To: Maidstone Joint Transportation Board
By: KCC Highways and Transportation
Date: 2nd August 2023
Subject: Highways Forward Works Programme: 2022/23 and 2023/24
Classification: Information Only
Summary: This report updates Members on the identified schemes approved for construction
1. Introduction
This report provides an update and summarises schemes that have been programmed for delivery in 2022/23 and 2023/24.
In summer 2021 Kent County Council published a Highways Asset Management Plan (HAMP), which included, as Appendix C, a five-year Forward Works Programme for the years 2021/22 to 2025/26. this reflected the need to move away from annual programmes and to consider asset management activity a multi-year one.
The first part of the programme concerned the two years 2021/22 - 2022/23. Around half of the schemes included in that programme have now been delivered, and as a result we have now produced a new programme covering the years 2022/23 - 2023/24. As before, most of the sites included in this programme have already been verified by our engineers.
The second part of our programme related to years three to five of our five-year programme (2023/24 - 2025/26). This too needs revision to cover the years 2024/25 – 2026/27, and the work required to do this is currently in progress. As before, our new years three to five programme will be largely based on data from our asset management systems, so may be subject to more changes as the schemes are verified.
This programme is subject to regular review and may change for several reasons including budget allocation, contract rate changes, inflationary pressures such as material price increases, conflicting works, and to reflect our changing priorities. The programme and extent of individual sites within the programme may also be revised following engineering assessment during the design phase, and additional sites may be added or others advanced if their condition deteriorates rapidly so that we need to react to keep the highway in a safe and serviceable condition.
Further information about how we manage our highway infrastructure, including our county-wide five-year forward works programme, may be found on our website:
In addition to planned maintenance of our highway assets, this report includes transportation and safety schemes, developer funded works, Combined Members Grant schemes, and planned maintenance of public rights of way.
Road, Footway & Cycleway Renewal and Preservation Schemes – see Appendix A
Drainage Repairs & Improvements – see Appendix B
Street Lighting – see Appendix C
Transportation and Safety Schemes – see Appendix D
- Casualty Reduction Measures
- Externally Funded Schemes
Developer Funded Works – see Appendix E
Bridge Works – see Appendix F
Traffic Systems – see Appendix G
Combined Members Grant – Member Highway Fund – see Appendix H
Conclusion
1. This report is for Members’ information.
Contact Officers:
The following contact officers can be contacted on 03000 418181.
Richard Emmett Senior Highway Manager East Kent
Susan Laporte Maidstone Highway Manager
Alan Casson Strategic Asset Manager
Earl Bourner Drainage Asset Manager
Helen Rowe Structures Asset Manager
Sue Kinsella Street Light Asset Manager
Toby Butler Traffic Operations and Technology Manager
Jamie Hare Development Agreements Manager
Nikola Floodgate Road Safety and Active Travel Group Manager
Appendix A – Road, Footway and Cycleway Renewal and Preservation Scheme
The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged, and the residents will be informed by a letter drop to their homes.
