To: Maidstone Joint Transportation Board
By: KCC Highways and Transportation
Date: 18th October 2023
Subject: Highways Forward Works Programme: 2023/24 and 2024/25
Classification: Information Only
Summary: This report updates Members on the identified schemes approved for construction
1. Introduction
This report provides an update and summarises schemes that have been programmed for delivery in 2023/24 and 2024/25.
In summer 2021 Kent County Council published a Highways Asset Management Plan (HAMP), which included, as Appendix C, a five-year Forward Works Programme for the years 2021/22 to 2025/26. this reflected the need to move away from annual programmes and to consider asset management activity a multi-year one.
The first part of the programme concerned the two years 2021/22 - 2022/23. Around half of the schemes included in that programme have now been delivered, and as a result we have now produced a new programme covering the years 2023/24 and 2024/25. As before, most of the sites included in this programme have already been verified by our engineers.
The second part of our programme related to years three to five of our five-year programme (2023/24 - 2025/26). This too needs revision to cover the years 2024/25 – 2026/27, and the work required to do this is currently in progress. As before, our new years three to five programme will be largely based on data from our asset management systems, so may be subject to more changes as the schemes are verified.
This programme is subject to regular review and may change for several reasons including budget allocation, contract rate changes, inflationary pressures such as material price increases, conflicting works, and to reflect our changing priorities. The programme and extent of individual sites within the programme may also be revised following engineering assessment during the design phase, and additional sites may be added or others advanced if their condition deteriorates rapidly so that we need to react to keep the highway in a safe and serviceable condition.
Further information about how we manage our highway infrastructure, including our county-wide five-year forward works programme, may be found on our website:
Managing highway infrastructure - Kent County Council
In addition to planned maintenance of our highway assets, this report includes transportation and safety schemes, developer funded works, Combined Members Grant schemes, and planned maintenance of public rights of way.
Road, Footway & Cycleway Renewal and Preservation Schemes – see Appendix A
Drainage Repairs & Improvements – see Appendix B
Street Lighting – see Appendix C
Transportation and Safety Schemes – see Appendix D
- Casualty Reduction Measures
- Externally Funded Schemes
Developer Funded Works – see Appendix E
Bridge Works – see Appendix F
Traffic Systems – see Appendix G
Combined Members Grant – Member Highway Fund – see Appendix H
Conclusion
1. This report is for Members’ information.
Contact Officers:
The following contact officers can be contacted on 03000 418181.
Richard Emmett Senior Highway Manager West Kent
Susan Laporte Maidstone Highway Manager
Alan Casson Strategic Asset Manager
Earl Bourner Drainage Asset Manager
Helen Rowe Structures Asset Manager
Sue Kinsella Street Light Asset Manager
Toby Butler Traffic Operations and Technology Manager
Jamie Hare Development Agreements Manager
Nikola Floodgate Road Safety and Active Travel Group Manager
Appendix A – Road, Footway and Cycleway Renewal and Preservation Scheme
The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged, and the residents will be informed by a letter drop to their homes.
