Subject: Highway Works Programme 2011/12

To:                              Maidstone Joint Transportation Board

 

By:                              KCC Highways and Transportation

 

Date:                           18th October 2023

 

Subject:                      Highways Forward Works Programme: 2023/24 and 2024/25

 

Classification:           Information Only

 

 

Summary: This report updates Members on the identified schemes approved for construction

 

 

1. Introduction

 

This report provides an update and summarises schemes that have been programmed for delivery in 2023/24 and 2024/25.

 

In summer 2021 Kent County Council published a Highways Asset Management Plan (HAMP), which included, as Appendix C, a five-year Forward Works Programme for the years 2021/22 to 2025/26.  this reflected the need to move away from annual programmes and to consider asset management activity a multi-year one.

 

The first part of the programme concerned the two years 2021/22 - 2022/23. Around half of the schemes included in that programme have now been delivered, and as a result we have now produced a new programme covering the years 2023/24 and 2024/25. As before, most of the sites included in this programme have already been verified by our engineers.

 

The second part of our programme related to years three to five of our five-year programme (2023/24 - 2025/26). This too needs revision to cover the years 2024/25 – 2026/27, and the work required to do this is currently in progress. As before, our new years three to five programme will be largely based on data from our asset management systems, so may be subject to more changes as the schemes are verified.

 

This programme is subject to regular review and may change for several reasons including budget allocation, contract rate changes, inflationary pressures such as material price increases, conflicting works, and to reflect our changing priorities. The programme and extent of individual sites within the programme may also be revised following engineering assessment during the design phase, and additional sites may be added or others advanced if their condition deteriorates rapidly so that we need to react to keep the highway in a safe and serviceable condition.

 

Further information about how we manage our highway infrastructure, including our county-wide five-year forward works programme, may be found on our website:

 

Managing highway infrastructure - Kent County Council

 

In addition to planned maintenance of our highway assets, this report includes transportation and safety schemes, developer funded works, Combined Members Grant schemes, and planned maintenance of public rights of way.

 

 

Road, Footway & Cycleway Renewal and Preservation Schemes – see Appendix A

           

Drainage Repairs & Improvements – see Appendix B

 

Street Lighting – see Appendix C

 

Transportation and Safety Schemes see Appendix D

  • Casualty Reduction Measures
  • Externally Funded Schemes

 

Developer Funded Works – see Appendix E

 

Bridge Works see Appendix F

 

Traffic Systems – see Appendix G

 

Combined Members Grant – Member Highway Fund – see Appendix H

 

 

 

Conclusion

 

1.    This report is for Members’ information.

 

Contact Officers:

 

The following contact officers can be contacted on 03000 418181.

 

Richard Emmett                                  Senior Highway Manager West Kent

Susan Laporte                                     Maidstone Highway Manager

Alan Casson                                        Strategic Asset Manager                   

Earl Bourner                                       Drainage Asset Manager

Helen Rowe                                        Structures Asset Manager

Sue Kinsella                                        Street Light Asset Manager

Toby Butler                                         Traffic Operations and Technology Manager

Jamie Hare                                         Development Agreements Manager

Nikola Floodgate                                 Road Safety and Active Travel Group Manager

           


Appendix A – Road, Footway and Cycleway Renewal and Preservation Scheme

 

The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged, and the residents will be informed by a letter drop to their homes.

 

 

Machine Resurfacing – Contact Officer Mr Byron Lovell

Road Name

Parish

Extent of Works

Current Status

Copsewood Way

Bearsted

Concrete Rehabilitation

Full length

 

Completed

A229 Cranbrook Road

Staplehurst

Retexturing

Approximately 50m between Knoxbridge Café and Cork Lane

 

Completed

A274 Headcorn Road

Sutton Valence

Retexturing

North of New Barn Road junction (Maidstone bound)

 

Completed

B2012 Holland Road

Maidstone

Retexturing

HFS approach to A249 Sittingbourne Road

 

Completed

Bircholt Road

Maidstone

Full length

 

