Maidstone revised Highways Works Programme Maidstone Janurary 2013 Final

To:                  Maidstone Joint Transportation Board

 

By:                   KCC Highways and Transportation

 

Date:                23rd January 2012

 

Subject:            Highway Works Programme 2012/13

 

Classification: Information Only

 

 

Summary: This report updates Members on the identified schemes approved for construction in 2012/13

 

 

1. Introduction

 

This report provides an update and summarises schemes that have been programmed for delivery in 2012/13

 

 

Footway and Carriageway Improvement Schemes – see Appendix A

                         

 

Drainage Repairs & Improvements – see Appendix B

 

 

Street Lighting – see Appendix C

 

 

Conclusion

 

  1. This report is for Members information.

 

 

Contact Officers:

 

The following contact officers can be contacted on 0845 8247 800

 

Carol Valentine                                   Highway Manager (West)

Richard Emmett                                 Maidstone District Manager

Mary Gillett                                         Resurfacing Manager

Katie Lewis                                          Drainage and Flooding Manager

Sue Kinsella                                        Street Lighting Manager

 

 

 

 


Appendix A – Footway and Carriageway Improvement Schemes

 

These schemes are weather dependent operations; in the event that it is not possible for them to be carried out on the planned date a new date will be arranged and the residents informed by a letter drop to their homes.

 

 

Surface Treatments - Contact Officer Neil Tree

 

Micro Asphalt Schemes

Road Name

Parish

Extent of Works

Current Status

Upper Road

Maidstone

From the junction with Lower Road to the junction with Willow Way

Completed

Headcorn Road

Lenham

From Lenham Square via Sandway via Platt's Heath crossroads to the junction with Woodcock Lane, Grafty Green.

Completed

Ulcombe Hill

Ulcombe

From the junction with Lenham Road to the Junction with Lodge Gardens

Programmed to start on 2nd April 2013

Warren street

Lenham

From the Harrow Inn public house to the junction with Payden Street

Programmed to start on 5th April 2013

Streetfield

Ulcombe

From the junction with The Street for its entire length.

Programmed to start on 2nd April 2013

Tollgate Place

Headcorn

From the junction with The Street for its entire length

Programmed to start on 28th March 2013

Hospital Road

Hollingbourne

From the Junction with A20 Ashford Road to the junction with Greenway Court Road

Programmed to start on 6th April 2013

East Street / Sandway Road

Harrietsham

From the junction with A20 to Surface Change approx 200m East of Runham Lane

Completed

Greystones Road

Bearsted

From the junction with Spot lane for the entire length.

Completed

Chuch Hill

Boughton Monchelsea

From the junction with Stilebridge Lane/Butt Green Lane to a point just North of Boughton Place

Completed

Couchmans Green Lane

Staplehurst

From the junction with A229 to the junction with Pile Farm Road

Completed

Marion Crescent

Maidstone

From the junction with Plains Avenue to the junction with Somerset Road

Completed

Grove Road

Maidstone

From the junction with Sutton Rd to the junction with Camp Way

Completed

Betsham Road

Maidstone

From the junction with Woolley Road to outside property No. 110

Completed

Shropshire Terrace

Maidstone

From the Junction with Huntingdon Walk to the junction with Wiltshire Way

Programmed to start on 7th April 2013

 

Surface Dressing Schemes

 

Road Name

Parish

Extent of Works

Current Status

Castle Hill

Thurnham

From the junction with Thurnham Lane to End

Completed

Church Road

Boughton Malherbe

From Sandway crossroads to the property Sandway cottages

Completed

Bedmonton Lane

Wormshill

From approximately 100m above Danes Bottom Place to Yew Tree Farm, Wormshill

Completed

Greenway Forstal

Harrietsham

From the junction with Greenway Court Road to the junction with the A20

Completed

Hubbard's Hill

Lenham

From the junction with A20 to 'The Harrow' Public House.