Machine Resurfacing – Contact Officer Mr Byron Lovell |
|||
Road Name |
Parish |
Extent of Works |
Current Status |
Copsewood Way |
Bearsted |
Concrete Rehabilitation Full length |
Completed |
A229 Cranbrook Road |
Staplehurst |
Retexturing Approximately 50m between Knoxbridge Café and Cork Lane |
Completed |
A274 Headcorn Road |
Sutton Valence |
Retexturing North of New Barn Road junction (Maidstone bound) |
Completed |
B2012 Holland Road |
Maidstone |
Retexturing HFS approach to A249 Sittingbourne Road |
Completed |
Bircholt Road |
Maidstone |
Full length |
To be programmed early 2024 |
Upper Fant Road |
Maidstone |
Bower Lane to Hackney Road |
Programmed 19th October 2023 |
Milton Street |
Maidstone |
A26 Tonbridge Road to Hackney Road |
Programmed 3rd November 2023 |
Footway Improvement - Contact Officer Mr Neil Tree |
|||
Road Name |
Parish |
Extent and Description of Works |
Current Status |
Tintern Road |
Allington |
Footway Protection Entire Extents |
Completed |
Flaxman Drive |
Allington |
Footway Protection Entire Extents |
Completed |
Anerley Close |
Allington |
Footway Protection Entire Extents |
Completed |
Beckham Drive |
Allington |
Footway Protection Entire Extents |
Completed |
Eynsford Road |
Allington |
Footway Protection Entire Extents |
Completed |
Stanstead Close |
Allington |
Footway Protection Entire Extents |
Completed |
Stockbury Drive |
Allington |
Footway Protection Entire Extents |
Completed |
Fountain Lane |
Barming |
Footway Protection Sections between Tonbridge Road and Heath Road |
Completed |
Surface Treatments – Contact Officer Mr Jonathan Dean |
|||
Road Name |
Parish |
Extent and Description of Works |
Current Status |
MARLEY ROAD (DICKLEY LANE) |
Lenham (Harrietsham) |
Marley Works to Steeds Hill (Micro Surfacing) |
Completed |
GRIGG LANE (PHASE 3) Section not done due to covid vaccination centre access |
Headcorn |
Headcorn Surgery (The Hardwicks) to Oak Lane (Micro Surfacing) |
Completed |
CHURCH LANE |
Harrietsham |
A20 Ashford Road to Marley Lane (Micro Surfacing) |
Completed |
SHENLEY ROAD |
Headcorn |
A274 Biddenden Road to Whitehouse Lane (Micro Surfacing) |
Completed |
HUNTON HILL |
Hunton |
East Street to Entrance to South Lodge (Micro Surfacing) |
Completed |
SUTTON ROAD |
Maidstone |
From Northumberland Avenue to Morrisons (Micro Surfacing) |
Completed |
CLAYGATE ROAD |
Yalding |
Darmen Lane to Emmett Hill Road (Micro Surfacing) |
Completed |
HOGBARN LANE |
Harrietsham |
Ringlestone Road to Stede Hill (Micro Surfacing) |
Completed |
PENENDEN HEATH ROAD |
Maidstone |
From A249 to Boxley Road (Micro Surfacing) |
Completed |
FARLEIGH LANE |
East Farleigh |
Glebe Road to Rectory Lane (Little Fant Farm) (Micro Surfacing) |
Completed |
PATTENDEN LANE |
Marden |
Underlyn Lane to West End (Micro Surfacing) |
Completed |
ROUNDWELL (& THE STREET) |
Bearsted |
From A20 Ashford Road to 4 South View (including The Street) (Micro Surfacing) |
Completed |
GRAVE LANE |
Staplehurst |
Clapper Lane to Summerhill Road (In situ Road Recycling / Retread) |
Completed |
SOUTHERNDEN ROAD |
Headcorn |
(West to East) Lenham Road to Grigg Lane (In situ Road Recycling / Retread) |
Completed |
ULCOMBE ROAD (TILDEN ROAD) |
Headcorn |
Tattlebury Lane to Crumps Lane (In situ Road Recycling / Retread) |
Completed |
COUCHMAN GREEN LANE (SWEETLANDS LANE) |
Staplehurst |
Pile Lane to Headcorn Road (In situ Road Recycling / Retread) |
Completed |
BRICK KILN LANE |
East Sutton |
Whole Road (In situ Road Recycling / Retread) |
Completed |
PAGEHURST ROAD |
Staplehurst |
Between Five Ash Lane and Thorn Road (Surface Dressing) |
Postponed until 2024 |
SHERENDEN LANE |
Marden |
Full length (Wilden Park Road to Goudhurst Road) (Surface Dressing) |
Completed |
CLAYGATE ROAD (PART) |
Marden |