Machine Resurfacing – Contact Officer Mr Byron Lovell |
|||
Road Name |
Parish |
Extent of Works |
Current Status |
A249 Sittingbourne Road |
Stockbury |
Oad Street to opposite Detling Showground (Maidstone bound only) |
To be programmed early 2024 |
Copsewood Way |
Bearsted |
Concrete Rehabilitation Entire length |
Completed |
A229 Cranbrook Road |
Staplehurst |
Retexturing Approximately 50m between Knoxbridge Café and Cork Lane |
Completed |
A274 Headcorn Road |
Sutton Valence |
Retexturing North of New Barn Road junction (Maidstone bound) |
Completed |
B2012 Holland Road |
Maidstone |
Retexturing HFS approach to A249 Sittingbourne Road |
Completed |
Bircholt Road |
Maidstone |
Entire length |
To be programmed Summer 2023 |
Upper Fant Road |
Maidstone |
Bower Lane to Hackney Road |
Programmed 19th October 2023 |
Milton Street |
Maidstone |
A26 Tonbridge Road to Hackney Road |
Programmed 3rd November 2023 |
Footway Improvement - Contact Officer Mr Neil Tree |
|||
Road Name |
Parish |
Extent and Description of Works |
Current Status |
Tintern Road |
Allington |
Footway Protection Entire Extents |
Designed and programmed for August 2023 |
Flaxman Drive |
Allington |
Footway Protection Entire Extents |
Designed and programmed for August 2023 |
Anerley Close |
Allington |
Footway Protection Entire Extents |
Designed and programmed for August 2023 |
Beckham Drive |
Allington |
Footway Protection Entire Extents |
Designed and programmed for August 2023 |
Eynsford Road |
Allington |
Footway Protection Entire Extents |
Designed and programmed for August 2023 |
Stanstead Close |
Allington |
Footway Protection Entire Extents |
Designed and programmed for August 2023 |
Stockbury Drive |
Allington |
Footway Protection Entire Extents |
Designed and programmed for August 2023 |
Fountain Lane |
Barming |
Footway Protection Sections between Tonbridge Road and Heath Road |
Designed and programmed for August 2023 |
Surface Treatments – Contact Officer Mr Jonathan Dean |
|||
Road Name |
Parish |
Extent and Description of Works |
Current Status |
MARLEY ROAD (DICKLEY LANE) |
Lenham (Harrietsham) |
Marley Works to Steeds Hill (Micro Surfacing) |
Completed |
GRIGG LANE (PHASE 3) Section not done due to covid vaccination centre access |
Headcorn |
Headcorn Surgery (The Hardwicks) to Oak Lane (Micro Surfacing) |
Completed |
CHURCH LANE |
Harrietsham |
A20 Ashford Road to Marley Lane (Micro Surfacing) |
Completed |
SHENLEY ROAD |
Headcorn |
A274 Biddenden Road to Whitehouse Lane (Micro Surfacing) |
Completed |
HUNTON HILL |
Hunton |
East Street to Entrance to South Lodge (Micro Surfacing) |
Completed |
SUTTON ROAD |
Maidstone |
From Northumberland Avenue to Morrisons (Micro Surfacing) |
Completed |
CLAYGATE ROAD |
Yalding |
Darmen Lane to Emmett Hill Road (Micro Surfacing) |
Completed |
HOGBARN LANE |
Harrietsham |
Ringlestone Road to Stede Hill (Micro Surfacing) |
Completed |
PENENDEN HEATH ROAD |
Maidstone |
From A249 to Boxley Road (Micro Surfacing) |
Completed |
FARLEIGH LANE |
East Farleigh |
Glebe Road to Rectory Lane (Little Fant Farm) (Micro Surfacing) |
Completed |
PATTENDEN LANE |
Marden |
Underlyn Lane to West End (Micro Surfacing) |
Completed |
ROUNDWELL (& THE STREET) |
Bearsted |
From A20 Ashford Road to 4 South View (inc. The Street) (Micro Surfacing) |
Completed |
GRAVE LANE |
Staplehurst |
Clapper Lane to Summerhill Road (In situ Road Recycling / Retread) |
Completed |
SOUTHERNDEN ROAD |
Headcorn |
