Enc. 1 for Infrastructure Delivery Plan Update

INFRASTRUCTURE DELIVERY PLAN – July 2012

Category

Scheme

Where?

Location

Cost

Who?

Lead and delivery partners

How?

Delivery Mechanisms

When?

Delivery Phasing

Notes

PHYSICAL INFRASTRUCTURE

 

 

 

 

 

 

Built Environment

 

Public realm improvements

Week Street

Town Centre

£2,000,000

MBC

CIL

 

North end from Fremlin Walk to Maidstone East. Possible S.106 opportunities when development comes forward at Maidstone East and/or Royal Mail Sorting Office

Public realm improvements

High Street Regeneration

Stage 2

Town Centre

£2,000,000

MBC

Capital spending programme

2013-2016

High Street regeneration scheme phase 2 – from Pudding Lane to Fairmeadow

Public realm improvements

Improved linkages to riverside

Town Centre

£1,500,000

MBC

CIL

 

Primarily Earl St – to link with proposed new cycle/pedestrian footbridge from Earl Street to Street Peter but also relevant to St Faith’s Street and lower High Street/Fairmeadow – where there is a need to improve the safety and attractiveness of the existing routes from the town centre to the riverside

 

Total Estimated Cost

£5,500,000

 

 

 

All costs are estimates – schemes subject to change depending on priorities for town centre regeneration

Transport

 

Walking

Pedestrian mobility/access Improvements

Town centre

 

MBC/KCC

 

 

Public realm improvements (see above) and upgrading of any junctions (see below) will have a positive impact on pedestrian mobility/access.

Walking

 

 

 

 

Access/safety  improvements to/from high level bridge and riverside towpath

Town centre

£0,200,000

MBC/KCC

CIL (possible S.106 if Powerhub site on St Peter’s Street is developed)

2016-2021

Improved linkage (public realm) from Maidstone East Train Station to Maidstone Barracks Train Station – also includes a new section of riverside towpath and improvements to existing riverside towpath from Scotney Garden to Whatman Park.

£300k has already been secured through S.106 from development at Scotney Gardens

Walking/Cycling

Shared use pedestrian/cycle footbridge linking Earl Street to St Peter’s Street

Town Centre

£2,000,000

MBC/KCC

CIL

 

Minimum cost estimate – depends on priorities in the town centre. This scheme is highlighted in Town Centre Study, 2010

Walking/Cycling

Improving street signage and pedestrian way finding, removing footway clutter

Town centre/RSC

£0,200,000

KCC

CIL

Ongoing

To improve street legibility, safety and appearance

Cycling

Cycle network improvements

Town centre/ urban area

£0,750,000

KCC

LTP/CIL

2013-2016

2016-2021

 

Based on Cycle Strategy, which is part of the Integrated Transport Strategy

M20 J7 Improvements

 

Several schemes

(Strategic Site Allocation)

Urban area

£3,300,000 (max estimate)

HA

CIL/S.106

2016-2021

·         Capacity improvements and provision of pedestrian crossing facilities at Bearsted roundabout (Bearsted Road/A249 Sittingbourne Road) and at New Cut roundabout (Bearsted Road/New Cut Road) - £0,700,000

·         Upgrading of Bearsted Road between Bearsted roundabout and New Cut roundabout to dual carriageway - £1,600,000

·         Traffic signalisation of the M20 J7 roundabout - £0,200,000

·         Provision of a subsidised shuttle bus to operate between the site and the town centre, via New Cut Road and Ashford Road - £TBC

·         Bus priority measures on New Cut Road - £0,800,000

·         Traffic signal priority measures at the junction of New Cut Road and the A20 Ashford Road – included in bus priority cost estimate above.

M20 J8 Improvements

Several schemes

(Strategic Site Allocation)

Rural area

£3,500,000

HA

CIL

2016-2021

·         Ashford Rd/Penford Hill Jcn improvements – £0,560,000

·         Ashford Rd/Eyhorne St Jcn Improvements - £0,690,000

·         Ashford Rd/M20 link Rd roundabout improvements - £0,182,000

·         Ashford Rd/Willington St Jcn – £0,100,000

·         M20 Jcn 8 westbound slip lane and merge improvements - £2,000,000

Public Transport

Romney Place bus lane

 

Town centre

£0,060,000

KCC

LTP/CIL

2012-2016

Scheme design has been drawn up and costed

Public Transport

 

A229 (south) A274 construction of dedicated bus lane – linked to strategic site in south east