Jarmons Lane to Claygate Road (Surface Dressing) |
Completed |
JARMONS LANE (PART) |
Collier Street |
Collier Street to Claygate Road (Surface Dressing) |
Completed |
SPENNY LANE |
Collier Street |
Claygate Road to Martins Fruit Farm (Surface Dressing) |
Completed |
STAPLEHURST ROAD (FRITTENDEN ROAD) |
Staplehurst |
A229 to Park Wood Road (Surface Dressing) |
Completed |
CHART ROAD |
Sutton Valence |
Church Road to Chart Hill Road (Surface Dressing) |
Completed |
CRUMPS LANE |
Ulcombe |
Headcorn Road to Lenham Road (Surface Dressing) |
Completed |
Appendix B – Drainage
Drainage Repairs & Improvements - Contact Officer Earl Bourner |
|||
Parish |
Description of Works |
Current Status |
|
Gatland Lane |
Maidstone |
Drainage Improvement Scheme between Chamberlain Avenue and Fant Lane to remedy flooding issues in this area |
Majority of works complete, however due to unexpected hard dig, return visit to complete a small amount of pipework and 1no. manhole is required. Programme dates TBC with contractor |
Smith’s Hill |
West Farleigh |
Further works following completion of CCTV Surveys for repair works. |
Job raised – awaiting confirmation of programme dates |
Upper Fant Road |
Maidstone |
Drainage repair works (Poor connections and collapse/possible void) |
Job raised – awaiting confirmation of programme dates |
Maidstone Road |
Nettlestead |
Small amount of ditching work/exposing headwall. |
Job raised – awaiting confirmation of programme dates |
Woodcock Lane |
Boughton Malherbe |
Drainage pipework repair. |
Job raised – awaiting confirmation of programme dates |
Bon Fleur Lane |
Linton |
Drainage chamber repair. |
Job raised – awaiting confirmation of programme dates |
Faversham Road |
Wichling |
Drainage gully replacement, with new kerbed apron. |
Works Completed on 20/09/2023. |
Appendix C – Street Lighting
Structural testing of KCC owned streetlights has identified the following as requiring replacement. A status of complete identifies that the column replacement has been carried out. Programme dates are identified for those still requiring replacement.
Road Name |
Location |
Description of Works |
Current Status |
Tonbridge Road KTBU022 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Tonbridge Road KTBU051 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Sutton Road KSGF007 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Farleigh Hill KFAH002 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
King Street KKAM013 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Ashford Road KABQ017 |
Maidstone |
Replacement Street Light |
Completed |
Ashford Road KABQ019 |
Maidstone |
Replacement Street Light |
Completed |
Fairmeadow KFAE509 |
Maidstone |
Replacement Lit sign |
Completion end January 24 |
Fairmeadow KFAE512 |
Maidstone |
Replacement Lit sign |
Completion end January 24 |
Fairmeadow KFAE508 |
Maidstone |
Replacement Lit sign |
Completion end January 24 |
King Street KKAM006 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Station Road KSFA031 |
Staplehurst |
Replacement Street Light |
Completed |
Station Approach KSES001 |
Staplehurst |
Replacement Street Light |
Completed |
Recreation Close KRAG004 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Royal Engineers Road KRCR033 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Royal Engineers Road KRCR035 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Emsworth Grove KEAY005 |
Maidstone |
Replacement Street Light |
Completed |
Charlbury Close KCBH002 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Charlbury Close KCBH003 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Chancery Lane KCAZ002 |
Maidstone |
Replacement Street Light |
Completed |
Sutton Road KSGF005 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Waterlow Road KWAT005 |