(West to East) Lenham Road to Grigg Lane (In situ Road Recycling / Retread) |
Completed |
ULCOMBE ROAD (TILDEN ROAD) |
Headcorn |
Tattlebury Lane to Crumps Lane (In situ Road Recycling / Retread) |
Completed |
COUCHMAN GREEN LANE (SWEETLANDS LANE) |
Staplehurst |
Pile Lane to Headcorn Road (In situ Road Recycling / Retread) |
Completed |
BRICK KILN LANE |
East Sutton |
Whole Road (In situ Road Recycling / Retread) |
Completed |
PAGEHURST ROAD |
Staplehurst |
Between Five Ash Lane and Thorn Road (Surface Dressing) |
Postponed until 2024 |
SHERENDEN LANE |
Marden |
Entire length (Wilden Park Road to Goudhurst Road) (Surface Dressing) |
Programmed for July 2023 |
CLAYGATE ROAD (PART) |
Marden |
Jarmons Lane to Claygate Road (Surface Dressing) |
Programmed for July 2023 |
JARMONS LANE (PART) |
Collier Street |
Collier Street to Claygate Road (Surface Dressing) |
Programmed for July 2023 |
SPENNY LANE |
Collier Street |
Claygate Road to Martins Fruit Farm (Surface Dressing) |
Programmed for July 2023 |
STAPLEHURST ROAD (FRITTENDEN ROAD) |
Staplehurst |
A229 to Park Wood Road (Surface Dressing) |
Programmed for July 2023 |
CHART ROAD |
Sutton Valence |
Church Road to Chart Hill Road (Surface Dressing) |
Programmed for July 2023 |
CRUMPS LANE |
Ulcombe |
Headcorn Road to Lenham Road (Surface Dressing) |
Programmed for July 2023 |
Drainage Repairs & Improvements - Contact Officer Earl Bourner |
|||
Parish |
Description of Works |
Current Status |
|
Holmoaks |
Maidstone |
Maintenance to existing system to stop damage to footway in park. Proposed installation of new pipe under footpath to help to prevent washout in very heavy rainfall events. |
Site meeting on 13/02/23, JD has advised Warden by email 15/02/23 detailing further works proposals. |
Eccleston Road |
Maidstone |
Pipe collapse adjacent to property No.46. Crew required to dig down and replace. |
Investigation works undertaken. BT to attend after identifying their assets damaged the drainage system. Awaiting further response from BT Openreach |
Church Road |
Boughton Malherbe |
Consistent Leak from carriageway, water test has shown chlorine. |
No further update from SE Water as works are still yet to be conducted. Gullies are all blocked on Church Lane Road and requires reactive cleansing works. |
Woodcock Lane |
Boughton Malherbe |
Regular flooding, water bypassing ditches. |
Drainage Engineer to meet customer on site on 4/4/23 to discuss issues with a view to raise civils works. |
Smith’s Hill |
West Farleigh |
Siding out, dig out of gullies and cleansing and jetting of the rest of the system |
Twenty gullies cleansed and free flowing. Further works required to dig out seven ‘buried’ assets and cctv one collapsed gully pipe. Engineer raising job. |
Warmlake Road |
Sutton Valance |
Install a new catchpit and kerb verge to reduce silt from getting into soakaways, cleanse deep bores once work has been completed. |
Works Completed |
Gatland Lane |
Maidstone |
Drainage Improvement Scheme between Chamberlain Avenue and Fant Lane to remedy flooding issues in this area |
Works to commence 24th July 2023 |
Hampstead Lane |
Nettlestead |
Ditching works. |
Works Completed 08/06/2023. |
Appendix C – Street Lighting
Column replacement testing of KCC owned streetlights has identified the following as requiring. A status of complete identifies that the column replacement has been carried out. Programme dates are identified for those still requiring replacement.
