Committee considered the report of the Head of Planning and
Development.
In
introducing the application, the Major Projects Manager advised the
Committee that he wished to amend the second sentence of
recommended condition 4 (Enhancement of Biodiversity) to
read:
The
scheme shall consist of the enhancement of biodiversity through
at least one integrated methods into the design and
appearance of the extension/outbuilding by means such as swift
bricks, bat tubes or bee bricks, and through the provision within
the site curtilage such as bird boxes, bat boxes, bug hotels, log
piles, wildflower planting and hedgehog corridors.
RESOLVED:
1. That permission
be granted subject to the conditions set out in the report, as
amended by the Major Projects Manager when introducing the
application, with the amendment of condition 5 (Optimum Energy and
Water Efficiency) to require the incorporation of renewable energy
generation measures and investigation of the potential for an
electric vehicle charging point.
2. That the Head
of Planning and Development be given delegated powers to finalise
the wording of the amended conditions.
Voting: 11
– For 0 –
Against 2
– Abstentions