Maidstone |
Replacement Street Light |
Completed |
Glebe Lane KGAS014 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Brishing Lane KBFG003 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Spenlow Drive KSHZ004 |
Walderslade |
Replacement Street Light |
Completed |
Spenlow Drive KSHZ008 |
Walderslade |
Replacement Street Light |
Completed |
Victoria Street KVAJ001 |
Maidstone |
Replacement Street Light |
Completed |
Victoria Street KVAJ002 |
Maidstone |
Replacement Street Light |
Completed |
Westmarsh Close KWBT004 |
Maidstone |
Replacement Street Light |
Completed |
Westmarsh Close KWBT006 |
Maidstone |
Replacement Street Light |
Completed |
Impton Lane KIAC006 |
Walderslade |
Replacement Street Light |
Completed |
Impton Lane KIAC017 |
Walderslade |
Replacement Street Light |
Completed |
Impton Lane KIAC031 |
Walderslade |
Replacement Street Light |
Completed |
Impton Lane KIAC035 |
Walderslade |
Replacement Street Light |
Completed |
Impton Lane KIAC036 |
Walderslade |
Replacement Street Light |
Completed |
Gentian Close KGCZ003 |
Maidstone |
Replacement Street Light |
Completed |
Gentian Close KGCZ005 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
King Street KKAM016 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
King Street KKAM019 |
Maidstone |
Replacement Street Light |
Completion end January 24 |
Woodcocks KWFN001 |
Headcorn |
Replacement Street Light |
Completion end January 24 |
Woodcocks KWFN002 |
Headcorn |
Replacement Street Light |
Completion end January 24 |
Woodcocks KWFN003 |
Headcorn |
Replacement Street Light |
Completion end January 24 |
Appendix D – Transportation and Safety Schemes
Casualty Reduction Measures
The Schemes Planning & Delivery team is implementing schemes within Maidstone Borough, to meet Kent County Council’s strategic targets (for example, addressing traffic congestion or improving road safety). Casualty reduction measures have been identified to address a known history of personal injury crashes. Current status correct as of 28/09/23.
Local Transport Plan Funded Schemes |
||
Road Name |
Description of Works |
Current Status |
Casualty reduction measures (reactive) – Maidstone |
||
A229 Running Horse Turbo Roundabout |
Conversion of existing junction to a turbo roundabout, including all approaches (with the exception of the M20 slip roads, as these are not maintained by Kent County Council). This scheme has been reprogrammed to the 2024/2025 Fiscal year due to the lack of road space availability. |
Ordered |
Yelsted Lane jw Dunn Street, Boxley |
Upgrade of junction signing and improvement of Dunn Street visibility splay |
Ordered |
LTP Schemes - Maidstone |
||
Hart Street/Barker Road |
Experimental one-way scheme - 18-month trial ongoing |
Part Complete |
Externally Funded Schemes
The Schemes Planning & Delivery team is implementing schemes within Maidstone Borough funded by external corporations whilst still meeting Kent County Council’s strategic targets with the road network.
THERE ARE NO PROJECTS OF THIS TYPE TO REPORT
Externally Funded Schemes – |
|||
Road Name |
Description of Works |
Source of Funding |
Current Status |
|
|
|
|
Appendix E – Developer Funded Works
Developer Funded Works (Section 278 Agreement Works) Maidstone Borough - Contact Officer Sarah Parris |
|||||
Scheme Name |
File Ref. |
Officer |
Parish |
Description of Works |
Current Status |
St Michaels Close and Beddow Way |
MA003459 |
AA |
Aylesford |
Reinstatement of old access and new access on St Michaels and Beddow Way |
Technical Approval Given |
Bell Farm, North Street |
MA003098 |
SN |
Barming |
New accesses to split sites, shared surface, and new crossing point |
Highway works completed. Stage 3 Safety Audit Awaited. |
