To: Maidstone Joint Transportation Board
By: KCC Highways and Transportation
Date: 22nd January 2014
Subject: Highway Works Programme 2013/14
Classification: Information Only
Summary: This report updates Members on the identified schemes approved for construction in 2012/13
1. Introduction
This report provides an update and summarises schemes that have been programmed for delivery in 2013/14
Footway and Carriageway Improvement Schemes – see Appendix A
Drainage Repairs & Improvements – see Appendix B
Street Lighting – see Appendix C
Conclusion
- This report is for Members information.
Contact Officers:
The following contact officers can be contacted on 0845 8247 800
Carol Valentine Highway Manager (West)
Richard Emmett Maidstone District Manager
John Farmer Major Capital Project Manager
Mary Gillett Resurfacing Manager
Sue Kinsella Street Lighting Manager
Katie Lewis Drainage Manager
Appendix A – Footway and Carriageway Improvement Schemes
These schemes are weather dependent operations; in the event that it is not possible for them to be carried out on the planned date a new date will be arranged and the residents informed by a letter drop to their homes.
Surface Treatments - Contact Officer Neil Tree |
|||
Micro Asphalt Schemes |
|||
Road Name |
Parish |
Extent of Works |
Current Status |
Buckland Road |
Maidstone |
From Buckland Hill to the school entrance |
Completed |
Machine Resurfacing – Contact Officer Russell Boorman
|
|||
Road Name |
Parish |
Extent of Works |
Current Status |
Tonbridge Road |
Barming |
At its junction with Queens Road |
Completed |
A26 Tonbridge Road |
Barming |
At its junction with Fountain Lane |
Programmed to start Spring 2014 |
Detling Hill |
Detling |
At its junction with Scragged Oak Road |
Completed |
M20 J7 Roundabout |
Boxley |
A249 Detling Hill |
Completed
|
Footway Improvement - Contact Officer Wendy Boustead
|
|||
Road Name |
Parish |
Extent and Description of Works |
Current Status |
Gabriels Hill |
Maidstone |
Both sides from the junction with High Street to the junction with Palace Avenue – relaying blockwork on a concrete base and replacing where necessary |
This is still in the design stages and yet to be programmed |
Upper Fant Road |
Maidstone |
From its junction with Hackney Road to its junction with Bower Lane – Replacement of asphalt surface and kerbs where necessary |
Completed |
Charles Street |
Maidstone |
Whole length and including outside numbers 1 to 7 Reginald Road. Replacement of asphalt surface and kerbing where required. |
Completed |
Glebe Lane |
Barming |
From its junction with Tonbridge Road to its junction with Farleigh Lane - Replacement of asphalt surface and kerbing where required. |
Completed |
Eyhorne Street |
Hollingbourne |
From Musket Lane and Hasteds - Replacement of asphalt surface and kerbing where required. This scheme is still in the design stages |
Due to the need for a closure to carry out these works we have had to postpone this due to another road closure in the area. |
Appendix B – Drainage Repairs & Improvements
Drainage Repairs & Improvements - Contact Officer Katie Lewis
|
|||
Road Name |
Parish |
Description of Works |
Current Status |
Smith’s Hill |
West Farleigh |
Installation of new gullies and kerbs |
Completed |
Tonbridge Road |
Teston |
Addition of deepbore to existing soakaway |
Completed |
Bonnington Road |
Vinters Park |
Installation of new Soakaway and gullies |
Completed |
Appendix C – Street Lighting
Street Lighting Column/Lamp Replacement – Contact Officer Al Tanriverdi
|
|||
Road Name |
Column Ref |
Location |
Status |
M20 |
KFRE001 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE002 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE003 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE004 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE005 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE006 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE007 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE008 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE009 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE010 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE011 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE012 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE013 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE014 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE015 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE016 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE017 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE018 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
M20 |
KFRE019 |
Junction 7, junction with A249 roundabout |
w/c 27 Jan 2014 |
Works programmed for week commencing 27 January 2014 subject to weather conditions and Highway Agency approving traffic management on M20 fast lanes
Appendix D – Bridge Works
Bridge Works – Contact Officer Tony Ambrose
|
|||
Road Name |
Parish |
Description of Works |
Current Status |
Chart Hill Road |
Staplehurst |
Bridge refurbishment/repair Road closed 8th – 12th November. |
Completed |
Appendix E – ITS
There is a programme of scheduled maintenance to refurbish life expired traffic signal equipment across the county based upon age and fault history. The delivery of these schemes is dependent upon school terms and holiday periods; local residents, businesses and schools will be informed verbally and by a letter drop of the exact dates when known.
Traffic Systems - Contact Officer: Toby Butler
|
||
Location |
Description of Works |
Current Status |
A20 High Street near Fairmeadow |
Refurbishment of traffic signal controlled crossing. |
Works completed during September 2013 as part of High St improvements. |
1.1 Legal Implications
1.1.1 Not applicable.
1.2 Financial and Value for Money Considerations
1.2.1 Not applicable.
1.3 Risk Assessment
1.3.1 Not applicable.
Contact: Carol Valentine / Richard Emmett 08458 247 800