Member Highway Fund

 

Member Highway Fund programme update for the Maidstone District.

 

The following schemes are those which have been approved for funding by both the relevant Member and by John Burr, Director of Highways and is up to date as of 13th January 2014.

 

The details below are for Highway Schemes only and do not detail contributions Members have made to other groups such as Parish or District Councils.

 

More detail on their schemes can accessed by each Member via the online database or by contacting their Member Highway Fund Engineer.

 

 

Overview of 2012/13 Schemes

 

 

Gary Cooke – Maidstone South East

 

Scheme

Status

B2163 Leeds – Gateway Improvements

Awaiting implementation

 

Dan Daley – Maidstone Central

 

Scheme

Status

Newbury Ave & Allington Way – Installation of warning signage and associated carriageway markings

Programmed

Feb 2014

 

Eric Hotson – Maidstone Rural South

 

Scheme

Status

Marden Road, Staplehurst – Extension of 30Mph Speed Limit

Awaiting TRO & implementation

 

Rob Bird – Maidstone Central

 

Scheme

Status

Newbury Ave & Allington Way – Installation of warning signage and associated carriageway markings

Programmed

Feb 2014

 

 

Paulina Stockell – Maidstone Rural West

 

Scheme

Status

St Margaret’s School, Collier Street – Installation of Interactive Sign and parking restrictions in the vicinity of St Margaret’s School

Awaiting implementation

 

 

 

 

 

 

Overview of 2013/14 Schemes

 

Brian Clark

 

Scheme

Status

Contribution to the KM Safety Campaign

MHF3 Handed over for Delivery

 

To plant 1 mature tree to replace one which was felled - Parkway

 

MHF3 Handed over for Delivery

 

KB49 Pathway resurface Old Drive to Anglesea Avenue

Works Completed

 

Installation of 2 no. timber bollards – Cripple Street

Works Completed

 

To reconstruct ramps either side of table top plus a 3m length of carriageway in the landing area either side of ramp feature.

MHF3 Handed over for Delivery

 

 

Dan Daley

 

Scheme

Status

To install pedestrians in road ahead lit warning signs on lamp columns either side of existing informal crossing point -Buckland Hill

MHF3 Handed over for Delivery

Carry out improvements to signing – Marigold Way

MHF3 Handed over for Delivery

Provide down-lighting at crossing point and warning sign for traffic coming round bend from Tonbridge Rd

MHF3 Handed over for Delivery

 

Provide Warning Sign on Upper Fant Rd for traffic travelling westwards into Hackney Rd together with SLOW marking on roadway

 

Works Completed

 

 

 

 

 

Eric Hotson

 

Scheme

Status

New 30mph interactive speed sign – A229 by Church Green

MHF3 Handed over for Delivery

To install timber bollards to prevent parking on the footway – Gybbon Rise

MHF3 Handed over for Delivery

 

 

 

 

 

 

 

 

Gary Cooke

 

Scheme

Status

Installation of timber bollards to prevent inconsiderate parking at school pick up and drop off times – Wexford Place

Works completed

An additional parking bay in Buckingham Row

Works completed

To install Unsuitable for HGVs signage in Downswood

MHF3 Handed over for Delivery

 

 

Ian Chittenden

 

Scheme

Status

Contribution for the replacement of 2 flower beds, including new trees and shrubs – Heathorn Street

Works completed

To install a directional sign for Maidstone Football Club

Works completed

To replace or remove trees within this division

MHF3 Handed over for Delivery

 

 

 

Jenny Whittle

 

Scheme

Status

To install Unsuitable for HGVs signage – Rayners Hill

MHF3 Handed over for Delivery

To install Unsuitable for HGVs signage – A20 before the Broomhill Road junction

MHF3 Handed over for Delivery

 

Paul Carter

 

Scheme

Status

Installation of ‘Cyclists Dismount’ signs – Ragstone Road

Works completed

To make a contribution to PROW for resurfacing the top 20 metres of path - Pathway KM79 in Bearsted by the BP Garage.

 

Works completed

 

 

Paulina Stockell

 

Scheme

Status

To install village gateway with welcome to Hunton sign, remove redundant posts, relocate exisiting footpath sign and install marker posts

MHF3 Handed over for Delivery

Installation of School Warning signs – Lower Road, near St Helens school

Works completed

Road marking improvements – various locations in East Farleigh

MHF3 Handed over for Delivery

 

Rob Bird

 

Scheme

Status

Install pedestrians in road ahead lit warning signs on lamp columns either side of existing informal crossing point. Existing lamp columns are unable to house the new lit signs installations so will be replaced as part of the works -Buckland Hill

MHF3 Handed over for Delivery

Carry out improvements to signing – Marigold Way

MHF3 Handed over for Delivery

Provide down-lighting at crossing point and warning sign for traffic coming round bend from Tonbridge Rd

MHF3 Handed over for Delivery

 

Provide Warning Sign on Upper Fant Rd for traffic travelling westwards into Hackney Rd together with SLOW marking on roadway

MHF3 Handed over for Delivery