Barty Farm, Roundwell, |
MA003278 |
AD |
Bearsted |
New Bellmouth and Lining works |
Defects issued |
Cross Keys |
MA003100 |
JH |
Bearsted |
New access, crossing point and parking area |
Works Completed |
Church Road/Deringwood Drive/Willington Street/Spot Lane |
MA003426/ MA003429/ MA003430/ MA003431/MA003436/ MA003437 |
SP |
Bearsted/ |
Church Road/Deringwood Drive/Willington Street/Spot Lane |
MA003426/ MA003429/ MA003430/ MA003431/MA003436/ MA003437 |
Bicknor Road |
MA003256 |
AP |
Bicknor |
Formation of hard surfaced passing places |
Awaiting technical approval |
Loddington Farm, Heath Road, |
MA003464 |
CV |
Boughton |
New Access to Farm Shop |
Stat Diversion required prior to completion of works |
Lyewood Farm, Green Lane |
MA3247 MA3248 |
AP |
Boughton Monchelsea |
New housing development and access |
Awaiting completion of remedial works |
Forstal Lane |
MA003141 |
SP |
Coxheath |
Widening of road and new footpath with access to new development |
Snagging works to be conducted and soon to be adopted. |
The Street Detling |
MA003457 |
CV |
Detling |
New access and move bus stop |
Submission under review |
Bell Farm, Ashford Road |
MA003094 |
CV |
Harrietsham |
Realignment of Church Road to form new access onto A20. New footway along A20 |
Due for adoption |
Harrietsham Primary School |
MA3388 |
CV |
Harrietsham |
New access to car park, extend traffic calmed area |
Works in maintenance |
Oak Lane and Wheeler Street |
MA003048 |
CV |
Headcorn |
New footway plus junction improvements |
Works at end of maintenance, final remedials due |
Grigg Lane, Lenham Road,
|
MA003050 |
CV |
Headcorn |
Access onto Grigg Lane and Lenham Road. Footway on Grigg Lane |
Works near end of maintenance. Final remedials due. |
Lenham Road (South side) |
MA003057 |
CV |
Headcorn |
New access road works and footway. |
Footway and speed gateway works done, remedials to do. |
Lenham Road (North side) |
MA003062 |
CV |
Headcorn |
New Footway and site access |
Adopted |
Mill Bank Headcorn |
MA3119 |
CV |
Headcorn |
New bus stops and extend 30mph zone |
Works mostly completed before resurfacing. Minor works & additional road markings to complete shortly. |
Stonestile Road |
MA003412 |
JH |
Headcorn |
New access to twelve houses |
Works Completed |
Gibbs Farm Grigg Lane & Wheeler Street |
MA3250 |
SAS |
Headcorn |
Access Gibbs Farm development, zebra crossing on Wheeler St |
Works in maintenance. |
Ulcombe Road |
MA003150 |
SP |
Headcorn |
Access to new development |
Snagging complete inspection required prior adoption. |
Woodcut Farm, Ashford Road |
MA003423 |
SP |
Hollingbourne |
Alterations to A20 and access for new development |
Snagging works completed inspection required prior to adoption. |
Genco Office |
MA003433 |
SP |
Hollingbourne |
New Access to Business and carriageway alterations |
Snagging works in discussion. |
Westwood Park, Ham Lane |
MA003305 |
AP |
Lenham |
Main and emergency accesses to new housing dev. |
Works Completed. Maintenance yet to start due to developer inaction |
Old Ashford Road, Adj Groom Way |
MA003356 |
AP |
Lenham |
New access and footway |
Works completed. Reduced speed limit not yet implemented. |
8 Faversham Road |
MA003032 |
CV |
Lenham |
New access |
In maintenance, streetlight to replace |
The Paddocks, Ashford Road (Grove House, Old Ashford Road) |
MA3114 |
CV |
Lenham |
New access, traffic island, speed reduction to 50mph & f/way link to Faversham Road |
Remedials required to soft landscaping prior to adoption |
Headcorn Road Adj Rail bridge |
MA3404 |
CV |
Lenham |
New access road and extend 30mph limit |
Due for adoption |
Old Ham Lane |
MA003448 |
CV |
Lenham |
C/W widening and footway for new development |
Technical review in progress |
Loder Close |
MA3424 |
