To: Maidstone Joint Transportation Board
By: KCC Highways and Transportation
Date: 23rd January 2012
Subject: Highway Works Programme 2012/13
Classification: Information Only
Summary: This report updates Members on the identified schemes approved for construction in 2012/13
1. Introduction
This report provides an update and summarises schemes that have been programmed for delivery in 2012/13
Footway and Carriageway Improvement Schemes – see Appendix A
Drainage Repairs & Improvements – see Appendix B
Street Lighting – see Appendix C
Conclusion
- This report is for Members information.
Contact Officers:
The following contact officers can be contacted on 0845 8247 800
Carol Valentine Highway Manager (West)
Richard Emmett Maidstone District Manager
Mary Gillett Resurfacing Manager
Katie Lewis Drainage and Flooding Manager
Sue Kinsella Street Lighting Manager
Appendix A – Footway and Carriageway Improvement Schemes
These schemes are weather dependent operations; in the event that it is not possible for them to be carried out on the planned date a new date will be arranged and the residents informed by a letter drop to their homes.
Surface Treatments - Contact Officer Neil Tree |
||||
Micro Asphalt Schemes |
||||
Road Name |
Parish |
Extent of Works |
Current Status |
|
Upper Road |
Maidstone |
From the junction with Lower Road to the junction with Willow Way |
Completed |
|
Headcorn Road |
Lenham |
From Lenham Square via Sandway via Platt's Heath crossroads to the junction with Woodcock Lane, Grafty Green. |
Completed |
|
Ulcombe Hill |
Ulcombe |
From the junction with Lenham Road to the Junction with Lodge Gardens |
Programmed to start on 2nd April 2013 |
|
Warren street |
Lenham |
From the Harrow Inn public house to the junction with Payden Street |
Programmed to start on 5th April 2013 |
|
Streetfield |
Ulcombe |
From the junction with The Street for its entire length. |
Programmed to start on 2nd April 2013 |
|
Tollgate Place |
Headcorn |
From the junction with The Street for its entire length |
Programmed to start on 28th March 2013 |
|
Hospital Road |
Hollingbourne |
From the Junction with A20 Ashford Road to the junction with Greenway Court Road |
Programmed to start on 6th April 2013 |
|
East Street / Sandway Road |
Harrietsham |
From the junction with A20 to Surface Change approx 200m East of Runham Lane |
Completed |
|
Greystones Road |
Bearsted |
From the junction with Spot lane for the entire length. |
Completed |
|
Chuch Hill |
Boughton Monchelsea |
From the junction with Stilebridge Lane/Butt Green Lane to a point just North of Boughton Place |
Completed |
|
Couchmans Green Lane |
Staplehurst |
From the junction with A229 to the junction with Pile Farm Road |
Completed |
|
Marion Crescent |
Maidstone |
From the junction with Plains Avenue to the junction with Somerset Road |
Completed |
|
Grove Road |
Maidstone |
From the junction with Sutton Rd to the junction with Camp Way |
Completed |
|
Betsham Road |
Maidstone |
From the junction with Woolley Road to outside property No. 110 |
Completed |
|
Shropshire Terrace |
Maidstone |
From the Junction with Huntingdon Walk to the junction with Wiltshire Way |
Programmed to start on 7th April 2013 |
|
Surface Dressing Schemes
|
||||
Road Name |
Parish |
Extent of Works |
Current Status |
|
Castle Hill |
Thurnham |
From the junction with Thurnham Lane to End |
Completed |
|
Church Road |
Boughton Malherbe |
From Sandway crossroads to the property Sandway cottages |
Completed |
|
Bedmonton Lane |
Wormshill |
From approximately 100m above Danes Bottom Place to Yew Tree Farm, Wormshill |