Road Name |
Location |
Description of Works |
Status |
Tonbridge Road KTBU022 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Tonbridge Road KTBU051 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Sutton Road KSGF007 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Farleigh Hill KFAH002 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
King Street KKAM013 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Loose Road KLCQ055 |
Maidstone |
Replacement Street Light |
Completed |
Ashford Road KABQ017 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Ashford Road KABQ019 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Fairmeadow KFAE509 |
Maidstone |
Replacement Lit sign |
Completion end October 23 |
Fairmeadow KFAE512 |
Maidstone |
Replacement Lit sign |
Completion end October 23 |
Fairmeadow KFAE508 |
Maidstone |
Replacement Lit sign |
Completion end October 23 |
King Street KKAM006 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Station Road KSFA031 |
Staplehurst |
Replacement Street Light |
Completion end October 23 |
Station Approach KSES001 |
Staplehurst |
Replacement Street Light |
Completion end October 23 |
Recreation Close KRAG004 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Shaftesbury Drive KSBB010 |
Maidstone |
Replacement Street Light |
Completed |
Tufton Street KTCL003 |
Maidstone |
Replacement Street Light |
Completed |
Fir Tree Grove KFAY010 |
Walderslade |
Replacement Street Light |
Completed |
Fir Tree Grove KFAY011 |
Walderslade |
Replacement Street Light |
Completed |
Fir Tree Grove KFAY012 |
Walderslade |
Replacement Street Light |
Completed |
Clifton Close KCEL001 |
Maidstone |
Replacement Street Light |
Completed |
Clifton Close KCEL002 |
Maidstone |
Replacement Street Light |
Completed |
Royal Engineers Road KRCR033 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Royal Engineers Road KRCR034 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Royal Engineers Road KRCR035 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Emsworth Grove KEAY005 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Charlbury Close KCBH002 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Charlbury Close KCBH003 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Chancery Lane KCAZ002 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Sutton Road KSGF005 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Waterlow Road KWAT005 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Glebe Lane KGAS014 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Brishing Lane KBFG003 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Spenlow Drive KSHZ004 |
Walderslade |
Replacement Street Light |
Completion end October 23 |
Spenlow Drive KSHZ008 |
Walderslade |
Replacement Street Light |
Completion end October 23 |
Victoria Street KVAJ001 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Victoria Street KVAJ002 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Westmarsh Close KWBT004 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Westmarsh Close KWBT006 |
Maidstone |
Replacement Street Light |
Completion end October 23 |
Appendix D – Transportation and Safety Schemes
Casualty Reduction Measures
The Schemes Planning & Delivery team is implementing schemes within Maidstone Borough, to meet Kent County Council’s strategic targets (for example, addressing traffic congestion or improving road safety). Casualty reduction measures have been identified to address a known history of personal injury crashes. Status correct as of 29/06/23.
Local Transport Plan Funded Schemes |
||||
Road Name |
Description of Works |
Current Status |
||
Casualty reduction measures (reactive) – Maidstone |
||||
A229 Running Horse Turbo Roundabout |
Conversion of existing junction to a turbo roundabout, including all approaches (except for the M20 slip roads, as these are not maintained by Kent County Council). |
Design |
||
Yelsted Lane jw Dunn Street, Boxley |
Upgrade of junction signing and improvement of Dunn Street visibility splay |
