Member Highway Fund programme update for the Maidstone District.
The following schemes are those which have been approved for funding by both the relevant Member and by John Burr, Director of Highways and is up to date as of 13th January 2014.
The details below are for Highway Schemes only and do not detail contributions Members have made to other groups such as Parish or District Councils.
More detail on their schemes can accessed by each Member via the online database or by contacting their Member Highway Fund Engineer.
Overview of 2012/13 Schemes
Gary Cooke – Maidstone South East
Scheme |
Status |
B2163 Leeds – Gateway Improvements |
Awaiting implementation |
Dan Daley – Maidstone Central
Scheme |
Status |
Newbury Ave & Allington Way – Installation of warning signage and associated carriageway markings |
Programmed Feb 2014 |
Eric Hotson – Maidstone Rural South
Scheme |
Status |
Marden Road, Staplehurst – Extension of 30Mph Speed Limit |
Awaiting TRO & implementation |
Rob Bird – Maidstone Central
Scheme |
Status |
Newbury Ave & Allington Way – Installation of warning signage and associated carriageway markings |
Programmed Feb 2014 |
Paulina Stockell – Maidstone Rural West
Scheme |
Status |
St Margaret’s School, Collier Street – Installation of Interactive Sign and parking restrictions in the vicinity of St Margaret’s School |
Awaiting implementation |
Overview of 2013/14 Schemes
Brian Clark
Scheme |
Status |
Contribution to the KM Safety Campaign |
MHF3 Handed over for Delivery
|
To plant 1 mature tree to replace one which was felled - Parkway
|
MHF3 Handed over for Delivery
|
KB49 Pathway resurface Old Drive to Anglesea Avenue |
Works Completed
|
Installation of 2 no. timber bollards – Cripple Street |
Works Completed
|
To reconstruct ramps either side of table top plus a 3m length of carriageway in the landing area either side of ramp feature. |
MHF3 Handed over for Delivery |
Dan Daley
Scheme |
Status |
To install pedestrians in road ahead lit warning signs on lamp columns either side of existing informal crossing point -Buckland Hill |
MHF3 Handed over for Delivery |
Carry out improvements to signing – Marigold Way |
MHF3 Handed over for Delivery |
Provide down-lighting at crossing point and warning sign for traffic coming round bend from Tonbridge Rd |
MHF3 Handed over for Delivery
|
Provide Warning Sign on Upper Fant Rd for traffic travelling westwards into Hackney Rd together with SLOW marking on roadway |
Works Completed
|
Eric Hotson
Scheme |
Status |
New 30mph interactive speed sign – A229 by Church Green |
MHF3 Handed over for Delivery |
To install timber bollards to prevent parking on the footway – Gybbon Rise |
MHF3 Handed over for Delivery |
Gary Cooke
Scheme |
Status |
Installation of timber bollards to prevent inconsiderate parking at school pick up and drop off times – Wexford Place |
Works completed |
An additional parking bay in Buckingham Row |
Works completed |
To install Unsuitable for HGVs signage in Downswood |
MHF3 Handed over for Delivery |
Ian Chittenden
Scheme |
Status |
Contribution for the replacement of 2 flower beds, including new trees and shrubs – Heathorn Street |
Works completed |
To install a directional sign for Maidstone Football Club |
Works completed |
To replace or remove trees within this division |
MHF3 Handed over for Delivery |
Jenny Whittle
Scheme |
Status |
To install Unsuitable for HGVs signage – Rayners Hill |
MHF3 Handed over for Delivery |
To install Unsuitable for HGVs signage – A20 before the Broomhill Road junction |
MHF3 Handed over for Delivery |
Paul Carter
Scheme |
Status |
Installation of ‘Cyclists Dismount’ signs – Ragstone Road |
Works completed |
To make a contribution to PROW for resurfacing the top 20 metres of path - Pathway KM79 in Bearsted by the BP Garage.
|
Works completed |
Paulina Stockell
Scheme |
Status |
To install village gateway with welcome to Hunton sign, remove redundant posts, relocate exisiting footpath sign and install marker posts |
MHF3 Handed over for Delivery |
Installation of School Warning signs – Lower Road, near St Helens school |
Works completed |
Road marking improvements – various locations in East Farleigh |
MHF3 Handed over for Delivery |
Rob Bird
Scheme |
Status |
Install pedestrians in road ahead lit warning signs on lamp columns either side of existing informal crossing point. Existing lamp columns are unable to house the new lit signs installations so will be replaced as part of the works -Buckland Hill |
MHF3 Handed over for Delivery |
Carry out improvements to signing – Marigold Way |
MHF3 Handed over for Delivery |
Provide down-lighting at crossing point and warning sign for traffic coming round bend from Tonbridge Rd |
MHF3 Handed over for Delivery
|
Provide Warning Sign on Upper Fant Rd for traffic travelling westwards into Hackney Rd together with SLOW marking on roadway |
MHF3 Handed over for Delivery |