Completed |
|
Greenway Forstal |
Harrietsham |
From the junction with Greenway Court Road to the junction with the A20 |
Completed |
|
Hubbard's Hill |
Lenham |
From the junction with A20 to 'The Harrow' Public House. |
Completed |
|
Woodcock Lane |
Boughton Malherbe |
Near the junction with Church Road to the junction with Coldbridge Lane |
Completed |
|
Stede Hill |
Harrietsham |
From property “Northgate Lodge” to the junction with Hogbarn Lane |
Completed |
|
Sandway |
Boughton Malherbe |
Bowley Lane through Boughton Malherbe including Church Road to the junction with Woodcock Lane , Platt's Heath. |
Completed |
|
Old Mill Road |
Leeds |
From the junction with the A20 to the Brogden Farmhouse junction. |
Completed |
|
Gossy Hill Road |
Frinstead |
From the junction at Frinstead Church to the junction with Bottom Pond Road. |
Completed |
|
New House Lane |
Headcorn |
From the junction with Water Lane to the junction with the A274 Biddenden Road. |
Completed |
|
South Street Road |
Stockbury |
From the junction with Yelsted Lane to the speed limit change west of Harrow Court. |
Completed |
|
Clapper Lane |
Staplehurst |
From the junction with Lindridge Road to the junction with Marden Road |
Completed |
|
Chuch Hill |
Boughton Monchelsea |
From the junction with B2163 Heath Road to just North of Boughton Place |
Completed |
|
Redwall Lane |
linton |
From the junction with the A229 Linton Hill to the junction with Bonflower Lane |
Completed |
|
Teston Lane |
West Farleigh |
From the River Medway Bridge to the junction with Lower Road |
Completed |
|
Battle Lane |
Staplehurst |
From end of railway bridge approach to the junction with the B2079 Maidstone Road. |
Completed |
|
Lancet Lane |
Maidstone |
From the A229 Loose Road to the junction with Old Drive |
Completed |
|
School Lane |
Maidstone |
From the junction with Oxford Road to the junction with Willington Street |
Completed |
|
Bottom Pond Road |
Wormshill |
From the Corner by “Copes Farm” (Near church) to the junction at “Well Cottage” |
Completed |
|
Husheath Hill |
Colliers Green |
From the junction with Curtis Green Lane to the junction with Hart Heath Farm Road |
Completed |
|
Old Whetsted Road |
Paddock Wood |
Whole length |
Completed |
|
Machine Resurfacing – Contact Officer Russell Boorman
|
||||
Road Name |
Parish |
Extent of Works |
Current Status |
|
Loose Road |
Maidstone |
From the junction with Hearther Drive to The Wheatsheaf Public House |
Programmed to start 25/02/13 - 08/03/13 |
|
Poplar Grove |
Allington |
From its junction with the A20 London Rd for the entire length |
Programmed to start 10/04/13 - 11/04/13 |
|
A20 London Road |
Allington |
From its junction with Palmer Rd –its junction with Buckland Lane |
Programmed to start 12/04/13 - 15/04/13 |
|
Mote Road |
Maidstone |
At the junction with Mote Road and Romney Place |
Completed |
|
Hope Street |
Maidstone |
From its junction with Sandlings Lane to its junction with Staceys Street (inc. Alexander Street southern section) |
To be programmed April 2013 |
|
Thornhill Place |
Maidstone |
From its junction with John Street to its junction with Fisher St. |
To be programmed April 2013 |
|
Staceys Street |
Maidstone |
On the approach to the Pedestrian crossing at its junction with Staceys Street |
Completed |
|
Egremont Road |
Bearsted |
The Cul-de-sac section outside school entrance |
To be programmed April 2013 |
|
Royston Road |
Bearsted |
From its junction with Spot Lane to its junction with Madginford Road |