JH |
Lenham |
New bell mouth access and footway |
Works Completed |
Gleamingwood Drive |
MA003441/MA003440 |
AP |
Lordswood |
New Access and development |
Going through Technical Approval. |
A249, Access, Scammell Lodge Farm |
MA003461 |
AA |
Maidstone |
New access and acceleration lane |
Technical Approval Given |
Bicknor Green, Gore Court Road |
MA003053 |
AD |
Maidstone |
Change of road priorities and widening / upgrading
|
In Maintenance |
St Saviours Road, Maidstone |
MA003136 |
AD |
Maidstone |
Changes to layout for Morrisons Junction |
Agreement signed |
Buffkyn Way / Sutton Road |
MA003218 |
AD |
Maidstone |
Signalisation of the junction |
Approved – not signed |
Springwood Road Maidstone |
MA003438 |
AP |
Maidstone |
Stopping up of existing access and provision of new through footway |
Adopted |
531 Tonbridge Road |
MA003045 |
CV |
Maidstone |
Service layby for new retail unit |
Due for adoption |
Wallis Avenue Phase 3, Parkwood |
MA003085 |
CV |
Maidstone |
Redevelopment of car park & shops opp. Longshaw Rd |
Works in maintenance |
Maidstone East Station |
MA3447 |
CV |
Maidstone |
Footway upgrade (& private parking improvement) |
Works in maintenance |
Somerfield Terrace A20 London Road |
MA003455 |
CV |
Maidstone |
Bus stop improvements |
Awaiting installation of Bus Shelter |
Royal Engineers Rd/Mill Lane |
MA3312 |
JH |
Maidstone |
Access to New Development |
Revised scheme under Technical Review awaiting updated drawings. |
Medway Street |
MA3326 |
JH |
Maidstone |
Subway Flood Protection Works |
Awaiting revised/updated drawings. |
Howard Drive |
MA003303 |
SP |
Maidstone |
Junction works to facilitate Bus Gateway entrance to Croudace site |
Adopted. |
Hermitage Lane, (opp. Maidstone Hospital) |
MA003060 |
SP |
Maidstone |
New Traffic signal junction |
Remedials booked in with developer ready for adoption |
Castle Dene, Maidstone |
MA003352 |
SP |
Maidstone |
New Access and further footway works and repairs.
|
Adopted. |
Perryfield Street |
MA3411 |
SP |
Maidstone |
New footpath/access to new houses |
Adoption due. |
Oakapple Phase 2A, Hermitage Lane |
MA003444 |
SP |
Maidstone |
Development adjoining existing development |
Going through Technical Approval |
Langley Park Farm |
MA003130 |
AD |
Maidstone / Langley |
New Roundabout and associated works for entrance to Countryside Estate |
Works complete |
MAP Depot, Goudhurst Road |
MA003012 |
CV |
Marden |
New bellmouth junction and footway |
Final Remedials due, (mini-SID provided to Parish for monitoring traffic flows) |
The Parsonage, Goudhurst Road |
MA003066 MA003067 |
CV |
Marden |
New access and associated upgrade works |
Final remedials scheduled |
Albion Road, Marden |
MA003132 |
SP |
Marden |
New Access & development |
Awaiting paperwork prior to adoption. |
Fishers Farm (West), Headcorn Road (Bovis) (off-site works) |
MA3037/1 |
AP |
Staplehurst |
Pedestrian crossovers on Headcorn Road/ |
Works completed, remedial works completed, stage 3 road safety audit response required before first certificate issue |
Oliver Road Staplehurst |
MA003019 |
CV |
Staplehurst |
Ped crossing to Marden Road, junction markings and bus boarders |
Documentation to be received prior to adoption |
Hen and Duckhurst Farm, Marden Road |
MA003109 |
CV |
Staplehurst |
New Roundabout for development access |
In Maintenance |
High Street Staplehurst |
MA3446 |
CV |
Staplehurst |
2 x new bus stop upgrades (kerbs and markings) |
Due for adoption |
High Street, Staplehurst |
MA003463 |
CV |
Staplehurst |
Alterations to two accesses |
Going through Technical Approval |
Fishers Farm (East) Headcorn Road (Redrow) |
MA3106 |
SP |
Staplehurst |
Realignment and new access at Headcorn Road/Pile Lane junction |
Works still ongoing and Defects already started.