Urban area – south east

£7,300,000

KCC

CIL/S.106/KCC

2016-2021

From Willington Street – Wheatsheaf Junction adjacent to existing carriageway

Highways Improvements

Bridge Gyratory Bypass

Town centre

£6,000,000

KCC

CIL/S.106/KCC capital spend

2016-2021

To improve traffic congestion in the town centre. The majority of funding for this scheme is expected to come from KCC block funding. See Integrated Transport Strategy

Highways Improvements

 

Several Schemes

(Strategic Site Allocation)

South east

£3,590,000

KCC

CIL/S.106/HA/KCC

2016-2021

·         Improvements to capacity at junction Willington Street/Sutton Road - £0,820,000

·         New road between Sutton Road and Gore Court Road. Main link into Land North of Sutton Road and Bicknor Wood – Strategic Sites - £1,000,000

·         Widening of Gore Court Road between Bicknor Wood and Sutton Road - £1,000,000

·         New footway (north side Sutton Road) - £0,220,000

·         New roundabout on Sutton Road  to provide access to Langley Park strategic site - £0,550,000

Highways Improvements

 

Several Schemes

(Strategic Site Allocation)

North west

£8,594,000 (maximum estimate)

KCC

CIL/S.106/S.278/ T &M Borough Council/HA/KCC

2016-2021

·         M20 Junction 5 signalisation - £0,700,000

·         Additional lane Coldharbour roundabout - £2,6000,000

·         Capacity improvements Hermitage Lane/London Road Junction - £0,800,000

·         20/20 roundabout capacity improvements - £1,300,000

·         One-way gyratory scheme - Fountain Lane/Tonbridge Road/Queens Road - Opening access to St Andrews Road and re-organisation of associated junctions to mitigate existing and proposed impacts on traffic flow and safety - £1,100,000

·         Footway improvements to Hermitage Lane (western side). Possible S.278. - £0,200,000

·         Pedestrian crossing near Barming Rail Station - To mitigate against increased pedestrian flows and improve safe access to rail station - £0,094,000

·         Increase capacity of Barming Rail Station car park by 200 spaces - £1,800,000

Transport Infrastructure Improvements

Numerous schemes to be determined

RSCs

 

 

£0,500,000 broken down to £0,100,000 for each RSC as an initial guide

 

KCC

S.278/S.106/CIL

2016-2021

Subject to detailed consultation between Parish Council’s, MBC and KCC -

Could include :

·         traffic calming

·         upgrading traffic signals,

·         car parking,

·         pedestrian and cycle links,

·         interchange improvements Staplehurst

Possible use of S.278 agreements, where developer provides infrastructure to KHS specification

 

Transport (urban)                                         

£35,494,000

 

 

 

 

 

Transport (RSC)          

£0,500,000

 

 

 

 

 

Total Estimated Cost                                                                                              

 

£35,994,000

 

 

 

 

Utilities

 

Sewerage

Engineering solution to increase capacity of sewer to accommodate growth

urban area and RSC

TBC

Southern Water

 

2016-2021

Urban Area

Significant off-site sewerage infrastructure will be required to serve the strategic locations in the Maidstone Urban Area. This is the case regardless of which sites are selected. The need for this infrastructure should be identified in policy terms in the Core Strategy

 

RSCs

New and/or improved local sewerage infrastructure may also be required to serve the sites in the RSCs. However, this does not preclude any of the sites from future development. Southern Water will assess the sites when the site options are refined, the scale of development at each site is defined, and the sites are published in a draft development plan document. If capacity is insufficient, development of the site can still go ahead provided it connects to the sewerage system at the nearest point of adequate capacity. Southern Water will look to the planning authority to formulate appropriate planning policies that will ensure that this happens

Wastewater Treatment

Increase capacity at Aylesford WwTW, and possibly Headcorn and Harrietsham

Urban area and RSCs

£0 – costs are covered by Southern Water

Southern Water

 

 

Delivery can be planned through the Ofwat Periodic Review process, once the Core Strategy is adopted.

Broadband/ ICT

 

TBC

Urban area and RSCs

£TBC

 

 

 

Discussions held with IT. Possibility of focusing on 6 specific areas for broadband improvements.