Completed

Woodcock Lane

Boughton Malherbe

Near the junction with Church Road to the junction with Coldbridge Lane

Completed

Stede Hill

Harrietsham

From property “Northgate Lodge” to the junction with Hogbarn Lane

 Completed

Sandway

Boughton Malherbe

Bowley Lane through Boughton Malherbe including Church Road to the junction with Woodcock Lane , Platt's Heath.

 Completed

Old Mill Road

Leeds

From the junction with the A20 to the Brogden Farmhouse junction.

 Completed

Gossy Hill Road

Frinstead

From the junction at Frinstead Church to the junction with Bottom Pond Road.

Completed

New House Lane

Headcorn

From the junction with Water Lane to the junction with the A274 Biddenden Road.

 Completed

South Street Road

Stockbury

From the junction with Yelsted Lane to the speed limit change west of Harrow Court.

 Completed

Clapper Lane

Staplehurst

From the junction with Lindridge Road to the junction with Marden Road

 Completed

Chuch Hill

Boughton Monchelsea

From the junction with B2163 Heath Road to just North of Boughton Place

 Completed

Redwall Lane

linton

From the junction with the A229 Linton Hill to the junction with Bonflower Lane

 Completed

Teston Lane

West Farleigh

From the River Medway Bridge to the junction with Lower Road

Completed

Battle Lane

Staplehurst

From end of railway bridge approach to the junction with the B2079 Maidstone Road.

 

 

Completed

Lancet Lane

Maidstone

From the A229 Loose Road to the junction with Old Drive

Completed

School Lane

Maidstone

From the junction with Oxford Road to the junction with Willington Street

Completed

Bottom Pond Road

Wormshill

From the Corner by “Copes Farm” (Near church) to the junction at “Well Cottage”

Completed

Husheath Hill

Colliers Green

From the junction with Curtis Green Lane to the junction with Hart Heath Farm Road

Completed

Old Whetsted Road

Paddock Wood

Whole length

Completed

 

Machine Resurfacing – Contact Officer Russell Boorman

 

Road Name

Parish

Extent of Works

Current Status

Loose Road

Maidstone

From the junction with Hearther Drive to The Wheatsheaf Public House

Programmed to start 25/02/13 - 08/03/13

Poplar Grove

Allington

From its junction with the A20 London Rd for the entire length

Programmed to start 10/04/13 - 11/04/13

A20 London Road

Allington

From its junction with Palmer Rd –its junction with Buckland Lane

Programmed to start 12/04/13 - 15/04/13

Mote Road

Maidstone

At the junction with Mote Road and Romney Place

Completed

Hope Street

Maidstone

From its junction with Sandlings Lane to its junction with Staceys Street (inc. Alexander Street southern section)

To be programmed April 2013

Thornhill Place

Maidstone

From its junction with John Street to its junction with Fisher St.

To be programmed April 2013

Staceys Street

Maidstone

On the approach to the Pedestrian crossing at its junction with Staceys Street

Completed

Egremont Road

Bearsted

The Cul-de-sac section outside school entrance

To be programmed April 2013

Royston Road

Bearsted

From its junction with Spot Lane to its junction with Madginford Road

Programmed to start and complete on 25/03/13

Heath Road Linton

Maidstone

At the junction with Hubbards Lane

Completed

Chart Corner

Boughton Monchelsea

From its junction with Plough Went Rd to its junction with Amber Lane

Programmed to start and complete on the 04/04/13

Plough Wents Road

Boughton Monchelsea

From its junction with York house to its junction with Lested Lane

Programmed to start and complete on the 05/04/13

Station Road Staplehurst

Maidstone

At its junction with Station Approach

Completed

Staplehurst High Street

Maidstone

On the approaches to the Pelican crossing

Completed

Heath Road Boughton Monchelsea

Maidstone

Outside property called Dean Orchard

Completed

Heath Road

Langley

From its junction with Horseshoes to its junction with Heath Lane

To be programmed for April 2013

Smiths Hill

East Farleigh

Whole Length

Completed

Aspian Drive

Coxheath

From the junction with Park Way for the entire length

To be programmed for April 2013

Hampstead Lane Yalding

Maidstone

On the approach to the Railway crossing East of Allington Lock

Completed

Loose Road

Maidstone

At its junction with Lancet Lane

Completed

Lower Street Leeds

Maidstone

At its junction with Wykeham Grove

Completed

Penfold Hill Leeds

Maidstone

On the approach to Bridge over the River Len

Completed

 