To be programmed early 2024

Upper Fant Road

Maidstone

Bower Lane to Hackney Road

 

Programmed 19th October 2023

Milton Street

Maidstone

A26 Tonbridge Road to Hackney Road

 

Programmed 3rd November 2023

 

Footway Improvement - Contact Officer Mr Neil Tree

Road Name

Parish

Extent and Description of Works

Current Status

Tintern Road

Allington

Footway Protection

Entire Extents

 

Completed

Flaxman Drive

Allington

Footway Protection

Entire Extents

 

Completed

Anerley Close

Allington

Footway Protection

Entire Extents

 

Completed

Beckham Drive

Allington

Footway Protection

Entire Extents

 

Completed

Eynsford Road

Allington

Footway Protection

Entire Extents

 

Completed

Stanstead Close

Allington

Footway Protection

Entire Extents

 

Completed

Stockbury Drive

Allington

Footway Protection

Entire Extents

 

Completed

Fountain Lane

Barming

Footway Protection

Sections between Tonbridge Road and Heath Road

 

Completed

Surface Treatments – Contact Officer Mr Jonathan Dean

Road Name

Parish

Extent and Description of Works

Current Status

MARLEY ROAD (DICKLEY LANE)

Lenham (Harrietsham)

Marley Works to Steeds Hill

(Micro Surfacing)

 

Completed

GRIGG LANE (PHASE 3) Section not done due to covid vaccination centre access

Headcorn

Headcorn Surgery (The Hardwicks) to Oak Lane

(Micro Surfacing)

 

Completed

CHURCH LANE

Harrietsham

A20 Ashford Road to Marley Lane

(Micro Surfacing)

 

Completed

SHENLEY ROAD

Headcorn

A274 Biddenden Road to Whitehouse Lane

(Micro Surfacing)

 

Completed

HUNTON HILL

Hunton

East Street to Entrance to South Lodge

(Micro Surfacing)

 

Completed

SUTTON ROAD

Maidstone

From Northumberland Avenue to Morrisons

(Micro Surfacing)

 

Completed

CLAYGATE ROAD

Yalding

Darmen Lane to Emmett Hill Road

(Micro Surfacing)

 

Completed

HOGBARN LANE

Harrietsham

Ringlestone Road to Stede Hill

(Micro Surfacing)

 

Completed

PENENDEN HEATH ROAD

Maidstone

From A249 to Boxley Road

(Micro Surfacing)

 

Completed

FARLEIGH LANE

East Farleigh

Glebe Road to Rectory Lane (Little Fant Farm)

(Micro Surfacing)

 

Completed

PATTENDEN LANE

Marden

Underlyn Lane to West End

(Micro Surfacing)

 

Completed

ROUNDWELL (& THE STREET)

Bearsted

From A20 Ashford Road to 4 South View (including The Street)

(Micro Surfacing)

 

Completed

GRAVE LANE

Staplehurst

Clapper Lane to Summerhill Road

(In situ Road Recycling / Retread)

 

Completed

SOUTHERNDEN ROAD

Headcorn

(West to East) Lenham Road to Grigg Lane

(In situ Road Recycling / Retread)

 

Completed

ULCOMBE ROAD (TILDEN ROAD)

Headcorn

Tattlebury Lane to Crumps Lane

(In situ Road Recycling / Retread)

 

Completed

COUCHMAN GREEN LANE (SWEETLANDS LANE)

Staplehurst

Pile Lane to Headcorn Road

(In situ Road Recycling / Retread)

 

Completed

BRICK KILN LANE

East Sutton

Whole Road

(In situ Road Recycling / Retread)

 

Completed

PAGEHURST ROAD

Staplehurst

Between Five Ash Lane and Thorn Road

(Surface Dressing)

 

Postponed until 2024

SHERENDEN LANE

Marden

Full length (Wilden Park Road to Goudhurst Road)

(Surface Dressing)

 

Completed

CLAYGATE ROAD (PART)