 

Utilities  (urban)            

£

 

 

 

 

 

Utilities (RSC)                

£

 

 

 

 

 

Total Estimated Cost                                                         

£

 

 

 

 

KCC Waste

 

Household waste

Additional recycling centre required (approx 0.8ha)

North west of urban area

£0 – costs are covered by KCC

KCC

 

2016-2021

To serve MBC administrative area – exact location to be determined. KCC are assessing locations – not expected to affect north west strategic sites. No cost to MBC

 

Total Estimated Cost

£0

 

 

 

 

SOCIAL & COMMUNITY INFRASTRUCTURE

 

 

 

 

 

Primary Education

 

New School

 

 

 

1 FE on a minimum 2.05ha/2FE site

North west urban area

£4,200,000

KCC

S.106

2016-2021

Appropriate site needs to be identified and allocated

New School

2FE on a minimum 2.05ha/2FE site

South east urban area

£8,400,000

KCC

S.106

2016-2021

Appropriate site needs to be identified and allocated

Expansion of Existing Schools

Additional pupil capacity

Maidstone (east)

£0,392,000

KCC

CIL

2016-2021

Subject to a satisfactory technical feasibility study

Expansion of Existing Schools

Additional pupil capacity

Outside urban area and RSCs

£0,442,000

KCC

CIL

2016-2021

Hollingbourne = £0,336,910

Leeds = £0,046,123

Sutton Valence/Langley = £0,058,917

Expansion of Existing Schools

Additional pupil capacity

RSC + (Yalding)

£1,900,000

KCC

S.106

2016-2021

Breakdown of figures TBC

 

Primary Education (urban)                                                        

£13,434,000

 

 

 

 

 

Primary Education (RSC)                                                                                                                     

£1,900,000

 

 

 

 

 

Total Estimated Cost                                                       

£15,334,000

 

 

 

This is based on an initial run of KCCs Infrastructure Investment Finance Model (IIFM). Based on recent discussions with KCC,  another run of the model is taking place using different inputs and the figures are expected to be revised downwards

Secondary Education

 

Expansion

Additional pupil capacity

Urban and rural area

£8,200,000

KCC

CIL

2016-2021

Subject to a satisfactory technical feasibility study

 

Total Estimated Cost (District)                                 

£8,200,000

 

 

 

This is based on an initial run of KCCs Infrastructure Investment Finance Model (IIFM). Based on recent discussions with KCC,  another run of the model is taking place using different inputs and the figures are expected to be revised downwards. Total cost will include RSCs

Higher & Further Education

 

Mid Kent College (Oakwood Campus)

 

 

 

£0

 

 

 

Refurbishment of campus ongoing – paid for by Mid Kent College

Maidstone Studios

 

 

£0

 

 

 

UCA want to expand courses at Maidstone Studios – no decision made as yet

 

Total Estimated Cost

£0

 

 

 

 

Health

 

Primary Care Trust/Clinical Commissioning Groups

 

 

 

 

 

Discussions are ongoing

 

Total Estimated Cost

£TBC

 

 

 

 

Libraries

 

Libraries

Strategic District Provision Library Stock

District

£0,608,000

CIL

 

2016-2021

2021-2021

 

Libraries

 

Capital and revenue

District

£0,765,000

CIL

 

2016-2021

2021-2026

 

Library and History Centre

Capital and revenue

 

£0,696,000

CIL

 

2016-2021

2021-2026

 

 

Total Estimated Cost

£2,070,000

 

 

 

This is based on an initial run of KCCs Infrastructure Investment Finance Model (IIFM). Based on recent discussions with KCC, another run of the model is taking place using different inputs and the figures are expected to be revised downwards.

Figures include RSCs

Community Learning

 

 

 

 

 

 

Main Centres

Additional community learning resource requirements to maintain standard levels (capital and revenue)

District

£0,271,000

CIL

 

2013-2026

Phased figures have been supplied. Total KCC calculation included capital and revenue beyond 2026 – this has not been included in total

Outreach Centres

Additional community learning resource requirements to maintain standard levels (capital and revenue)

District

£0,174,000

CIL

 

2013-2026

Phased figures have been supplied. Total KCC calculation included capital and revenue beyond 2026 – this has not been included in total

Youth

 

Additional youth service resource required to maintain service standard

District

£0,601,000

CIL

 

2013-2026

Phased figures have been supplied. Total KCC calculation included capital and revenue beyond 2026 – this has not been included in total

Indoor Sport

Improve the offer, accessibility and capacity at existing facilities

Urban area

£3,000,000 (estimate)

CIL

 

 

Potential to enter a partnership with Mid Kent College to provide indoor sport facilities at the Oakwood Campus – St Augustine’s

 

Total Estimated Cost

£4,046,000

 

 

 

This is based on an initial run of KCCs Infrastructure Investment Finance Model (IIFM). Based on recent discussions with KCC, another run of the model is taking place using different inputs and the figures are expected to be revised downwards.

Note – the modelling does not include Indoor Sport.