|
Pristling Lane |
MA3415 |
SP |
Staplehurst |
Widened access & Ditch works |
Awaiting defect completion prior to adoption. |
Chartway Street |
MA003462 |
AA |
Sutton Valence |
New Access |
Technical Approval complete but waiting update on outstanding planning issues. |
Sapphire Kennels Headcorn Road |
MA3407 |
AP |
Sutton Valence |
Access to new development and 40mph extension |
Awaiting remedial works to be implemented. Delayed due to developer inaction |
Valdene Industrial Estate |
MA003054 |
CV |
Sutton Valence |
Upgrade of existing bellmouth and extension to f/w |
At final remedials stage prior to adoption |
The Oaks, Maidstone Road |
MA003078 |
CV |
Sutton Valence |
Upgrade existing Vehicle crossing access to Bellmouth with tactile crossing. |
In maintenance |
Warmlake Nurseries |
MA003443 |
SP |
Sutton Valence |
New access to small development |
Adopted. |
Farleigh Hill Tovil (Opp KCC waste site) |
MA3413 |
AP |
Tovil |
New access opp Burial Ground Ln KCC Recycling centre |
Awaiting completion of legal agreement |
Tovil Green Lane |
MA003095 |
CV |
Tovil |
New Footway and crossing point to side of site |
In maintenance |
Straw Mill Hill |
MA003458 |
CV |
Tovil |
New access to small development |
Initial submission received |
Mount Ave/Blunden Lane |
MA3180 |
CV |
Yalding |
New accesses at site entrance |
Adoption imminent |
Vicarage Road |
MA003121 |
SP/JH |
Yalding |
New access to development and speed restraints on existing Highway |
Under review |
Yalding Business Park, Hampstead Lane |
MA003450 |
JH |
Yalding |
New accesses into business park |
Under review – stopping up order underway. |
Hampstead Lane/Maidstone Road |
MA003456 |
JH |
Yalding |
New right turn lane |
Currently under review – TRO to extend 30mph speed limit underway |
Appendix F – Bridge Works
Bridge Works – Contact Officer Helen Rowe
|
|||
Road Name |
Parish |
Description of Works |
Current Status |
Wat Tyler Way |
Maidstone |
Centenary Viaduct (KCC no. 3935) – Expansion joint replacement |
Starting 20th October 2023 for 10 nights |
Linton Hill, Maidstone |
Marden |
Stile (KCC no. 67) – Expansion joint replacement |
Planned for winter 2023 |
Linton Road, Maidstone |
Loose |
Loose Viaduct (KCC no. 205) – Impact damage to the bridge parapet |
Planned in September or October 2023 (dates are not confirmed yet) |
Appendix G – Traffic Systems
There is a programme of scheduled maintenance to refurbish life expired traffic signal equipment across the county based upon age and fault history. The delivery of these schemes is dependent upon school terms and holiday periods; local residents, businesses and schools will be informed verbally and by a letter drop of the exact dates when known.
Traffic Systems - Contact Officer: Toby Butler |
||
Location |
Description of Works |
Current Status |
A229 Hayle Road / Campbell Road, Maidstone (11-0433) |
Refurbish existing traffic signal-controlled junction |
Not yet programmed |
Appendix H - Combined Members Grant programme update
Member Highway Fund programme update for the Maidstone Borough
The following schemes are those, which have been approved for funding by both the relevant Member and by Haroona Chughtai, Director of Highways and Transportation. The list only includes schemes, which are
· in design
· at consultation stage
· about to be programmed
· recently completed on site.
The list is up to date as of 28.09.23.
The details given below are for highway projects only. This report does not detail
· contributions Members have made to other groups such as parish councils.
· highway studies
· traffic/ non-motorised user surveys funded by Members.
More information on the schemes listed below can be found by contacting the Highway Manager for the Maidstone Borough, Susan Laporte.
THERE ARE NO PROJECTS OF THIS TYPE TO REPORT
[ ]
Details of Scheme |
Status |
|
|
[ ]
Details of Scheme |
Status |
|
|
Legal Implications
1.1.1 Not applicable.
1.2 Financial and Value for Money Considerations
1.2.1 Not applicable.
1.3 Risk Assessment
1.3.1 Not applicable.
Contacts: Richard Emmett / Susan Laporte 03000 418181