Programmed to start and complete on 25/03/13 |
|
Heath Road Linton |
Maidstone |
At the junction with Hubbards Lane |
Completed |
|
Chart Corner |
Boughton Monchelsea |
From its junction with Plough Went Rd to its junction with Amber Lane |
Programmed to start and complete on the 04/04/13 |
|
Plough Wents Road |
Boughton Monchelsea |
From its junction with York house to its junction with Lested Lane |
Programmed to start and complete on the 05/04/13 |
|
Station Road Staplehurst |
Maidstone |
At its junction with Station Approach |
Completed |
|
Staplehurst High Street |
Maidstone |
On the approaches to the Pelican crossing |
Completed |
|
Heath Road Boughton Monchelsea |
Maidstone |
Outside property called Dean Orchard |
Completed |
|
Heath Road |
Langley |
From its junction with Horseshoes to its junction with Heath Lane |
To be programmed for April 2013 |
|
Smiths Hill |
East Farleigh |
Whole Length |
Completed |
|
Aspian Drive |
Coxheath |
From the junction with Park Way for the entire length |
To be programmed for April 2013 |
|
Hampstead Lane Yalding |
Maidstone |
On the approach to the Railway crossing East of Allington Lock |
Completed |
|
Loose Road |
Maidstone |
At its junction with Lancet Lane |
Completed |
|
Lower Street Leeds |
Maidstone |
At its junction with Wykeham Grove |
Completed |
|
Penfold Hill Leeds |
Maidstone |
On the approach to Bridge over the River Len |
Completed |
|
Footway Improvement - Contact Officer Wendy Boustead
|
||||
Road Name |
Parish |
Extent and Description of Works |
Current Status |
|
High Street |
Headcorn |
From outside of the war memorial to outside No 2 and North Street the section outside of the churchyard – relaying existing blockwork and replacing where necessary |
Completed |
|
Gabriels Hill |
Maidstone |
Both sides from the junction with High Street to the junction with Palace Avenue – relaying blockwork on a concrete base and replacing where necessary |
Programmed to start on 25th February 2013 |
|
The Street |
Bredhurst |
Three sections of footway on the eastern side. Area 1 – outside of the school. Area 2 – from opposite the junction of Forge Lane to opposite Pickwick Motors. Area 3 – footpath to rear of grass verge opposite Stockings Meadow. Replacing tarmac surface on all sections. |
Currently on site due to complete on 1st February 2013 |
|
Poyntell Road |
Staplehurst |
Whole length – replacing tarmac surface |
Completed |
|
Slaney Road |
Staplehurst |
Whole length – replacing tarmac surface |
Completed |
|
Charlton Lane |
West Farleigh |
Eastern side of the footway from near to the property Sunhyl to the end of the footway south of the property Elmscroft – replacing tarmac and kerbs where necessary |
Completed |
|
Aspian Drive |
Coxheath |
Eastern footway from opposite 28 to opposite 19 – replacing concrete with tarmac surface |
Programmed to start on 25th February 2013 |
|
Lower Road |
West Farleigh |
Western footway for the whole length – replacing tarmac surface |
Programmed to start on 11th February 2013 |
|
Fordcombe Close |
Maidstone |
Whole length – replacing tarmac surface |
Completed |
|
Hartley Close |
Maidstone |
Whole length – replacing tarmac surface |
Completed |
|
Burgess Hall Drive |
Maidstone |
Whole length – replacing tarmac surface |
Completed |
Appendix B – Drainage Repairs & Improvements
Drainage Repairs & Improvements - Contact Officer Emma Philpott
|
|||
Parish |
Description of Works |
Current Status |
|
Babylon Lane. |
Sutton Valence |
Road Closure for 8 days to install drainage o/s property “Kenmal” to alleviate localised flooding |