Footway Improvement - Contact Officer Wendy Boustead

 

Road Name

Parish

Extent and Description of Works

Current Status

High Street

Headcorn

From outside of the war memorial to outside No 2 and North Street the section outside of the churchyard – relaying existing blockwork and replacing where necessary

Completed

Gabriels Hill

Maidstone

Both sides from the junction with High Street to the junction with Palace Avenue – relaying blockwork on a concrete base and  replacing where necessary

Programmed to start on 25th February 2013

The Street

Bredhurst

Three sections of footway on the eastern side.  Area 1 – outside of the school.  Area 2 – from opposite the junction of Forge Lane to opposite Pickwick Motors.  Area 3 – footpath to rear of grass verge opposite Stockings Meadow.  Replacing tarmac surface on all sections.

Currently on site due to complete on 1st February 2013

Poyntell Road

Staplehurst

Whole length – replacing tarmac surface

Completed

Slaney Road

Staplehurst

Whole length – replacing tarmac surface

Completed

Charlton Lane

West Farleigh

Eastern side of the footway from near to the property Sunhyl to the end of the footway south of the property Elmscroft – replacing tarmac and kerbs where necessary

Completed

Aspian Drive

Coxheath

Eastern footway from opposite 28 to opposite 19 – replacing concrete with tarmac surface

Programmed to start on 25th February 2013

Lower Road

West Farleigh

Western footway for the whole length – replacing tarmac surface

Programmed to start on 11th February 2013

Fordcombe Close

Maidstone

Whole length – replacing tarmac surface

Completed

Hartley Close

Maidstone

Whole length – replacing tarmac surface

Completed

Burgess Hall Drive

Maidstone

Whole length – replacing tarmac surface

Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Appendix B – Drainage Repairs & Improvements

 

Drainage Repairs & Improvements - Contact Officer Emma Philpott

 

Road Name

Parish

Description of Works

Current Status

Babylon Lane.

Sutton Valence

Road Closure for 8 days to install drainage o/s property “Kenmal” to alleviate localised flooding

Programmed to start on 4th February 2013

Kenward Road

Yalding

Road Closure for 3 days for ditching works and carriageway patching

Programmed to start on 18th January 2013

 

 

 

Appendix C – Street Lighting

 

 

Lamp Replacement Scheme - The columns below currently have orange lights, these will be replaced with much more efficient white lights

 

 

Street Lighting Lamp Replacement  – Contact Officer  Al Tanriverdi

 