Figures Include RSCs

Kent Adult Social Services

 

Changing Places Facilities

For KASS clients

Urban area Maidstone Leisure Centre and Library and History centre

£0,008,000

KCC

CIL

2017-2021

 

Adult health and social care

Local hub incorporating dementia care

Urban area

£0,177,000

KCC

CIL

2017-2021

 

Co-location with health

 

Urban area

£0,059,000

 

CIL

2017-2021

 

Mid-Kent health and social care

Vocational hub for learning disability with changing facility

Urban area (Mid Kent College)

£0,219,000

KCC

CIL

2022-2026

 

Assistive Technology

 

 

£0,042,000

 

 

2013-2026

 

Adult Health and Social Care

Rural Local Hub with changing place facility

Rural

£0,219,000

KCC

CIL

2022-2026

 

 

 

Kent Adult Social Services (urban area)                                                                   

£0,505,000

 

 

 

 

 

Kent Adult Social Service (RSC)                                                                                 

£0,219,000

 

 

 

 

 

Total Estimated Cost                                         

£0,724,000

 

 

 

This is based on an initial run of KCCs Infrastructure Investment Finance Model (IIFM). Based on recent discussions with KCC,  another run of the model is taking place using different inputs and the figures are expected to be revised downwards

Kent Police

 

New accommodation

9m2 custody accommodation

Town centre or borough- wide

£0,043,000

Kent Police

CIL

TBC

 

Additional staff

19 police officers and 16 staff (PCSO’s etc)

Borough-wide

£1,200,000

Kent Police

CIL

TBC

 

 

Start up costs for above

Borough-wide

£0,206,000

Kent Police

CIL

TBC

 

 

Total Estimated Cost

£1,449,000

 

 

 

 

GREEN INFRASTRUCTURE

Green Infrastructure

Several Schemes

Town Centre

£0,450,500

MBC

S.106/CIL

 

TBC

·         Amenity green space (0.7ha)

·         Parks and gardens (2.2ha)

·         Outdoor sports (1.3ha) - with changing facilities

Green Infrastructure

Several Schemes

South of central urban area

£0,296,300

MBC

S.106/CIL

TBC

·         Amenity green space (0.6ha)

·         Parks and Gardens (1.9ha)

Green Infrastructure

Several Schemes

North west of urban area

£0,568,000

MBC

S.106/CIL

 

TBC

·         Amenity green space (1.1ha)

·         Natural/semi-natural (1.6ha)

·         Parks and gardens (3.6ha)

Green Infrastructure

Several schemes

North west of urban area

£1,120,000

MBC

S.106/CIL

 

TBC

·         Outdoor sports (3.4ha) - Additional 1 storey sports pavilion (changing facilities) also required

·         Provision for children & young people (0.3ha)

Green Infrastructure

Several schemes

South east of urban area

£1,980,000

MBC

S.106/CIL

 

 

TBC

·         Amenity green space (1.7ha)

·         Natural/semi-natural (1.2ha)

·         Parks and gardens (5.5ha)

·         Outdoor sports (3.4ha) - Additional 1 storey sports pavilion (changing facilities) also required

·         Provision for children & young people (0.3ha)

Green Infrastructure

Several schemes

South of urban area

£0,349,100

MBC

S.106/CIL

 

·         Amenity green space (0.6ha)

·         Outdoor sports (1.2ha) - Without changing facilities

·         Parks and Gardens (1.5ha)

Green Infrastructure

Several schemes

Harrietsham

£0,407,000

MBC

S.106/CIL

 

·         Amenity green space (0.6ha)

·         Natural/semi-natural (1.6ha)

·         Outdoor sports (2.1ha) – without changing facilities

Green Infrastructure

Several schemes

Headcorn

£0,268,700

MBC

S.106/CIL

 

·         Natural/semi-natural (1.1ha)

·         Outdoor sports (1.5ha)

Green Infrastructure

Several schemes

Marden

£0,409,000

MBC

S.106/CIL

 

·         Amenity green space (0.6ha)

·         Natural/semi-natural (1.6ha)

·         Outdoor Sports (2.1ha) – without changing facilities

Green Infrastructure

Several schemes

Staplehurst

£0,253,100

MBC

S.106/CIL

 

·         Natural/semi-natural (1ha)

·         Outdoor Sports (1.4ha) – without changing facilities

 

Green Infrastructure (urban)                                                    

£4,763,900

 

 

 

 

 

Green Infrastructure (RSC)                                                        

£1,337,800

 

 

 

 

 

Total cost estimate                                                       

£6,101,700

 

 

 

Difficult to determine phasing for all green infrastructure schemes above. However, all schemes are likely to fall within 2016-2021 and 2021-2026 periods

 

 

 

 

 

IDP Total Estimated Costs

 

£79,418,700

 

 

 

Difficult to determine exact RSC figure as RSC investment is tied into borough wide investment in some areas – approx £8,500,000