Design |
||
LTP Schemes - Maidstone |
||||
Hart Street/Barker Road |
Experimental one-way scheme – 18-month trial |
Part complete |
||
|
|
|
||
Externally Funded Schemes
The Schemes Planning & Delivery team is implementing schemes within Maidstone Borough funded by external corporations whilst still meeting Kent County Council’s strategic targets with the road network.
Externally Funded Schemes |
|||
Road Name |
Description of Works |
Source of Funding |
Current Status |
|
|
|
|
|
|
|
|
Appendix E – Developer Funded Works
Developer Funded Works (Section 278 Agreement Works) Maidstone Borough - Contact Officer Sarah Parris |
Scheme Name |
File Ref. |
Officer |
Parish |
Description of Works |
Current Status |
Bell Farm, North Street |
MA003098 |
SN |
Barming |
New accesses to split sites, shared surface, and new crossing point |
Highway works completed. Stage 3 Safety Audit Awaited. |
Barty Farm, Roundwell, |
MA003278 |
AD |
Bearsted |
New Bellmouth and Lining works |
Defects issued |
Cross Keys |
MA003100 |
JH |
Bearsted |
New access, crossing point and parking area |
Works Completed |
Bicknor Road |
MA003256 |
AP |
Bicknor |
Formation of hard surfaced passing places |
Awaiting technical approval |
Lyewood Farm, Green Lane |
MA3247 MA3248 |
AP |
Boughton Monchelsea |
New housing development and access |
Awaiting completion of remedial works |
Hubbards Lane |
MA003084 |
CV |
Boughton Monchelsea |
Two accesses to minor developments |
Adopted |
Church Road/Deringwood Drive/Willington Street/Spot Lane |
MA003426/ MA003429/ MA003430/ MA003431/MA003436/ MA003437 |
SP |
Boxley |
Alterations to existing highway to include traffic signals, widening of road and junction widening/narrowing |
Deringwood Drive/Church Road complete, Willington Street works under further discussions Church Road South works ongoing. |
Heath Road (North side – Murdoch Chase) |
MA003063 |
CV |
Coxheath |
New access and Footway work |
Adopted |
Forstal Lane |
MA003141 |
SP |
Coxheath |
Widening of road and new footpath with access to new development |
Works in maintenance. |
Bell Farm, Ashford Road |
MA003094 |
CV |
Harrietsham |
Realignment of Church Road to form new access onto A20. New footway along A20 |
Due for adoption |
Harrietsham Primary School |
MA3388 |
CV |
Harrietsham |
New access to car park, extend traffic calmed area |
Works in maintenance |
Oak Lane and Wheeler Street |
MA003048 |
CV |
Headcorn |
New footway plus junction improvements |
Works at end of maintenance, final remedials due |
Grigg Lane, Lenham Road,
|
MA003050 |
CV |
Headcorn |
Access onto Grigg Lane and Lenham Road. Footway on Grigg Lane |
Works near end of maintenance |
Lenham Road (South side) |
MA003057 |
CV |
Headcorn |
New access road works and footway. |
Footway and speed gateway works done, remedials to do. |
Lenham Road (North side) |
MA003062 |
CV |
Headcorn |
New Footway and site access |
Adopted |
Mill Bank Headcorn |
MA3119 |
CV |
Headcorn |
New bus stops and extend 30mph zone |
Works mostly completed before resurfacing. Minor works & additional road markings to complete shortly. |
Stonestile Road |
MA003412 |
JH |
Headcorn |
New access to twelve houses |
Works Completed |
Gibbs Farm Grigg Lane & Wheeler Street |
MA3250 |
SAS |
Headcorn |
Access Gibbs Farm dev’ment, zebra crossing on Wheeler St |
Works in maintenance. |
Ulcombe Road |
MA003150 |
SP |
Headcorn |
Access to new development |
Defect works required prior to adoption. |
Woodcut Farm, Ashford Road |
MA003423 |
SP |
Hollingbourne |
Alterations to A20 and access for new development |
RSA Complete now defects to complete. |
Genco Office |
MA003433 |
SP |
Hollingbourne |
New Access to Business and c/way alterations |
Works in maintenance |
Westwood Park, Ham Lane |
MA003305 |
AP |
Lenham |
Main and emergency accesses to new housing dev. |
Works Completed. Maintenance yet to start due to developer inaction |
Old Ashford Road, Adj Groom Way |
MA003356 |
AP |
Lenham |
New access and footway |