Road Name

Column Ref

Location

Status

Anglesey Avenue

KAAY001

J/W LOOSE ROAD

March 2013

Anglesey Avenue

KAAY002

O/S 1C

March 2013

Anglesey Avenue

KAAY003

O/S 6

March 2013

Anglesey Avenue

KAAY004

O/S 12/14

March 2013

Anglesey Avenue

KAAY005

O/S 20

March 2013

Anglesey Avenue

KAAY006

OPP 7

March 2013

Anglesey Avenue

KAAY007

O/S 13 LHS

March 2013

Anglesey Avenue

KAAY008

O/S 30

March 2013

Anglesey Avenue

KAAY009

O/S 23

March 2013

Anglesey Avenue

KAAY010

O/S 50

March 2013

Anglesey Avenue

KAAY011

S/O 72 IONA ROAD

March 2013

Anglesey Avenue

KAAY012

O/S 58

March 2013

Anglesey Avenue

KAAY013

O/S 64

March 2013

Anglesey Avenue

KAAY014

O/S 43/45

March 2013

Anglesey Avenue

KAAY015

O/S 51

March 2013

Anglesey Avenue

KAAY016

O/S 66/68

March 2013

Anglesey Avenue

KAAY017

O/S 72

March 2013

Anglesey Avenue

KAAY018

OPP 76/78

March 2013

Anglesey Avenue

KAAY019

O/S 82

March 2013

Anglesey Avenue

KAAY020

S/O 26 LANCET LANE

March 2013

Cranborne Avenue

KCGL001

OPP 64

March 2013

Cranborne Avenue

KCGL002

O/S 50A/52

March 2013

Cranborne Avenue

KCGL003

O/S 46/48

March 2013

Cranborne Avenue

KCGL004

O/S 45/47

March 2013

Cranborne Avenue

KCGL005

O/S 32A

March 2013

Cranborne Avenue

KCGL006

O/S 33

March 2013

Cranborne Avenue

KCGL007

O/S 28

March 2013

Cranborne Avenue

KCGL008

O/S 22

March 2013

Cranborne Avenue

KCGL009

O/S 15

March 2013

Cranborne Avenue

KCGL010

O/S 10

March 2013

Cranborne Avenue

KCGL011

O/S 5

March 2013

Cranborne Avenue

KCGL012

O/S 8 LHS

March 2013

Cranborne Avenue

KCGL013

OPP 4

March 2013

Cranborne Avenue

KCGL014

O/S 2A/2B

March 2013

Cranborne Avenue

KCGL015

S/O 247 LOOOSE ROAD

March 2013

Lismore Close

KLBT001

O/S 3

March 2013

Ringwood Road

KRAZ001

O/S 8 LYNDHURST ROAD

March 2013

Ringwood Road

KRAZ002

O/S 35/37

March 2013

Ringwood Road

KRAZ003

O/S 29

March 2013

Ringwood Road

KRAZ004

O/S 21/23

March 2013

Ringwood Road

KRAZ005

O/S 11

March 2013

Ringwood Road

KRAZ006

O/S 2/4

 