Marden

Jarmons Lane to Claygate Road

(Surface Dressing)

 

Completed

JARMONS LANE (PART)

Collier Street

Collier Street to Claygate Road

(Surface Dressing)

 

Completed

SPENNY LANE

Collier Street

Claygate Road to Martins Fruit Farm

(Surface Dressing)

 

Completed

STAPLEHURST ROAD (FRITTENDEN ROAD)

Staplehurst

A229 to Park Wood Road

(Surface Dressing)

 

Completed

CHART ROAD

Sutton Valence

Church Road to Chart Hill Road

(Surface Dressing)

 

Completed

CRUMPS LANE

Ulcombe

Headcorn Road to Lenham Road

(Surface Dressing)

 

Completed

 

 

 

 

 

 

 

 

 

 

 

Appendix B – Drainage

 

 

Drainage Repairs & Improvements - Contact Officer Earl Bourner 

Road Name

Parish

Description of Works

Current Status

Gatland Lane

Maidstone

Drainage Improvement Scheme between Chamberlain Avenue and Fant Lane to remedy flooding issues in this area

Majority of works complete, however due to unexpected hard dig,

return visit to complete a small amount of pipework and 1no. manhole is required. Programme dates TBC with contractor

Smith’s Hill

West Farleigh

Further works following completion of CCTV Surveys for repair works.

Job raised – awaiting confirmation of programme dates

Upper Fant Road

Maidstone

Drainage repair works (Poor connections and collapse/possible void)

Job raised – awaiting confirmation of programme dates

Maidstone Road

Nettlestead

Small amount of ditching work/exposing headwall.

Job raised – awaiting confirmation of programme dates

Woodcock Lane

Boughton Malherbe

Drainage pipework repair.

Job raised – awaiting confirmation of programme dates

Bon Fleur Lane

Linton

Drainage chamber repair.

Job raised – awaiting confirmation of programme dates

Faversham Road

Wichling

Drainage gully replacement, with new kerbed apron.

Works Completed on 20/09/2023.

 

Appendix C – Street Lighting

 

Structural testing of KCC owned streetlights has identified the following as requiring replacement. A status of complete identifies that the column replacement has been carried out. Programme dates are identified for those still requiring replacement.

Road Name

Location

Description of Works

Current Status

Tonbridge Road KTBU022

Maidstone

 

Replacement Street Light

Completion end January 24

Tonbridge Road KTBU051

Maidstone

 

Replacement Street Light

Completion end January 24

Sutton Road KSGF007

Maidstone

 

Replacement Street Light

Completion end January 24

Farleigh Hill KFAH002

Maidstone

 

Replacement Street Light

Completion end January 24

King Street KKAM013

Maidstone

 

Replacement Street Light

Completion end January 24

Ashford Road KABQ017

Maidstone

 

Replacement Street Light

Completed

Ashford Road KABQ019

Maidstone

 

Replacement Street Light

Completed

Fairmeadow KFAE509

Maidstone

 

Replacement Lit sign

Completion end January 24

Fairmeadow KFAE512

Maidstone

 

Replacement Lit sign

Completion end January 24

Fairmeadow KFAE508

Maidstone

 

Replacement Lit sign

Completion end January 24

King Street KKAM006

Maidstone

 

Replacement Street Light

Completion end January 24

Station Road KSFA031

Staplehurst

 

Replacement Street Light

Completed

Station Approach KSES001

Staplehurst

 

Replacement Street Light

Completed

Recreation Close KRAG004

Maidstone

 

Replacement Street Light

Completion end January 24

Royal Engineers Road KRCR033

Maidstone

 

Replacement Street Light

Completion end January 24

Royal Engineers Road KRCR035

Maidstone

 

Replacement Street Light

Completion end January 24

Emsworth Grove KEAY005

Maidstone

 

Replacement Street Light

Completed

Charlbury Close KCBH002

Maidstone

 

Replacement Street Light

Completion end January 24

Charlbury Close KCBH003

Maidstone

 