Works completed. Reduced speed limit not yet implemented. |
8 Faversham Road |
MA003032 |
CV |
Lenham |
New access |
In maintenance, streetlight to replace |
The Paddocks, Ashford Road (Grove House, Old Ashford Road) |
MA3114 |
CV |
Lenham |
New access, traffic island, speed reduction to 50mph & f/way link to Faversham Rd |
Remedials required to soft landscaping prior to adoption |
Headcorn Road Adj Rail bridge |
MA3404 |
CV |
Lenham |
New access road and extend 30mph limit |
Due for adoption |
Loder Close |
MA3424 |
JH |
Lenham |
New bell mouth access and footway |
Works Completed |
Gleamingwood Drive |
MA003441/MA003440 |
AP |
Lordswood |
New Access and development |
Going through Technical Approval. |
Bicknor Green, Gore Court Road |
MA003053 |
AD |
Maidstone |
Change of road priorities and widening / upgrading |
In Maintenance |
St Saviours Road, Maidstone |
MA003136 |
AD |
Maidstone |
Changes to layout for Morrisons Junction |
Agreement signed |
Buffkyn Way / Sutton Road |
MA003218 |
AD |
Maidstone |
Signalisation of the junction |
Approved – not signed |
Springwood Road Maidstone |
MA003438 |
AP |
Maidstone |
Stopping up of existing access and provision of new through footway |
Adopted |
531 Tonbridge Road |
MA003045 |
CV |
Maidstone |
Service layby for new retail unit |
Adoption imminent |
Wallis Avenue Phase 3, Parkwood |
MA003085 |
CV |
Maidstone |
Redevelopment of car park & shops opp. Longshaw Rd |
Works in maintenance |
Maidstone East Station |
MA3447 |
CV |
Maidstone |
Footway upgrade (& private parking improvement) |
Works in maintenance |
Royal Engineers Rd/Mill Lane |
MA3312 |
JH |
Maidstone |
Access to New Development |
Revised scheme under Technical Review awaiting updated drawings. |
Medway Street |
MA3326 |
JH |
Maidstone |
Subway Flood Protection Works |
Awaiting revised/updated drawings. |
Howard Drive |
MA003303 |
SP |
Maidstone |
Junction works to facilitate Bus Gateway entrance to Croudace site |
Awaiting Street Lighting issues to be resolved. |
Hermitage Lane, (opp. Maidstone Hospital) |
MA003060 |
SP |
Maidstone |
New Traffic signal junction |
Remedials booked in with developer ready for adoption |
Castle Dene, Maidstone |
MA003352 |
SP |
Maidstone |
New Access and further footway works and repairs |
Works completed, Adoption Imminent. Query re lining |
Perryfield Street |
MA3411 |
SP |
Maidstone |
New footpath/access to new houses |
Remedial works booked. |
Oakapple Phase 2A, Hermitage Lane |
MA003444 |
SP |
Maidstone |
Development adjoining existing development |
Going through Technical Approval |
Langley Park Farm |
MA003130 |
AD |
Maidstone / Langley |
New Roundabout and associated works for entrance to Countryside Estate |
Works complete |
MAP Depot, Goudhurst Road |
MA003012 |
CV |
Marden |
New bellmouth junction and footway |
Final Remedials due, (mini-SID provided to Parish for monitoring traffic flows) |
The Parsonage, Goudhurst Road |
MA003066 MA003067 |
CV |
Marden |
New access and associated upgrade works |
Final remedials scheduled |
Albion Road, Marden |
MA003132 |
SP |
Marden |
New Access & development |
Works in maintenance |
Fishers Farm (West), Headcorn Road (Bovis) (off-site works) |
MA3037/1 |
AP |
Staplehurst |
Pedestrian crossovers on Headcorn Road/ |
Works completed, remedial works completed, stage 3 road safety audit response required before first certificate issue |
Oliver Road Staplehurst |
MA003019 |
CV |
Staplehurst |
Ped crossing to Marden Road, junction markings and bus boarders |
Near end of maintenance – documentation to be received |
Hen and Duckhurst Farm, Marden Road |
MA003109 |
CV |
Staplehurst |
New Roundabout for development access |
In Maintenance |
High Street Staplehurst |
MA3446 |
CV |
Staplehurst |
2 x new bus stop upgrades (kerbs and markings) |
Works in maintenance |
Fishers Farm (East) Headcorn Road (Redrow) |
MA3106 |
SP |
Staplehurst |
Realignment and new access at Headcorn Road/Pile Lane junction |
Works still ongoing and Defects already started.