March 2013

Sheppey Road

KSBG001

O/S 7

March 2013

Sheppey Road

KSBG002

O/S 14

March 2013

Sheppey Road

KSBG003

O/S 21

March 2013

Sheppey Road

KSBG004

O/S 25

March 2013

Sheppey Road

KSBG005

O/S 33

March 2013

Sheppey Road

KSBG006

O/S 34/36

March 2013

Sheppey Road

KSBG007

O/S 49

March 2013

Sheppey Road

KSBG008

O/S 63

March 2013

Sheppey Road

KSBG009

O/S 52

March 2013

Sheppey Road

KSBG010

O/S 83

March 2013

Sheppey Road

KSBG011

O/S 91

March 2013

Arran Road

KABE001

O/S 4

March 2013

Arran Road

KABE002

O/S 10

March 2013

Arran Road

KABE003

O/S 18

March 2013

Farne Close

KFAM001

O/S 2

March 2013

Farne Close

KFAM002

O/S 3/4

March 2013

Marion Crescent

KMBK001

O/S 1a

March 2013

Marion Crescent

KMBK002

O/S 10/12

March 2013

Marion Crescent

KMBK003

O/S 7/5

March 2013

Marion Crescent

KMBK004

O/S 30/32

March 2013

Marion Crescent

KMBK005

O/S 25/27

March 2013

Marion Crescent

KMBK006

O/S 35

March 2013

Marion Crescent

KMBK007

O/S 54

March 2013

Marion Crescent

KMBK008

OPP 56/58

March 2013

Marion Crescent

KMBK009

O/S 64

March 2013

Marion Crescent

KMBK010

O/S 72

March 2013

Marion Crescent

KMBK011

O/S 80

March 2013

Marion Crescent

KMBK012

O/S 86

March 2013

Marion Crescent

KMBK013

O/S 96

March 2013

Marion Crescent

KMBK014

O/S 81

March 2013

Marion Crescent

KMBK015

O/S 110/110a

March 2013

Marion Crescent

KMBK016

O/S 93

March 2013

Marion Crescent

KMBK201

1st IN FP TO SUTTON RD

March 2013

Marion Crescent

KMBK202

2nd IN FP TO SUTTON RD

March 2013

Rushmead Drive

KRCB001

J/W LOOSE ROAD

March 2013

Rushmead Drive

KRCB002

O/S 2

March 2013

Rushmead Drive

KRCB003

O/S 5

March 2013

Rushmead Drive

KRCB004

OPP ADJ 6

March 2013

Rushmead Drive

KRCB005

O/S 8/9

March 2013

Rushmead Drive

KRCB006

O/S 13

March 2013

Skye Close

KSCD001

O/S 5

March 2013

Brockenhurst Avenue

KBFO001

O/S 8

March 2013

Brockenhurst Avenue

KBFO002

O/S 1/3

March 2013

Brockenhurst Avenue

KBFO003

O/S 28/30

March 2013

Iona Road

KIAD001

S/O 58 ANGLESEY AVENUE

March 2013

Iona Road

KIAD002

O/S 6

March 2013

Iona Road

KIAD003

O/S 13

March 2013

Old Drive

KOAJ001

O/S LOOSE COURT FARM

March 2013

Old Drive

KOAJ002

OPP 2

March 2013

Old Drive

KOAJ003

O/S 6

March 2013

Rushmead Drive

KRCB001

J/W LOOSE ROAD

March 2013

Rushmead Drive

KRCB002

O/S 2

March 2013

Rushmead Drive

KRCB003

O/S 5

March 2013

Rushmead Drive

KRCB004

OPP ADJ 6

March 2013

Rushmead Drive

KRCB005

O/S 8/9

March 2013

Rushmead Drive

KRCB006

O/S 13

March 2013

Staffa Road

KSEH001

ADJ 2

March 2013

Staffa Road

KSEH002

O/S 7

March 2013

Staffa Road

KSEH003

O/S 14/16

March 2013

Lancet Lane

KLAI001

J/W LOOSE ROAD

March 2013

Lancet Lane

KLAI002

O/S 6

March 2013

Lancet Lane

KLAI003

O/S 5

March 2013

Lancet Lane

KLAI004

O/S 7

March 2013

Lancet Lane

KLAI005

O/S 18A/20

March 2013

Lancet Lane

KLAI006

O/S 15

March 2013

Lancet Lane

KLAI007

O/S 28

March 2013

Lancet Lane

KLAI008

O/S 32

March 2013

Lancet Lane

KLAI009

O/S 27/29

March 2013

Lancet Lane

KLAI010

O/S 38

March 2013

Lancet Lane

KLAI011

O/S 37

March 2013

Lancet Lane

KLAI012

O/S 39

March 2013

Porchester Close

KPDM001

O/S 2

March 2013

Porchester Close

KPDM002

OPP 6

March 2013

Porchester Close

KPDM003

OPP 7

March 2013

Porchester Close

KPDM004

O/S 16

March 2013

Porchester Close

KPDM005

ADJ 10

March 2013

Sevington Park

KSBA001

J/W LANCET LANE

March 2013

Sevington Park

KSBA002

ADJ 37

March 2013

Sevington Park

KSBA003

S/O 36

March 2013

Sevington Park

KSBA004

O/S 7/8

March 2013

Sevington Park

KSBA005

O/S 30

March 2013

Sevington Park

KSBA006

S/O 8

March 2013

Sevington Park

KSBA007

S/O 28

March 2013

Sevington Park

KSBA008

O/S 15

March 2013

Sevington Park

KSBA009

O/S 17

March 2013

Sevington Park

KSBA010

O/S 20/21

March 2013

 

 

 

1.1               Legal Implications

1.1.1         Not applicable.

1.2               Financial and Value for Money Considerations

1.2.1         Not applicable.

1.3               Risk Assessment

1.3.1         Not applicable.

Contact: Carol Valentine / Richard Emmett 08458 247 800