beneath second floor;

·         8-9 High Street – lighting above fascia, and beneath public footpath to Market Colonnade.

 

5.2.4  Lighting proposed on Queen Victoria statue: -

 

·         Four up-lighters inside the monument

·         Four up-lighters within the ground on two sides of the statue. 

 

5.2.5  In addition, a new granite surround is proposed to be positioned around the statue, which is to be designed in collaboration with an artist. 

 

5.2.6  This application also considers the implications of moving the cannon, with the erection of a new plinth. The cannon would be relocated from its existing position, within a lower High Street, closer to 64-65 High Street, Maidstone. The cannon plinth would be some 7.5metres away from these properties. It is proposed that utilities cabinets are also sited within this location, although these would turn their back on the cannon itself. The new plinth is to be constructed on a granite surface, with granite cladding on any vertical elevation. The plinth would step down to the west – towards the river. It would have an overall length of 19metres, with a maximum width of 5.7metres.

 

5.3    Impact upon Listed Buildings

 

5.3.1  As Members can see from the Agenda, a planning application has also been submitted for this site. The planning application addresses some of the physical changes to the High Street. In determining this listed building application the assessment shall consider the impact that the proposed lighting would have upon the listed buildings, and the proposed alterations to the cannon and statue. 

 

5.3.2  Additional lighting around the Queen Victoria statue would provide additional interest in the structure, and also highlight it during the evening hours. No objections have been raised with regards to this proposal, and I consider this to be acceptable as it would not detract from the existing form of the statue, and would give greater emphasis to this important structure during the evening hours. Likewise, I consider that the new granite base around the statue would help ensure that it is suitably integrated into the remainder of the High Street improvements, whilst also being of a sufficient quality of material to reflect its importance. I therefore conclude that the proposed works to this structure will enhance its setting, and therefore comply with the objectives of Policy BE6 of the South East Plan (2009) and PPS5.  

 

5.3.3  The lighting proposed on all of the listed buildings has been carefully designed by the applicant, and attempt to bring many of these high quality buildings into greater prominence within the street scene. As can be seen from the above, the Council’s Conservation Officer has raised no objection to this proposal, as he considers that the proposal would enhance the setting of the numerous listed buildings within the locality.

 

5.3.4  As stated above, I consider that the lighting upon the buildings has been carefully considered by the applicant. The submission shows that the lighting would be positioned in such a way as to minimise the impact upon the form of the listed buildings – i.e. often located directly above the fascia, or between floors – thereby not breaking up the natural rhythm of the properties, and would be directed so as to highlight the features of particular interest. For example within Bank Street, many of the buildings are particularly ornate, and the up-lighting would further highlight these details. Likewise, buildings with a strong vertical emphasis, would have lighting that reflects this characteristic – with light directed upwards, and often between the vertical elements.

 

5.3.5  The repositioning of the cannon would certainly improve its setting from its current situation. At present it is within a particularly isolated location, surrounded by vehicle movements, and is relatively inaccessible for pedestrians. As such, it becomes somewhat ‘lost’ within the townscape. This proposal would see it become a more prominent feature, that would encourage visitors to view it, and understand its historical context/importance. The plinth would be constructed of suitably high quality materials, and, as with the statue, reflect the character of the remainder of the High Street improvements.

 

5.3.6  Overall, I consider that the proposals put forward would enhance the character and appearance of the listed buildings within the High Street/King Street, with the holistic approach undertaken ensuring that the proposal would be delivered to a high standard. I therefore consider that the proposal is in accordance with PPS5 and Policy BE6 of the South East Plan (2009). 

 

5.8    Other Matters

 

5.8.1  As this is a listed building consent, it is not appropriate to consider any planning matters as part of this application. I do not consider that there are any other issues that would affect the fabric, or setting of the listed buildings that require further discussion.

 

6.0       CONCLUSION

 

6.1     I therefore consider that this proposal would preserve, and in some instances enhance the setting and appearance of the listed buildings within the High Street, and as such the proposal complies with the policies within the Development Plan and PPS5. I therefore recommend that Members give this application favourable consideration propose that GOSE grant listed building consent subject to the conditions as set out below.    

 

 

7.0       RECOMMENDATION

 

GRANT LISTED BUILDING CONSENT subject to the following conditions:

 

1.   The works to which this consent relates must be begun before the expiration of three years from the date of this consent;

 Reason: In accordance with the provisions of Section 18 of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.

2.   The development shall not commence until, written details and samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority and the development shall be constructed using the approved materials;

Reason: To ensure a satisfactory appearance to the development and to preserve the setting of the adjacent listed buildings in accordance with PPS5.

Informatives set out below

You are advised to ensure that the appointed contractor(s) is/are registered with the 'Considerate Constructors Scheme' and that the site is thereafter managed in accordance with the Scheme. Further information can be found at  www.considerateconstructorsscheme.org.uk

Reason for Approval

The reason for granting this consent are that proposed works are considered to preserve the building/setting of the building and its special architectural and historic features.