|
Pristling Lane |
MA3415 |
SP |
Staplehurst |
Widened access & Ditch works |
Awaiting defect completion prior to adoption. |
Sapphire Kennels Headcorn Road |
MA3407 |
AP |
Sutton Valence |
Access to new development and 40mph extension |
Awaiting remedial works to be implemented. Delayed due to developer inaction |
Valdene Industrial Estate |
MA003054 |
CV |
Sutton Valence |
Upgrade of existing bellmouth and extension to f/w |
At final remedials stage prior to adoption |
The Oaks, Maidstone Road |
MA003078 |
CV |
Sutton Valence |
Upgrade existing Vehicle crossing access to Bellmouth with tactile crossing. |
In maintenance |
Warmlake Nurseries |
MA003443 |
SP |
Sutton Valence |
New access to small development |
Works in maintenance |
Farleigh Hill Tovil (Opp KCC waste site) |
MA3413 |
AP |
Tovil |
New access opp Burial Gnd Ln KCC Recycling centre |
Awaiting completion of legal agreement |
Tovil Green Lane |
MA003095 |
CV |
Tovil |
New Footway and crossing point to side of site |
In maintenance |
Mount Ave/Blunden Lane |
MA3180 |
CV |
Yalding |
New accesses at site entrance |
Adoption imminent |
Vicarage Road |
MA003121 |
SP/JH |
Yalding |
New access to development and speed restraints on existing Highway |
Under review |
Yalding Business Park, Hampstead Lane |
MA003450 |
JH |
Yalding |
New accesses into business park |
Under review – stopping up order underway. |
Old Ham Lane |
MA003448 |
CV |
Lenham |
C/W widening and footway for new development |
Technical review in progress |
Somerfield Terrace A20 London Road |
MA003455 |
CV |
Maidstone |
Bus stop improvements |
Awaiting installation of Bus Shelter |
Hampstead Lane/Maidstone Road |
MA003456 |
JH |
Yalding |
New right turn lane |
Currently under review – TRO to extend 30mph speed limit underway |
The Street Detling |
MA003457 |
CV |
Detling |
New access and move bus stop |
Submission under review |
Straw Mill Hill |
MA003458 |
CV |
Tovil |
New access to small development |
Initial submission received |
Loddington Farm, Heath Road, |
MA003464 |
CV |
Boughton |
New Access |
Going through Technical Approval process |
Chartway Street |
MA003462 |
AA |
Sutton Valence |
New Access |
Going through Technical Approval and planning conditions. |
A249, Access, Scammell Lodge Farm |
MA003461 |
AA |
Maidstone |
New access and acceleration lane |
Going through technical Approval process |
St Michaels Close and Beddow Way |
MA003459 |
AA |
Aylesford |
Reinstatement of old access and new access on St Michaels and Beddow Way |
Technical Approval Given |
High Street, Staplehurst |
MA003463 |
CV |
Staplehurst |
Alterations to two accesses |
Going through Technical Approval |
Appendix F – Bridge Works
Bridge Works – Contact Officer Helen Rowe
|
|||
Road Name |
Parish |
Description of Works |
Current Status |
Wat Tyler Way |
Maidstone |
Centenary Viaduct (KCC no. 3935) – Expansion joint replacement |
Planned for winter 2023 |
Appendix G – Traffic Systems
There is a programme of scheduled maintenance to refurbish life expired traffic signal equipment across the county based upon age and fault history. The delivery of these schemes is dependent upon school terms and holiday periods; residents, businesses and schools will be informed verbally and by a letter drop of the exact dates when known.
Traffic Systems - Contact Officer: Toby Butler |
||
Location |
Description of Works |
Current Status |
A229 Hayle Road / Campbell Road, Maidstone (11-0433) |
Refurbish existing traffic signal-controlled junction |
Not yet programmed |
Appendix H - Combined Members Grant programme update
Member Highway Fund programme update for the Maidstone District
The following schemes are those, which have been approved for funding by both the relevant Member and by Haroona Chughtai, Director of Highways and Transportation. The list only includes schemes, which are:
· in design
· at consultation stage
· about to be programmed
· recently completed on site.
The list is up to date as of 29.06.23.
The details given below are for highway projects only. This report does not detail:
· contributions Members have made to other groups such as parish councils.
· highway studies
· traffic/ non-motorised user surveys funded by Members.
More information on the schemes listed below can be found by contacting the Highway Manager for the Maidstone District, Susan Laporte.
[ ]
Details of Scheme |
Status |
|
|
[ ]
Details of Scheme |
Status |
|
|
Legal Implications
1.1.1 Not applicable.
1.2 Financial and Value for Money Considerations
1.2.1 Not applicable.
1.3 Risk Assessment
1.3.1 Not applicable.
Contacts: Richard Emmett / Susan Laporte 03000 418181