Programmed to start on 4th February 2013 |
Kenward Road |
Yalding |
Road Closure for 3 days for ditching works and carriageway patching |
Programmed to start on 18th January 2013 |
Appendix C – Street Lighting
Lamp Replacement Scheme - The columns below currently have orange lights, these will be replaced with much more efficient white lights
Street Lighting Lamp Replacement – Contact Officer Al Tanriverdi
|
|||
Road Name |
Column Ref |
Location |
Status |
Anglesey Avenue |
KAAY001 |
J/W LOOSE ROAD |
March 2013 |
Anglesey Avenue |
KAAY002 |
O/S 1C |
March 2013 |
Anglesey Avenue |
KAAY003 |
O/S 6 |
March 2013 |
Anglesey Avenue |
KAAY004 |
O/S 12/14 |
March 2013 |
Anglesey Avenue |
KAAY005 |
O/S 20 |
March 2013 |
Anglesey Avenue |
KAAY006 |
OPP 7 |
March 2013 |
Anglesey Avenue |
KAAY007 |
O/S 13 LHS |
March 2013 |
Anglesey Avenue |
KAAY008 |
O/S 30 |
March 2013 |
Anglesey Avenue |
KAAY009 |
O/S 23 |
March 2013 |
Anglesey Avenue |
KAAY010 |
O/S 50 |
March 2013 |
Anglesey Avenue |
KAAY011 |
S/O 72 IONA ROAD |
March 2013 |
Anglesey Avenue |
KAAY012 |
O/S 58 |
March 2013 |
Anglesey Avenue |
KAAY013 |
O/S 64 |
March 2013 |
Anglesey Avenue |
KAAY014 |
O/S 43/45 |
March 2013 |
Anglesey Avenue |
KAAY015 |
O/S 51 |
March 2013 |
Anglesey Avenue |
KAAY016 |
O/S 66/68 |
March 2013 |
Anglesey Avenue |
KAAY017 |
O/S 72 |
March 2013 |
Anglesey Avenue |
KAAY018 |
OPP 76/78 |
March 2013 |
Anglesey Avenue |
KAAY019 |
O/S 82 |
March 2013 |
Anglesey Avenue |
KAAY020 |
S/O 26 LANCET LANE |
March 2013 |
Cranborne Avenue |
KCGL001 |
OPP 64 |
March 2013 |
Cranborne Avenue |
KCGL002 |
O/S 50A/52 |
March 2013 |
Cranborne Avenue |
KCGL003 |
O/S 46/48 |
March 2013 |
Cranborne Avenue |
KCGL004 |
O/S 45/47 |
March 2013 |
Cranborne Avenue |
KCGL005 |
O/S 32A |
March 2013 |
Cranborne Avenue |
KCGL006 |
O/S 33 |
March 2013 |
Cranborne Avenue |
KCGL007 |
O/S 28 |
March 2013 |
Cranborne Avenue |
KCGL008 |
O/S 22 |
March 2013 |
Cranborne Avenue |
KCGL009 |
O/S 15 |
March 2013 |
Cranborne Avenue |
KCGL010 |
O/S 10 |
March 2013 |
Cranborne Avenue |
KCGL011 |
O/S 5 |
March 2013 |
Cranborne Avenue |
KCGL012 |
O/S 8 LHS |
March 2013 |
Cranborne Avenue |
KCGL013 |
OPP 4 |
March 2013 |
Cranborne Avenue |
KCGL014 |
O/S 2A/2B |
March 2013 |
Cranborne Avenue |
KCGL015 |
S/O 247 LOOOSE ROAD |
March 2013 |
Lismore Close |
KLBT001 |
O/S 3 |
March 2013 |
Ringwood Road |
KRAZ001 |
O/S 8 LYNDHURST ROAD |
March 2013 |
Ringwood Road |
KRAZ002 |
O/S 35/37 |
March 2013 |
Ringwood Road |
KRAZ003 |
O/S 29 |
March 2013 |
Ringwood Road |
KRAZ004 |
O/S 21/23 |
March 2013 |
Ringwood Road |
KRAZ005 |
O/S 11 |
March 2013 |
Ringwood Road |
KRAZ006 |
O/S 2/4
|
March 2013 |
Sheppey Road |
KSBG001 |
O/S 7 |
March 2013 |
Sheppey Road |
KSBG002 |
O/S 14 |
March 2013 |
Sheppey Road |
KSBG003 |
O/S 21 |
March 2013 |
Sheppey Road |
KSBG004 |
O/S 25 |
March 2013 |
Sheppey Road |
KSBG005 |
O/S 33 |
March 2013 |
Sheppey Road |
KSBG006 |
O/S 34/36 |
March 2013 |
Sheppey Road |
KSBG007 |
O/S 49 |
March 2013 |
Sheppey Road |
KSBG008 |
O/S 63 |
March 2013 |
Sheppey Road |
KSBG009 |
O/S 52 |
March 2013 |
Sheppey Road |
KSBG010 |
O/S 83 |
March 2013 |
Sheppey Road |
KSBG011 |
O/S 91 |
March 2013 |
Arran Road |
KABE001 |
O/S 4 |
March 2013 |
Arran Road |
KABE002 |
O/S 10 |
March 2013 |
Arran Road |
KABE003 |
O/S 18 |
March 2013 |
Farne Close |
KFAM001 |
O/S 2 |
March 2013 |
Farne Close |
KFAM002 |
O/S 3/4 |
March 2013 |
Marion Crescent |
KMBK001 |
O/S 1a |
March 2013 |
Marion Crescent |
KMBK002 |
O/S 10/12 |
March 2013 |
Marion Crescent |
KMBK003 |
O/S 7/5 |
March 2013 |
Marion Crescent |