Replacement Street Light

Completion end January 24

Chancery Lane KCAZ002

Maidstone

 

Replacement Street Light

Completed

Sutton Road KSGF005

Maidstone

 

Replacement Street Light

Completion end January 24

Waterlow Road KWAT005

Maidstone

 

Replacement Street Light

Completed

Glebe Lane KGAS014

Maidstone

 

Replacement Street Light

Completion end January 24

Brishing Lane KBFG003

Maidstone

 

Replacement Street Light

Completion end January 24

Spenlow Drive KSHZ004

Walderslade

 

Replacement Street Light

Completed

Spenlow Drive KSHZ008

Walderslade

 

Replacement Street Light

Completed

Victoria Street KVAJ001

Maidstone

 

Replacement Street Light

Completed

Victoria Street KVAJ002

Maidstone

 

Replacement Street Light

Completed

Westmarsh Close KWBT004

Maidstone

 

Replacement Street Light

Completed

Westmarsh Close KWBT006

Maidstone

 

Replacement Street Light

Completed

Impton Lane KIAC006

Walderslade

 

Replacement Street Light

Completed

Impton Lane KIAC017

Walderslade

 

Replacement Street Light

Completed

Impton Lane KIAC031

Walderslade

 

Replacement Street Light

Completed

Impton Lane KIAC035

Walderslade

 

Replacement Street Light

Completed

Impton Lane KIAC036

Walderslade

 

Replacement Street Light

Completed

Gentian Close KGCZ003

Maidstone

 

Replacement Street Light

Completed

Gentian Close KGCZ005

Maidstone

 

Replacement Street Light

Completion end January 24

King Street KKAM016

Maidstone

 

Replacement Street Light

Completion end January 24

King Street KKAM019

Maidstone

 

Replacement Street Light

Completion end January 24

Woodcocks KWFN001

Headcorn

 

Replacement Street Light

Completion end January 24

Woodcocks KWFN002

Headcorn

 

Replacement Street Light

Completion end January 24

Woodcocks KWFN003

Headcorn

 

Replacement Street Light

Completion end January 24

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Appendix D – Transportation and Safety Schemes

 

Casualty Reduction Measures

 

The Schemes Planning & Delivery team is implementing schemes within Maidstone Borough, to meet Kent County Council’s strategic targets (for example, addressing traffic congestion or improving road safety).  Casualty reduction measures have been identified to address a known history of personal injury crashes. Current status correct as of 28/09/23.

 

Local Transport Plan Funded Schemes

Road Name

Description of Works

Current Status


Casualty reduction measures (reactive) – Maidstone

A229 Running Horse Turbo Roundabout

Conversion of existing junction to a turbo roundabout,

including all approaches (with

the exception of the M20 slip roads, as these are not

maintained by Kent County Council).

This scheme has been reprogrammed to the 2024/2025

Fiscal year due to the lack of road space availability.

Ordered

Yelsted Lane jw Dunn Street, Boxley

Upgrade of junction signing and improvement of Dunn Street visibility splay

Ordered

LTP Schemes - Maidstone

Hart Street/Barker Road

Experimental one-way scheme - 18-month trial ongoing

Part Complete

 

 

Externally Funded Schemes

 

The Schemes Planning & Delivery team is implementing schemes within Maidstone Borough funded by external corporations whilst still meeting Kent County Council’s strategic targets with the road network.

 

THERE ARE NO PROJECTS OF THIS TYPE TO REPORT

 

Externally Funded Schemes –

Road Name

Description of Works

Source of

Funding

Current Status

 

 

 

 

 

Appendix E – Developer Funded Works

 

Developer Funded Works (Section 278 Agreement Works) Maidstone Borough - Contact Officer Sarah Parris

Scheme Name

File Ref.

Officer

Parish

Description of Works

Current Status

St Michaels Close and Beddow Way

MA003459

AA

Aylesford

Reinstatement of old access and new access on St Michaels and Beddow Way

Technical Approval Given

Bell Farm, North Street

MA003098

SN

Barming

New accesses to split sites, shared surface, and new crossing point

Highway works completed. Stage 3 Safety Audit Awaited.