KMBK004 |
O/S 30/32 |
March 2013 |
Marion Crescent |
KMBK005 |
O/S 25/27 |
March 2013 |
Marion Crescent |
KMBK006 |
O/S 35 |
March 2013 |
Marion Crescent |
KMBK007 |
O/S 54 |
March 2013 |
Marion Crescent |
KMBK008 |
OPP 56/58 |
March 2013 |
Marion Crescent |
KMBK009 |
O/S 64 |
March 2013 |
Marion Crescent |
KMBK010 |
O/S 72 |
March 2013 |
Marion Crescent |
KMBK011 |
O/S 80 |
March 2013 |
Marion Crescent |
KMBK012 |
O/S 86 |
March 2013 |
Marion Crescent |
KMBK013 |
O/S 96 |
March 2013 |
Marion Crescent |
KMBK014 |
O/S 81 |
March 2013 |
Marion Crescent |
KMBK015 |
O/S 110/110a |
March 2013 |
Marion Crescent |
KMBK016 |
O/S 93 |
March 2013 |
Marion Crescent |
KMBK201 |
1st IN FP TO SUTTON RD |
March 2013 |
Marion Crescent |
KMBK202 |
2nd IN FP TO SUTTON RD |
March 2013 |
Rushmead Drive |
KRCB001 |
J/W LOOSE ROAD |
March 2013 |
Rushmead Drive |
KRCB002 |
O/S 2 |
March 2013 |
Rushmead Drive |
KRCB003 |
O/S 5 |
March 2013 |
Rushmead Drive |
KRCB004 |
OPP ADJ 6 |
March 2013 |
Rushmead Drive |
KRCB005 |
O/S 8/9 |
March 2013 |
Rushmead Drive |
KRCB006 |
O/S 13 |
March 2013 |
Skye Close |
KSCD001 |
O/S 5 |
March 2013 |
Brockenhurst Avenue |
KBFO001 |
O/S 8 |
March 2013 |
Brockenhurst Avenue |
KBFO002 |
O/S 1/3 |
March 2013 |
Brockenhurst Avenue |
KBFO003 |
O/S 28/30 |
March 2013 |
Iona Road |
KIAD001 |
S/O 58 ANGLESEY AVENUE |
March 2013 |
Iona Road |
KIAD002 |
O/S 6 |
March 2013 |
Iona Road |
KIAD003 |
O/S 13 |
March 2013 |
Old Drive |
KOAJ001 |
O/S LOOSE COURT FARM |
March 2013 |
Old Drive |
KOAJ002 |
OPP 2 |
March 2013 |
Old Drive |
KOAJ003 |
O/S 6 |
March 2013 |
Rushmead Drive |
KRCB001 |
J/W LOOSE ROAD |
March 2013 |
Rushmead Drive |
KRCB002 |
O/S 2 |
March 2013 |
Rushmead Drive |
KRCB003 |
O/S 5 |
March 2013 |
Rushmead Drive |
KRCB004 |
OPP ADJ 6 |
March 2013 |
Rushmead Drive |
KRCB005 |
O/S 8/9 |
March 2013 |
Rushmead Drive |
KRCB006 |
O/S 13 |
March 2013 |
Staffa Road |
KSEH001 |
ADJ 2 |
March 2013 |
Staffa Road |
KSEH002 |
O/S 7 |
March 2013 |
Staffa Road |
KSEH003 |
O/S 14/16 |
March 2013 |
Lancet Lane |
KLAI001 |
J/W LOOSE ROAD |
March 2013 |
Lancet Lane |
KLAI002 |
O/S 6 |
March 2013 |
Lancet Lane |
KLAI003 |
O/S 5 |
March 2013 |
Lancet Lane |
KLAI004 |
O/S 7 |
March 2013 |
Lancet Lane |
KLAI005 |
O/S 18A/20 |
March 2013 |
Lancet Lane |
KLAI006 |
O/S 15 |
March 2013 |
Lancet Lane |
KLAI007 |
O/S 28 |
March 2013 |
Lancet Lane |
KLAI008 |
O/S 32 |
March 2013 |
Lancet Lane |
KLAI009 |
O/S 27/29 |
March 2013 |
Lancet Lane |
KLAI010 |
O/S 38 |
March 2013 |
Lancet Lane |
KLAI011 |
O/S 37 |
March 2013 |
Lancet Lane |
KLAI012 |
O/S 39 |
March 2013 |
Porchester Close |
KPDM001 |
O/S 2 |
March 2013 |
Porchester Close |
KPDM002 |
OPP 6 |
March 2013 |
Porchester Close |
KPDM003 |
OPP 7 |
March 2013 |
Porchester Close |
KPDM004 |
O/S 16 |
March 2013 |
Porchester Close |
KPDM005 |
ADJ 10 |
March 2013 |
Sevington Park |
KSBA001 |
J/W LANCET LANE |
March 2013 |
Sevington Park |
KSBA002 |
ADJ 37 |
March 2013 |
Sevington Park |
KSBA003 |
S/O 36 |
March 2013 |
Sevington Park |
KSBA004 |
O/S 7/8 |
March 2013 |
Sevington Park |
KSBA005 |
O/S 30 |
March 2013 |
Sevington Park |
KSBA006 |
S/O 8 |
March 2013 |
Sevington Park |
KSBA007 |
S/O 28 |
March 2013 |
Sevington Park |
KSBA008 |
O/S 15 |
March 2013 |
Sevington Park |
KSBA009 |
O/S 17 |
March 2013 |
Sevington Park |
KSBA010 |
O/S 20/21 |
March 2013 |
1.1 Legal Implications
1.1.1 Not applicable.
1.2 Financial and Value for Money Considerations
1.2.1 Not applicable.
1.3 Risk Assessment
1.3.1 Not applicable.
Contact: Carol Valentine / Richard Emmett 08458 247 800