Barty Farm, Roundwell,

MA003278

AD

Bearsted

New Bellmouth and Lining works

Defects issued

Cross Keys

MA003100

JH

Bearsted

New access, crossing point and parking area

Works Completed

Church Road/Deringwood Drive/Willington Street/Spot Lane

MA003426/ MA003429/ MA003430/ MA003431/MA003436/ MA003437

SP

Bearsted/

Church Road/Deringwood Drive/Willington Street/Spot Lane

MA003426/ MA003429/ MA003430/ MA003431/MA003436/ MA003437

Bicknor Road

MA003256

AP

Bicknor

Formation of hard surfaced passing places

Awaiting technical approval

Loddington Farm, Heath Road,

MA003464

CV

Boughton

New Access to Farm Shop

Stat Diversion required prior to completion of works


Lyewood Farm, Green Lane

MA3247

MA3248

AP

Boughton Monchelsea

New housing development and access

Awaiting completion of remedial works

Forstal Lane

MA003141

SP

Coxheath

Widening of road and new footpath with access to new development

Snagging works to be conducted and soon to be adopted.

 

The Street Detling

MA003457

CV

Detling

New access and move bus stop

Submission under review

Bell Farm, Ashford Road

MA003094

CV

Harrietsham

Realignment of Church Road to form new access onto A20. New footway along A20

Due for adoption

Harrietsham Primary School

MA3388

CV

Harrietsham

New access to car park, extend traffic calmed area

Works in maintenance

Oak Lane and Wheeler Street

MA003048

CV

Headcorn

New footway plus junction improvements

Works at end of maintenance, final remedials due

Grigg Lane, Lenham Road,

 

MA003050

CV

Headcorn

Access onto Grigg Lane and Lenham Road. Footway on Grigg Lane

Works near end of maintenance. Final remedials due.

Lenham Road (South side)

MA003057

CV

Headcorn

New access road works and footway.

Footway and speed gateway works done, remedials to do.

Lenham Road (North side)

MA003062

CV

Headcorn

New Footway and site access

Adopted

Mill Bank Headcorn

MA3119

CV

Headcorn

New bus stops and extend 30mph zone

Works mostly completed before resurfacing. Minor works & additional road markings to complete shortly.

Stonestile Road

MA003412

JH

Headcorn

New access to twelve houses

Works Completed

Gibbs Farm Grigg Lane & Wheeler Street

MA3250

SAS

Headcorn

Access Gibbs Farm development, zebra crossing on Wheeler St

Works in maintenance.

Ulcombe Road

MA003150

SP

Headcorn

Access to new development

Snagging complete inspection required prior adoption.

Woodcut Farm, Ashford Road

MA003423

SP

Hollingbourne

Alterations to A20 and access for new development

Snagging works completed inspection required prior to adoption.

Genco Office

MA003433

SP

Hollingbourne

New Access to Business and carriageway alterations

Snagging works in discussion.

Westwood Park, Ham Lane

MA003305

AP

Lenham

Main and emergency accesses to new housing dev.

Works Completed. Maintenance yet to start due to developer inaction

Old Ashford Road, Adj Groom Way

MA003356

AP

Lenham

New access and footway

Works completed. Reduced speed limit not yet implemented.

8 Faversham Road

MA003032

CV

Lenham

New access

In maintenance, streetlight to replace

The Paddocks, Ashford Road (Grove House, Old Ashford Road)

MA3114

CV

Lenham

New access, traffic island, speed reduction to 50mph & f/way link to Faversham Road

Remedials required to soft landscaping prior to adoption

Headcorn Road

Adj Rail bridge

MA3404

CV

Lenham

New access road and extend 30mph limit

Due for adoption

Old Ham Lane

MA003448

CV

Lenham

C/W widening and footway for new development

Technical review in progress

Loder Close

MA3424

JH

Lenham

New bell mouth access and footway

Works Completed

Gleamingwood Drive

MA003441/MA003440

AP

Lordswood

New Access and development

Going through Technical Approval.

A249, Access, Scammell Lodge Farm

MA003461

AA

Maidstone

New access and acceleration lane

Technical Approval Given

Bicknor Green, Gore Court Road

MA003053

AD

Maidstone

Change of road priorities and widening / upgrading

 

In Maintenance

St Saviours Road, Maidstone

MA003136

AD

Maidstone

Changes to layout for Morrisons Junction

Agreement signed

Buffkyn Way / Sutton Road

MA003218

AD

Maidstone

Signalisation of the junction

Approved – not signed

Springwood Road Maidstone

MA003438

AP

Maidstone

Stopping up of existing access and provision of new through footway

Adopted

531 Tonbridge Road

MA003045

CV

Maidstone

Service layby for new retail unit

Due for adoption

Wallis Avenue Phase 3, Parkwood

MA003085

CV

Maidstone

Redevelopment of car park & shops opp. Longshaw Rd

Works in maintenance

Maidstone East Station

MA3447

CV

Maidstone

Footway upgrade (& private parking improvement)

Works in maintenance

Somerfield Terrace A20 London Road

MA003455

CV

Maidstone

Bus stop improvements

Awaiting installation of Bus Shelter

Royal Engineers Rd/Mill Lane

MA3312

JH

Maidstone

Access to New Development

Revised scheme under Technical Review awaiting updated drawings.

Medway Street

MA3326

JH

Maidstone

Subway Flood Protection Works

Awaiting revised/updated drawings.

Howard Drive

MA003303

SP

Maidstone

Junction works to facilitate Bus Gateway entrance to Croudace site

Adopted.

Hermitage Lane, (opp. Maidstone Hospital)

MA003060

SP

Maidstone

New Traffic signal junction

Remedials booked in with developer ready for adoption

Castle Dene, Maidstone

MA003352

SP

Maidstone

New Access and further footway works and repairs.

 

Adopted.

Perryfield Street

MA3411

SP

Maidstone

New footpath/access to new houses

Adoption due.

Oakapple Phase 2A, Hermitage Lane

MA003444

SP

Maidstone

Development adjoining existing development

Going through Technical Approval

Langley Park Farm

MA003130

AD

Maidstone / Langley

New Roundabout and associated works for entrance to Countryside Estate

Works complete

MAP Depot, Goudhurst Road

MA003012

CV

Marden

New bellmouth junction and footway

Final Remedials due, (mini-SID provided to Parish for monitoring traffic flows)

The Parsonage, Goudhurst Road

MA003066

MA003067

CV

Marden

New access and associated upgrade works

Final remedials scheduled

Albion Road, Marden

MA003132

SP

Marden

New Access & development

Awaiting paperwork prior to adoption.

Fishers Farm (West), Headcorn Road (Bovis) (off-site works)

MA3037/1

AP

Staplehurst

Pedestrian crossovers on Headcorn Road/
Hurst Close

Works completed, remedial works completed, stage 3 road safety audit response required before first certificate issue

Oliver Road Staplehurst

MA003019

CV

Staplehurst

Ped crossing to Marden Road, junction markings and bus boarders

Documentation to be received prior to adoption

Hen and Duckhurst Farm, Marden Road

MA003109

CV

Staplehurst

New Roundabout for development access

In Maintenance

High Street Staplehurst

MA3446

CV

Staplehurst

2 x new bus stop upgrades (kerbs and markings)

Due for adoption

High Street, Staplehurst

MA003463

CV

Staplehurst

Alterations to two accesses

Going through Technical Approval

Fishers Farm (East) Headcorn Road (Redrow)

MA3106

SP

Staplehurst

Realignment and new access at Headcorn Road/Pile Lane junction

Works still ongoing and Defects already started.

 

Pristling Lane

MA3415

SP

Staplehurst

Widened access & Ditch works

Awaiting defect completion prior to adoption.

Chartway Street

MA003462

AA

Sutton Valence

New Access

 Technical Approval complete but waiting      update on outstanding planning issues.

Sapphire Kennels Headcorn Road

MA3407

AP

Sutton Valence

Access to new development and 40mph extension

Awaiting remedial works to be implemented. Delayed due to developer inaction

Valdene Industrial Estate

MA003054

CV

Sutton Valence

Upgrade of existing bellmouth and extension to f/w

At final remedials stage prior to adoption

The Oaks, Maidstone Road

MA003078

CV

Sutton Valence

Upgrade existing Vehicle crossing access to Bellmouth with tactile crossing.

In maintenance

Warmlake Nurseries

MA003443

SP

Sutton Valence

New access to small development

Adopted.

Farleigh Hill Tovil

(Opp KCC waste site)

MA3413

AP

Tovil

New access opp Burial Ground Ln KCC Recycling centre

Awaiting completion of legal agreement

Tovil Green Lane

MA003095

CV

Tovil

New Footway and crossing point to side of site

In maintenance

Straw Mill Hill

MA003458

CV

Tovil

New access to small development

Initial submission received

Mount Ave/Blunden Lane

MA3180

CV

Yalding

New accesses at site entrance

Adoption imminent

Vicarage Road

MA003121

SP/JH

Yalding

New access to development and speed restraints on existing Highway

Under review

Yalding Business Park, Hampstead Lane

MA003450

JH

Yalding

New accesses into business park

Under review – stopping up order underway.

Hampstead Lane/Maidstone Road

MA003456

JH

Yalding

New right turn lane

Currently under review – TRO to extend 30mph speed limit underway

 


Appendix F – Bridge Works

 

Bridge Works – Contact Officer Helen Rowe

 

Road Name

Parish

Description of Works

Current Status

Wat Tyler Way

Maidstone

Centenary Viaduct (KCC no. 3935) – Expansion joint replacement

Starting 20th October 2023 for 10 nights

Linton Hill, Maidstone

Marden

Stile (KCC no. 67) – Expansion joint replacement

Planned for winter 2023

Linton Road, Maidstone

Loose

Loose Viaduct (KCC no. 205) – Impact damage to the bridge parapet

Planned in September or October 2023 (dates are not confirmed yet)


Appendix G – Traffic Systems

 

There is a programme of scheduled maintenance to refurbish life expired traffic signal equipment across the county based upon age and fault history. The delivery of these schemes is dependent upon school terms and holiday periods; local residents, businesses and schools will be informed verbally and by a letter drop of the exact dates when known.

 

Traffic Systems - Contact Officer: Toby Butler

Location

Description of Works

Current Status

 A229 Hayle Road / Campbell Road, Maidstone (11-0433)

Refurbish existing traffic signal-controlled junction

Not yet programmed

 


Appendix H - Combined Members Grant programme update

 

Member Highway Fund programme update for the Maidstone Borough

 

The following schemes are those, which have been approved for funding by both the relevant Member and by Haroona Chughtai, Director of Highways and Transportation. The list only includes schemes, which are

·         in design

·         at consultation stage

·         about to be programmed

·         recently completed on site.

 

The list is up to date as of 28.09.23.

      

The details given below are for highway projects only.  This report does not detail

·         contributions Members have made to other groups such as parish councils.

·         highway studies

·         traffic/ non-motorised user surveys funded by Members.  

 

More information on the schemes listed below can be found by contacting the Highway Manager for the Maidstone Borough, Susan Laporte.

 

THERE ARE NO PROJECTS OF THIS TYPE TO REPORT

 

[  ]

Details of Scheme

Status

 

 

 

[  ]  

Details of Scheme

Status

 

 

 


Legal Implications

1.1.1         Not applicable.

1.2               Financial and Value for Money Considerations

1.2.1         Not applicable.

1.3               Risk Assessment

1.3.1         Not applicable.

Contacts: Richard Emmett / Susan Laporte 03000 418181